| Plan Review Stops For Permit 09090199 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2009-09-21 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2009-09-21 |
Time |
08:46 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2009-09-21 |
Time |
08:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2009-09-14 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2009-09-14 |
Time |
16:26 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2009-09-14 |
Time |
16:26 |
Sent To |
|
|
| Notes |
| 2009-09-14 16:41:27 | RE-ROOF BUILDING REVIEW CHECKLIST. | | | 2007 FBC WITH 2009 REVISIONS. | | | | | | 1- PROVIDE RAS 117 SIGNED AND SEALED CALCULATIONS FOR | | | NAIL ENHANCING AT PERIMETER AND CORNER AREAS AS | | | REQUIRED BY GENERAL LIMITATION #7 ON LAST PAGE OF NOA | | | 09-0224.01 SUBMITTED. | | | | | | 2- DESIGN PROFESSIONAL DOING THE RAS 117 CALCULATIONS | | | NEED TO TAKE INTO CONSIDERATION THAT THIS BUILDING IS | | | LOCATED ON EXPOSURE "C" AS REQUIRED BY 2009 REVISIONS | | | TO FBC 2007 SEC. 1609.4.3. | | | | | | 3- CLEARLY MARK ON NOA SUBMITTED SPECIFIC BASE SHEET | | | FASTENING OPTION TO BE USED TO VERIFY COMPLIANCE WITH | | | THE UPLIFT LOADS OF SEC. 1609 OF FBC 2007 WITH 2009 | | | REVISIONS. | | | | | | JULIO GOMEZ | | | BUILDING PLANS EXAMINER | | | (561)805-6712 |
|
|
|