Plan Review Details - Permit 10030048
Plan Review Stops For Permit 10030048
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2010-03-19 Cont ID  
Sent By dwise Date 2010-03-19 Time 18:22 Rev Time 0.00
Received By dwise Date 2010-03-19 Time 18:22 Sent To  
Notes
2010-03-19 18:24:43APPROVED WITH SPECIFIC CONDITIONS TO PERMIT WHICH HAVE
 BEEN AGREED TO BY OWNER AND CONTRACTOR AS FOLLOWS:
 EXHIBIT ???A??? TO REVISION 10030048 TO PERMIT 09020618
  
 ZONING CONDITIONS:
 1. SEPARATE PERMITS SHALL BE APPLIED FOR AND OBTAINED
 FOR LANDSCAPE IMPROVEMENTS AND THESE SHALL BE INSTALLED
 AND INSPECTED PRIOR TO FINAL APPROVAL FOR PARKING LOT.
 SAID LANDSCAPE IMPROVEMENTS SHALL BE PROTECTED FROM
 DAMAGE BY A CONCRETE CURB.
 2. ALL SPACE RE-STRIPING SHALL BE DOUBLE LINE PER CITY
 ORDINANCE.
 ENGINEERING CONDITIONS:
 1. ENTRANCE ROAD MUST BE GROUND AND PROTECT/REPLACE
 EXISTING COUNTY TRAFFIC LOOPS.
 2. INSTALL PEDESTRIAN CROSSING AT ENTRANCE
 3. DO NOT INSTALL STOP SIGN AT BANYAN
 4. INSTALL NO PARKING SIGNS IN FRONT OF DUMPSTER.
 5. NO BIRDBATHS WILL BE ALLOWED. ENSURE PROPER
 DRAINAGE.
 6. OBTAIN RIGHT OF WAY PERMIT FOR MODIFICATIONS IN
 RIGHT OF WAY IN FLAGLER DRIVE.
 FIRE DEPARTMENT CONDITIONS:
 1. PROVIDE AND MAINTAIN 20??? CLEAR LANE AT ENTRANCE NO
 BOLLARDS OR OTHER OBSTRUCTIONS ALLOWED.
 2. SEPARATE APPLICATION, PLANS, AND PERMITS ARE
 REQUIRED FOR ANY PROPOSED SECURITY GATES. ANY SUCH
 PLANS WILL BE REQUIRED TO DEMONSTRATE PRESENCE OF A
 KNOX KEY SWITCH.
 3. SUITABLE SIGNAGE SHALL BE PROVIDED ALONG THE
 BULKHEAD ADJACENT TO THE PAVER ROAD FOR ALL DOCKS WHICH
 INDICATES ???NO PARKING, FIRE LANE, BY ORDER OF POLICE
 AND FIRE DEPARTMENTS.
 4. NO PARKING SIGNS SHALL BE PLACED ALONG ALL FIRE LANE
 AREAS IN ADDITION TO PAVEMENT MARKINGS.
 5. THE FIRE LANE NEXT TO THE DOCKS NEEDS TO BE
 RELOCATED ADJACENT TO THE EXISTING FIRE DEPARTMENT
 CONNECTION AND HYDRANT IN ORDER TO PROVIDE THE
 MANDATORY CLEARANCES REQUIRED BY LAW.
 CONSTRUCTION SERVICES CONDITIONS:
 1. ALL EXISTING HANDICAP SPACES MUST BE RELOCATED TO
 WEST SIDE OF CENTER PARKING AREA AND CONFIGURED SO THAT
 UTILIZATION OF EACH SPACE SHALL NOT REQUIRE TRAVEL
 BEHIND ANY PARKED VEHICLES INCLUDING THOSE IN
 ACCESSIBLE SPACES.
 2. ALL SIGNAGE AND STRIPING FOR ACCESSIBLE SPACES SHALL
 COMPLY WITH CHAPTER 11 OF THE FBC.
 3. TRAVEL AISLE FOR ACCESSIBILITY SHALL BE ROUTED
 THROUGH ISLANDS ALONG WEST SIDE OF PARKING FIELD AND
 THEN ROUTED EAST ALONG NORTH SIDE OF PARKING ISLANDS
 BEFORE CROSSING DRIVE AISLE TO RAMP. THIS AISLE SHALL
 BE FULLY STRIPED PURSUANT TO CHAPTER 11 FBC.
 4. DETECTIBLE WARNINGS SHALL BE PROVIDED AT ALL
 LOCATIONS THE TRAVEL AISLE ENTERS/CROSSES TRAVEL LANES.
 5. SEPARATE APPLICATION, PLANS AND PERMIT SHALL BE
 REQUIRED FOR PROPOSED IRRIGATION WORK.
 6. REVISED ???AS-BUILT??? DRAWINGS SHALL BE SUBMITTED
 AND ACCEPTED UPON REVIEW BY THE CONSTRUCTION SERVICES
 DEPARTMENT WHICH BEAR THE SIGNATURE AND SEAL OF THE
 DESIGN PROFESSIONAL FOR THE PROJECT (BOHLER
 ENGINEERING).
  
