| 2009-11-19 20:30:42 | PLANNING AND ZONING: **** FAILED **** |
| | |
| | 1. RESPOND TO COMMENTS IN WRITING. THE SUBMITTAL OF THE |
| | REQUESTED INFORMATION MAY GENERATE ADDITIONAL COMMENTS. |
| | |
| | 2. PROVIDE TWO (2) COPIES OF A CURRENT SURVEY, WHICH |
| | INCLUDES THE PROPERTY'S ADDRESS AND LEGAL DESCRIPTION. |
| | |
| | 3. PURSUANT TO SECTION 94-482 OF THE ZLDR: REQUIRED |
| | OFF-STREET PARKING SPACES FOR LESS THAN FOUR |
| | RESIDENTIAL DWELLING UNITS SHALL BE LOCATED ON THE |
| | PROPERTY ON WHICH THE UNITS ARE CONSTRUCTED. REQUIRED |
| | PARKING MAY BE LOCATED IN A FRONT YARD; HOWEVER, THE |
| | LESSER OF 1,000 SQUARE FEET OR 75 PERCENT OF THE FRONT |
| | YARD AREA MUST BE LANDSCAPED. PARKING AREAS LOCATED IN |
| | THE FRONT YARD SHALL BE SURFACED WITH A SMOOTH, |
| | NONDUSTING SURFACE IN COMPLIANCE WITH SUBSECTION |
| | 33-485(E). IT SHALL BE A VIOLATION OF THIS CHAPTER TO |
| | PARK ON ANY UNPAVED AREAS AS DESCRIBED IN THIS ARTICLE. |
| | |
| | PLEASE INDICATE SQUARE FOOTAGE OF ALL IMPERMEABLE |
| | SURFACES (EXISTING AND PROPOSED) LOCATED WITHIN THE |
| | FRONT YARD (FROM FRONT PROPERTY LINE TO THE FRONT |
| | BUILDING FACADE). |
| | |
| | 3. THE PROPOSED SKETCH SHOWS A WIDER APPROACH (28 |
| | FEET), A SEPARATE RIGHT-OF-WAY ("ROW") PERMIT SHALL BE |
| | OBTAINED FROM THE ENGINEERING DEPARTMENT, KEEP IN MIND |
| | THAT THE MAXIMUM WIDTH OF AN APPROACH FOR RESIDENTIAL |
| | IS 20 FEET. HOWEVER, IF THE PROPOSED WIDTH SHALL MEET |
| | COMMENT NUMBER 2 ABOVE FOR PERVIOUS AREA, OTHERWISE THE |
| | WIDTH OF THE DRIVEWAY AND APPROACH WILL HAVE TO BE |
| | REDUCED ACCORDINGLY. THE SKETCH NEEDS TO BE DRAWN ON A |
| | SITE PLAN OR SURVEY TO SCALE AND SHOW THE CONFIGURATION |
| | OF THE DRIVEWAY BASED ON THE PROPERTY LOT LINES AND |
| | BUILDING. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT ME. |
| | |
| | LINDA MIA FRANCO |
| | SENIOR PLANNER |
| | PLANNING AND ZONING DEPARTMENT |
| | TEL: (561) 822-1443 |
| | EMAIL: [email protected] |
| | |