Plan Review Details - Permit 10010197
Plan Review Stops For Permit 10010197
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2010-02-02 Cont ID  
Sent By rmcdouga Date 2010-02-02 Time 08:11 Rev Time 0.00
Received By rmcdouga Date 2010-02-02 Time 08:11 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2010-01-14 Cont ID  
Sent By rmcdouga Date 2010-01-14 Time 07:24 Rev Time 0.00
Received By rmcdouga Date 2010-01-14 Time 07:24 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2010-02-02 Cont ID  
Sent By rmcdouga Date 2010-02-02 Time 08:11 Rev Time 0.00
Received By rmcdouga Date 2010-02-02 Time 08:11 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2010-02-02 Cont ID  
Sent By rmcdouga Date 2010-01-14 Time 10:31 Rev Time 0.00
Received By rmcdouga Date 2010-02-02 Time 08:10 Sent To  
Notes
2010-01-14 11:12:262007 FBC W/2009 REVISIONS
 2008 NEC
  
 DENIED BY ELECTRIC
  
 1) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATIONS AND DATA SHEETS FOR THE ELECTRIC POOL
 HEATER.
  
 2) FBC 13-612.AB.2.3.2 REQUIRES HEATED SWIMMING POOLS
 AND SPAS TO BE EQUIPPED WITH COVER DESIGNED TO MINIMIZE
 HEAT LOSS.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2010-02-01 Cont ID  
Sent By lmartine Date 2010-02-01 Time 16:50 Rev Time 0.00
Received By lmartine Date 2010-02-01 Time 16:50 Sent To  
Notes
2010-02-01 16:52:52GAVE TO ROBBIE
 ****************EXPEDITED*****************
 2ND RUN

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2010-01-20 Cont ID  
Sent By lmartine Date 2010-01-20 Time 16:44 Rev Time 0.00
Received By lmartine Date 2010-01-12 Time 16:50 Sent To  
Notes
2010-01-13 16:51:13**********************EXPEDITED********************
 GAVE TO ROBBIE

Review Stop P PLUMBING
Rev No 2 Status P Date 2010-02-02 Cont ID  
Sent By rmcdouga Date 2010-02-02 Time 08:42 Rev Time 0.00
Received By rmcdouga Date 2010-02-02 Time 08:42 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2010-01-14 Cont ID  
Sent By rmcdouga Date 2010-01-14 Time 11:13 Rev Time 0.00
Received By rmcdouga Date 2010-01-14 Time 11:13 Sent To Z
Notes
2010-01-14 11:24:482007 FBC W/2009 REVISIONS
  
 DENIED BY PLUMBING
  
 1) SUBMIT TWO COPIES OF THE SIMPLIFIED TDH CALCULATIONS
 USED TO DETERMINE THE TDH FOR THE POOL AND SPA THAT IS
 SPECIFIED ON THE PLANS. FBC R 4101.6.1
  
 2) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATIONS AND DATA SHEETS WHICH INCLUDE THE PUMP
 CURVE CHART FOR THE POOL PUMP THAT WILL BE INSTALLED.
 FBC R 4101.6.3 AND R4101.7.2
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714
 [email protected]

Review Stop Z ZONING
Rev No 1 Status P Date 2010-01-20 Cont ID  
Sent By kdfreema Date 2010-01-20 Time 08:48 Rev Time 0.00
Received By kdfreema Date 2010-01-20 Time 08:48 Sent To PC
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved