|
 |
 |
 |
 |
 |
Plan Review Details - Permit 09080587
| Plan Review Stops For Permit 09080587 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2009-11-23 |
|
|
Cont ID |
|
| Sent By |
lmartine |
Date |
2009-11-23 |
Time |
16:54 |
Rev Time |
0.00 |
| Received By |
lmartine |
Date |
2009-11-23 |
Time |
16:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2009-09-02 |
|
|
Cont ID |
|
| Sent By |
kconrad |
Date |
2009-09-02 |
Time |
10:10 |
Rev Time |
0.00 |
| Received By |
kconrad |
Date |
2009-09-02 |
Time |
10:10 |
Sent To |
|
|
| Notes |
| 2009-09-02 10:11:47 | PREINSPECT PERFORMED BY CJ. THE PROJECT VALUATION | | | APPEARS TO BE LOW AND SHOULD BE A MINUMUM OF $7,500. | | | WILL REQUIRE A NOC. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2009-10-21 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2009-10-21 |
Time |
15:37 |
Rev Time |
0.00 |
| Received By |
btrobaug |
Date |
2009-10-21 |
Time |
15:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2009-12-10 |
|
|
Cont ID |
|
| Sent By |
lmartine |
Date |
2009-12-09 |
Time |
09:26 |
Rev Time |
0.00 |
| Received By |
lmartine |
Date |
2009-12-09 |
Time |
09:26 |
Sent To |
|
|
| Notes |
| 2009-12-10 09:30:09 | GAVE TO RON |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2009-12-10 |
|
|
Cont ID |
|
| Sent By |
lmartine |
Date |
2009-11-23 |
Time |
09:26 |
Rev Time |
0.00 |
| Received By |
lmartine |
Date |
2009-10-21 |
Time |
15:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2010-01-21 |
|
|
Cont ID |
|
| Sent By |
rregueir |
Date |
2010-01-21 |
Time |
09:58 |
Rev Time |
0.00 |
| Received By |
rregueir |
Date |
2010-01-21 |
Time |
09:58 |
Sent To |
|
|
| Notes |
| 2010-01-21 09:59:02 | MISSING CFM AND DUCT SIZES WERE ADDED BY HAND TO PLAN | | | PER PHONE CONVERSATION WITH CONTRACTOR. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2009-11-23 |
|
|
Cont ID |
|
| Sent By |
rregueir |
Date |
2009-11-23 |
Time |
11:15 |
Rev Time |
0.00 |
| Received By |
rregueir |
Date |
2009-11-23 |
Time |
11:15 |
Sent To |
|
|
| Notes |
| 2009-11-23 11:29:28 | REVIEW #: 1ST | | | ACTION: DENIED | | | | | | FBC 2007 CODE FAMILY W/ 2009 SUPPLEMENTS | | | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH | | | | | | 1. PROVIDE EQUIPMENT SCHEDULE PER FBC-B 106.3.5. | | | | | | 2. PROVIDE DUCT SIZES AND CFM QUANTITIES ON PLANS. THE | | | AIR DISTRIBUTION SYSTEM SHALL BE SIZED AND DESIGNED IN | | | ACCORDANCE WITH RECOGNIZED ENGINEERING STANDARDS SUCH | | | AS ACCA MANUAL D OR OTHER STANDARDS, IN ACCORDANCE WITH | | | FBC-B 610.AB.1, BASED ON THE FOLLOWING: | | | | | | A. CALCULATION OF THE SUPPLY AIR FOR EACH ROOM SHALL BE | | | BASED ON THE GREATER OF THE HEATING LOAD OR SENSIBLE | | | COOLING LOAD FOR THAT ROOM. | | | | | | B. DUCT SIZE SHALL BE DETERMINED BY THE SUPPLY AIR | | | REQUIREMENTS OF EACH ROOM, THE AVAILABLE STATIC | | | PRESSURE AND THE TOTAL EQUIVALENT LENGTH OF THE VARIOUS | | | DUCT RUNS. | | | | | | C. FRICTION LOSS DATA SHALL CORRESPOND TO THE TYPE OF | | | MATERIAL USED IN DUCT CONSTRUCTION. | | | | | | | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
N |
Date |
2009-11-03 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
2009-11-03 |
Time |
18:35 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
2009-11-03 |
Time |
18:35 |
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |