| Plan Review Stops For Permit 09090155 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2009-10-01 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2009-10-01 |
Time |
15:01 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2009-10-01 |
Time |
15:01 |
Sent To |
|
|
| Notes |
| 2009-10-01 15:05:38 | REVISION TO CHANGE ROOFING MATERIAL IS OK. DUE TO OLD | | | ROOFING BEING MOPPED DIRECTLY TO TECTUM DECK, PLYWOOD | | | WILL BE INSTALLED TO PROVIDE A GOOD BASE FOR ROOFING. | | | ENGINEERING WAS SUBMITED. SYSTEM WAS APPROVED BY THE | | | BUILDING OFFICIAL. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2009-09-14 |
|
|
Cont ID |
|
| Sent By |
kconrad |
Date |
2009-09-14 |
Time |
09:05 |
Rev Time |
0.00 |
| Received By |
kconrad |
Date |
2009-09-14 |
Time |
09:05 |
Sent To |
|
|
| Notes |
| 2009-09-14 09:15:28 | MET WITH THE ROOFING CONTRACTOR TO PERFORM A | | | PRELIMINARY INSPECTION OF THE EXISTING ROOF. THE TECTUM | | | SUBSTRATE APPEARS TO BE DETERIORATED AT NUMEROUS | | | LOCATIONS. I ADVISED THE ROOFING CONTRACTOR THAT A GC | | | WILL BE REQUIRED TO OBTAIN A DECK REPAIR PERMIT PRIOR | | | TO COMMENCING ANY RE-ROOFING. NEED TO COMPLETE PLAN | | | REVIEW. |
|
|
|