  
 END OF CONDITIONS
  
  

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2010-03-19 Cont ID  
Sent By dwise Date 2010-03-19 Time 18:22 Rev Time 0.00
Received By dwise Date 2010-03-19 Time 18:22 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2010-03-10 Cont ID  
Sent By dlauderm Date 2010-03-10 Time 11:01 Rev Time 3.00
Received By dlauderm Date 2010-03-09 Time 10:11 Sent To FIRE
Notes
2010-03-10 11:05:28REVIEWER: DEAN LAUDERMILK, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPARTMENT
 EMAIL: [email protected], DIRECT PHONE: (561)
 494-1083, FAX: (561) 494-1116.
 1. STRIPING:
 A. SHOW STRIPPED PEDESTRIAN CROSS WALK AT BANYAN AND
 FLAGLER.
 B. NO DETAILS SUPPLIED FOR PARKING SPACES OR ADA
 REQUIREMENTS. I HAVE ATTACHED A COPY TO THE PLAN.
 C. SUGGEST RELOCATING THE ADA PARKING SPOTS NEXT TO THE
 EXIT. A DELINEATED PATH (BLUE THERMOPLASTIC) NEEDS TO
 BE USED TO A SIDEWALK.
 D. A DELINEATED PATH (BLUE THERMOPLASTIC) NEEDS TO BE
 USED TO A SIDEWALK/RAMP FOR ALL OF THE NORTH ADA
 PARKING SPACES.
 2. SIGNAGE:
 A. REMOVE STOP SIGN AT EXIT AT BANYAN, THIS IS A
 TRAFFIC LIGHT REGULATED INTERSECTION.
 B. INSTALL NO PARKING SIGNS IN FRONT OF THE
 DUMPSTER(S).
 3. PAVING:
 A. WHERE WILL THE STRIPING START? I WOULD SUGGEST ABOUT
 TWO FEET OUT INTO FLAGLER AT BANYAN. THE AREA WILL NEED
 TO BE GROUND DOWN SO THE PAVEMENT CAN START WITH OUT
 "FEATHERING". YOU SHOULD BE AWARE OF THE PALM BEACH
 COUNTY MAGNETIC LOOPED WIRES IN THE PAVEMENT IN THIS
 AREA. CAUTION NEEDS TO BE USED WHEN SAW CUTTING SO THE
 LINES ARE NOT CUT. OTHERWISE THE TRAFFIC SIGNAL WILL
 NOT WORK.
 B. PLAN DOES NOT SHOW HOW THE PAVEMENT WILL DRAIN. NO
 "BIRD BATHS" WILL BE ALLOWED.
 4. LANDSCAPE PLAN:
 A. NO IRRIGATION PLAN SUBMITTED. IT IS MY UNDERSTANDING
 THAT THE CONTRACTOR HAS ALREADY HOOKED UP TO THE CITY
 SPECIAL EVENTS METER. THIS CONNECTION NEEDS TO BE
 REMOVED. THERE IS AN EXISTING IRRIGATION SYSTEM SERVING
 THE WHOLE SITE, THE 2" METER AND BACKFLOW PREVENTER ARE
 LOCATED NEXT TO THE DUMPSTER. THIS SERVICE HAS BEEN
 DISCONTINUED BY THE OWNER BACK IN FEBRUARY 2009 AND
 NEEDS TO REACTIVATED. CALL PUBLIC UTILITIES CUSTOMER
 SERVICE AT 822-1300 FOR THE FEES REQUIRED.
 B. THE LANDSCAPE PLAN DOES NOT COVER THE LANDSCAPE
 REQUIRED AROUND THE DUMPSTER ENCLOSURE. THIS IS
 UNDERSTANDABLE, SINCE THERE IS NO DUMPSTER ENCLOSURE,
 ONE IS REQUIRED, AS WELL AS THE LANDSCAPING.
 5. FIRE DEPT. ISSUES:
 A. NORMALLY AT LEAST ONE OF THE ENTRANCE/EXIT LANES
 NEEDS TO BE 20' WIDE LANE FOR ACCESS FOR A FIRE TRUCK,
 THIS IS NOT SHOWN ON THE PLAN.
 B. NORMALLY NO PARKING IS ALLOWED IN FRONT OF AN FDC
 AND HYDRANT. IN FRONT OF THE DOCK THERE IS
 A CONFLICT, THE PARKING NEEDS TO BE TAKEN OUT AND
 MARKED "FIRE LANE", ALSO THE HYDRANT AND FDC NEED TO BE
 SHOWN.
 C. THOUGH NOT CALLED OUT THIS FACILITY WILL BE GATED. A
 "KNOX BOX" SET UP SHOULD BE REQUIRED.
 D. YOU WILL NEED TO DISCUSS THE ABOVE ISSUES WITH THE
 FIRE MARSHALL AND THEY WILL NEED TO REVIEW IT FOR OTHER
 ISSUES, SUCH AS THE DESIGNATED "FIRE LANES".
 E. THERE IS A "FIRE LANE" ACCESS ON THE NORTH END OF
 THIS PARKING LOT, THRU THE CONDO TO THE DOCKS. I
 BELIEVE THIS AREA SHOULD BE STRIPED AND MARKED "FIRE
 LANE, NO PARKING" SINCE IT IS THE FIRE LANES ACCESS TO
 YOUR DOCKS. I SAW TWO TRUCKS PARKED IN THIS AREA TODAY
 BLOCKING THE ACCESS.
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2010-03-19 Cont ID  
Sent By mcarsill Date 2010-03-19 Time 15:52 Rev Time 0.00
Received By mcarsill Date 2010-03-19 Time 15:51 Sent To  
Notes
2010-03-19 15:52:35"APPROVED PER SPECIFIC CONDITIONS OF APPROVAL ATTACHED
 TO PERMIT"
  
  
 MIKE CARSILLO, BATTALION CHIEF
 BUREAU OF FIRE PREVENTION

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2010-03-11 Cont ID  
Sent By mcarsill Date 2010-03-11 Time 07:48 Rev Time 0.00
Received By mcarsill Date 2010-03-11 Time 07:42 Sent To  
Notes
2010-03-11 07:48:42SITE LANDSCAPING AND RE-STRIPING PARKING LOT
 PALM HARBOR MARINA
 400 NORTH FLAGLER DRIVE
  
 1. SEPARATE PLANS AND PERMITS REQUIRED FOR ANY SECURITY
 GATES.
  
 2. A KNOX-BOX KEY SWITCH WILL BE REQUIRED TO OPEN ANY
 SECURITY FEATURES. PLEASE CONTACT WWW.KNOXBOX.COM TO
 ORDER KEY SWITCH.
  
 3. SUITABLE SIGNS SHALL BE PROVIDED ALONG THE BULKHEAD
 ADJACENT TO THE PAVER ROAD FOR A,B, AND C DOCKS "NO
 PARKING FIRE LANE BY ORDER OF THE POLICE AND FIRE
 DEPARTMENTS"
  
 4. AREAS THAT ARE MARKED FIRE LANE NO PARKING SHALL
 HAVE SUITABLE SIGNAGE.
  
 5. PLEASE CALL OUT ON THE PLANS THE MINIMUM 20 FEET
 REQUIRED FOR FIRE RESCUE ACCESS.
  
 6. FIRE HYDRANTS SHALL BE PROVIDED WITH A MINIMUM OF AT
 LEAST 7 1/2 FEET CLEARANCE TO THE FRONT AND SIDES AND A
 MINIMUM OF 4 FEET TO THE REAR.
  
  
 DENIED
  
 MIKE CARSILLO, BATTALION CHIEF
 BUREAU OF FIRE PREVENTION
 (561) 804-4709 PHONE
 (561) 804-4774 FAX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By rmcdouga Date 2010-03-03 Time 10:09 Sent To  
Notes
2010-03-03 10:13:03REVISION SENT TO ZONING/LANDSCAPE

Review Stop L LANDSCAPING
Rev No 2 Status P Date 2010-03-19 Cont ID  
Sent By rkussner Date 2010-03-19 Time 17:24 Rev Time 0.00
Received By rkussner Date 2010-03-19 Time 17:24 Sent To  
Notes
2010-03-19 17:27:53***APPROVED LANDSCAPE REVIEW***
  
 MUST APPLY FOR LANDSCAPE AND IRRIGATION PERMITS. ALL
 PREVIOUS LANDSCAPE COMMENTS MUST BE ADDRESSED.
 LANDSCAPE PLANS MUST BE APPROVED, ISSUED AND ALL WORK
 MUST BE SUCCESSFULLY INSPECTED PRIOR TO ISSUANCE OF
 C/O.
  
