Plan Review Details - Permit 10010192
Plan Review Stops For Permit 10010192
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2010-02-08 Cont ID  
Sent By dpalmer Date 2010-02-08 Time 16:50 Rev Time 0.00
Received By dpalmer Date 2010-02-08 Time 16:41 Sent To  
Notes
2010-02-08 16:51:43REDLINED PLANS. SPECIFICATIONS FOR MTS STILL INDICATES
 UNIT WITH 2-POLE SINGLE PHASE BREAKERS HOWEVER THE
 RISER WAS REVISED TO THREE PHASE EQUIPMENT AND FEEDERS
 TO PANEL C>
 THIS WAS NOTED ON PREVIOUS REVIEW ALSO.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2010-01-14 Cont ID  
Sent By dpalmer Date 2010-01-14 Time 14:24 Rev Time 0.00
Received By dpalmer Date 2010-01-14 Time 14:24 Sent To  
Notes
2010-01-14 14:24:54** DENIED *
  
 1) NOTE: RISER HAS BEEN REVISED. PREVIOUS RISER
 INDICATE SERVICE CONDUCTORS ADEQUATE FOR 570AMP
 SERVICE. THIS WOULD HAVE BEEN BASED ON PREVIOUS PLANS
 INDICATING TWO SETS OF 300 MCM.
 THE NEW REVISED RISER NOW INDICATES A THREE PHASE
 SERVICE AND SERVICE ENTRANCE CONDUCTORS RATED AT
 460AMPS.
 310.16, 110.14
 PLEASE ALSO SEE THE MTS EQUIPMENT WAS ADJUSTED FROM
 600AMP RATED BREAKERS DOWN TO 200AMP RATED BREAKERS
 HOWEVER THESE ARE LISTED AS 2-POLE FOR SINGLE PHASE.
 HOW IS THIS POSSIBLE FOR THE THREE PHASE MAIN AND PANEL
 IN WHICH IT FEEDS? HOW IS THIS EQUIPMENT STILL THE SAME
 MODEL # AND SINGLE PHASE?
 230.70,230.71, 230.76,230.79, 110.3, 90.7. CODE
 SECTIONS GIVEN IN GENERAL. COORDINATION OF RISER,
 CONDUCTORS, BREAKERS AND EQUIPMENT NEEDS TO TAKE PLACE.
  
 2) NOTE: REVISION COVER SHEET REQUEST ANY INCREASE IN
 VALUE. NO AMOUNT WAS FILLED IN YET THE SERVICE
 EQUIPMENT ETC WOULD BE AN INCREASE BASED ON THE FACT
 NEW SERVICE IS NOW THREE ???PHASE. THREE PHASE
 EQUIPMENT ETC IS MORE EXPENSIVE THAN SINGLE PHASE.
 FBC 108.3
  
 3) NOTE: RISER INDICATES PANEL G BEING FED FROM PANEL B
 HOWEVER THERE IS NO PANEL G LISTED ON THE PANEL B
 SCHEDULE. SPACE 20,22 DOES INDICATE 70AMPS BREAKER
 HOWEVER NO LISTING FOR WHAT THIS IS FOR??
 PANEL A ON SCHEDULES DOES LIST THE PANEL G HOWEVER THE
 RISER DOES NOT SHOW PANEL G BEING FED FROM PANEL A.
 ** PLEASE COORDINATE ITEMS ON PLANS. REVISE LOAD
 CALCULATIONS ON ALL PANELS. PANEL B STILL INDICATES THE
 LOAD FOR PANEL G.
 230.70.230.71, 408.4, 215.5,220, ETC
 FBC 106.1.1, 106.1.2, 106.3.5 FOR CLARITY, AND
 COORDINATION OF RECORD PLANS.
  
  
 IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT
 TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO
 CONTACT THIS REVIEWER.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW II
 CONSTRUCTION SERVICES DEPARTMENT
 CITY OF WEST PALM BEACH
 561-805-6717
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2010-02-03 Cont ID  
Sent By rmcdouga Date 2010-02-03 Time 11:31 Rev Time 0.00
Received By rmcdouga Date 2010-02-03 Time 11:31 Sent To  
Notes
2010-02-03 11:31:42TO DEWEY PALMER'S DESK.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2010-01-14 Time   Rev Time 0.00
Received By lmartine Date 2010-01-12 Time 16:56 Sent To  
Notes
2010-01-12 16:57:31********************EXPEDITED*******************
 GAVE TO DEWEY


Account Summary | Usage Policy | Privacy Policy