Plan Review Details - Permit 10020411
Plan Review Stops For Permit 10020411
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2010-12-06 Cont ID  
Sent By rmcdouga Date 2010-12-06 Time 10:36 Rev Time 0.00
Received By rmcdouga Date 2010-12-06 Time 10:36 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2010-11-19 Cont ID  
Sent By rmcdouga Date 2010-02-24 Time 10:46 Rev Time 0.00
Received By rmcdouga Date 2010-02-24 Time 10:46 Sent To  
Notes
2010-02-24 11:08:002001 FBC
  
 REVISION DENIED
  
 1) THE NUMBERING ON THE WINDOW AND DOOR INSTALLATION
 SCHEDULE (QUOTE) DOES NOT CORRESPOND TO THE KEY PLAN.
 PLEASE CORRECT.
  
 2) THE PRODUCT APPROVAL SUBMITTED FOR THE CASEMENT
 WINDOW IS FOR A NON-IMPACT RATED WINDOW. THE
 INSTALLATION SCHEDULE (QUOTE) SPECIFIES THE WINDOW AS
 IMPACT RATED. SUBMIT THE CORRECT PRODUCT APPROVAL OR
 SUBMIT PRODUCT APPROVALS FOR THE IMPACT PROTECTION
 SYSTEM THAT WILL BE INSTALLED. DCA RULE 9B-72
  
 3) THE REVISED COMPONENT AND CLADDING EVALUATION IS
 REQUIRED TO HAVE THE ENGINEER'S ORIGINAL SIGNATURE AND
 SEAL. COPIES ARE NOT ACCEPTABLE. BECAUSE THE ENGINEER
 THAT PREPARED THE REVISED OPENING PRESSURES IS NOT THE
 ARCHITECT OR ENGINEER OF RECORD FOR THE STRUCTURE, THE
 DESIGNER OF RECORD IS REQUIRED TO PERFORM A SHOP
 DRAWING REVIEW AND STAMP THE REVISED DRAWINGS OR THE
 NEW ENGINEER IS REQUIRED TO REVIEW AND ASSUME THE WORK
 OF THE ORIGINAL ENGINEER FOLLOWING THE PROCEDURE IN FAC
 61G15-27.
  
 4) THE STRUCTURE WAS PERMITTED UNDER THE 2001 FBC AND
 ASCE 7-98 IS THE REFERENCED STANDARD. THE REVISED C AND
 C CALCULATIONS WERE DONE USING ASCE 7-05. DUE TO THIS
 CHANGE, A SIGNED AND SEALED LETTER FROM THE NEW
 ENGINEER STATING THAT THIS CHANGE WILL NOT HAVE ANY
 ADVERSE EFFECT ON THE WINDLOAD DESIGN OF THE STRUCTURE
 IS REQUIRED.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2010-11-19 Cont ID  
Sent By rmcdouga Date 2010-11-19 Time 07:42 Rev Time 0.00
Received By rmcdouga Date   Time   Sent To  
Notes
2010-11-19 07:42:41TO R MCDOUGAL'S DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2010-02-24 Cont ID  
Sent By rmcdouga Date 2010-02-24 Time 12:24 Rev Time 0.00
Received By rmcdouga Date 2010-02-18 Time 08:06 Sent To  
Notes
2010-02-18 08:07:19INCOMING SENET TO R. MCDOUGAL