Plan Review Details - Permit 10020001
Plan Review Stops For Permit 10020001
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2010-02-17 Cont ID  
Sent By jgomez Date 2010-02-17 Time 15:37 Rev Time 0.00
Received By jgomez Date 2010-02-17 Time 15:37 Sent To  
Notes
2010-02-17 15:39:12CONTRACTOR FAXED LABORATORY CERTIFICATE SHOWING
 ARCHITECT AS THE ONE APPROVED BY MIAMI-DADE TO SIGN
 TEST REPORTS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2010-02-11 Cont ID  
Sent By jgomez Date 2010-02-11 Time 09:55 Rev Time 0.00
Received By jgomez Date 2010-02-11 Time 09:55 Sent To PC
Notes
2010-02-11 10:14:02REROOF CHECKLIST.
 2007 FBC WITH 2009 REVISIONS.
  
 1- TESTING APPLICATION STANDARD (TAS) 105 REPORT
 SUBMITTED NEEDS TO BE SIGNED AND SEALED BY A
 PROFESSIONAL ENGINEER OR BY A REGISTERED ROOF
 CONSULTANT AS REQUIRED BY SEC. 1.2 OF TAS NO. 105-98.
 REPORT SUBMITTED WAS SIGNED AND SEALED BY AN ARCHITECT.
 NEED TO BE SIGNED AND SEALED BY ANY ONE OF THE
 PROFESSIONALS LISTED ON TAS 105.
 ***NOTE: PLEASE MAKE SURE ORIGINAL ENGINEER'S SEAL AND
 SIGNATURE IS PROVIDED ON EACH REPORT SUBMITTED FOR
 PUBLIC RECORDS. AND, INCLUDE ALL THE ENGINEER'S
 INFORMATION AS REQUIRED BY CHAPTER 471 OF FLORIDA
 STATUTES.
  
 2- PRE-INSPECTION FINDINGS: HIGH MOISTURE AREAS MUST BE
 REMOVED TO DECK.
  
 JULIO GOMEZ
 COMBINATION COMMERCIAL PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2010-02-02 Cont ID  
Sent By jgomez Date 2010-02-02 Time 10:38 Rev Time 0.00
Received By jgomez Date 2010-02-02 Time 09:33 Sent To  
Notes
2010-02-02 10:38:46SENT TO KEN CONRAD'S DESK FOR PRE-INSPECTION. ROOF
 RECOVERY PROJECTS REQUIRE PRE-INSPECTION.