 RAK

Review Stop L LANDSCAPING
Rev No 1 Status F Date 2010-03-05 Cont ID  
Sent By rkussner Date 2010-03-05 Time 16:36 Rev Time 0.00
Received By rkussner Date 2010-03-05 Time 16:36 Sent To  
Notes
2010-03-05 16:53:18***LANDSCAPE REVIEW FAILED***
  
 1. THE PROPOSED WORK REQUIRES SEPARATE PERMITS FOR
 STRIPING, LANDSCAPING AND IRRIGATION. WHEN APPLYING FOR
 THE LANDSCAPE PERMIT, PLEASE SUBMIT TWO COPIES OF THE
 APPROVED LANDSCAPE PLAN AND A CERTIFIED COST ESTIMATE
 THAT INCLUDES THE TOTAL COST OF ALL LANDSCAPE MATERIALS
 AND LABOR, BROKEN DOWN INTO UNIT COST.
  
 2. PURSUANT TO SECTION 94-442 (D), PRIVATE LAND AND
 PUBLIC RIGHTS-OF-WAY BETWEEN STREET OR SIDEWALK
 SURFACES AND REQUIRED BUFFER STRIPS AND LANDSCAPED OPEN
 SPACE AREAS SHALL BE PLANTED WITH GRASS. GRASS AREAS
 SHALL BE SODDED. THIS APPLIES TO THE ENTIRE SITE,
 INCLUDING THE ADJACENT RIGHT-OF-WAY. SEEDING IS NOT
 PERMITTED.
  
 3. PURSUANT TO SECTION 94-443 (C) (5) (A), LANDSCAPE
 AREAS SHALL BE SEPARATED FROM VEHICULAR USE AREAS BY
 NONMOUNTABLE, REINFORCED CONCRETE CURBING OF THE TYPE
 CHARACTERIZED AS "TYPE D".
  
 4. PURSUANT TO SECTION 94-445 (4) (G) (3) (II) IN ALL
 AREAS THAT ARE TO BE PLANTED IN A CULTIVATED LANDSCAPE,
 IRRIGATION SYSTEMS SHALL BE DESIGNED TO HAVE120 PERCENT
 COVERAGE. THE PLAN SPECIFIED 100% COVERAGE.
  
 5. PLEASE PROVIDE A STRIPING DETAIL. ALL PARKING STALLS
 ARE REQUIRED TO BE DOUBLE STRIPED. AN APPROVED DETAIL
 CAN BE OBTAINED FROM THE FRONT DESK OF THE PLANNING AND
 ZONING DEPARTMENT.
  
 6. THE HANDICAP SPACES NEAR THE ENTRY AND THE OTHERS
 TOWARD THE NORTH END DO NOT SEEM TO FUNCTION. THEY WILL
 NEED FURTHER REVIEW BY CONSTRUCTION SERVICES AND/OR
 ENGINEERING.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ROBERT
 KUSSNER @ (561) 822-1462.
  
  
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2010-03-19 Cont ID  
Sent By dwise Date 2010-03-19 Time 18:21 Rev Time 0.00
Received By dwise Date 2010-03-19 Time 18:21 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2010-03-19 Cont ID  
Sent By dwise Date 2010-03-19 Time 18:21 Rev Time 0.00
Received By dwise Date 2010-03-19 Time 18:21 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2010-03-19 Cont ID  
Sent By aaponte Date 2010-03-19 Time 15:45 Rev Time 0.00
Received By aaponte Date 2010-03-19 Time 15:45 Sent To  
Notes
2010-03-19 15:47:01APPROVED PER SPECIFIC CONDITIONS OF APPROVAL ATTACHED
 TO PERMIT.

Review Stop Z ZONING
Rev No 1 Status F Date 2010-03-09 Cont ID  
Sent By aaponte Date 2010-03-09 Time 10:53 Rev Time 0.00
Received By aaponte Date 2010-03-09 Time 10:53 Sent To  
Notes
2010-03-09 11:05:291. HANDICAP SPACES SHALL PROVIDE AN ACCESSIBLE ROUTE IN
 COMPLIANCE WITH STATE REQUIREMENTS.
 2. PLANTING AREAS SHALL BE PROTECTED FROM CARS BY A
 CURB.
 3. PARKING LOT MEDIANS SHALL BE SODDED AND IRRIGATED
 WITH ORIGINAL IRRIGATION SYSTEM.
 4. STRIPING SHALL BE DONE ACCORDING TO CITY'S
 STANDARDS.