| Plan Review Stops For Permit 10030517 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2010-03-30 |
|
|
Cont ID |
|
| Sent By |
kconrad |
Date |
2010-03-30 |
Time |
13:42 |
Rev Time |
0.00 |
| Received By |
kconrad |
Date |
2010-03-30 |
Time |
13:42 |
Sent To |
|
|
| Notes |
| 2010-03-30 13:44:19 | PERFORMED A PRELIMINARY INSPECTION ON 3/25/10. THE WORK | | | WAS COMPLETED AT THIS TIME. THE PROJECT VALUATION WAS | | | INCREASED TO $5000.00 AND 4X FEE WAS ADDED. REQUIRE A | | | SEPARATE ELECTRICAL INSPECTION. |
|
|
|