| 2009-09-18 12:17:36 | |
| | |
| | ** FAILED REVIEW ** |
| | |
| | 1) NOTE: PERMIT HAS NOT BEEN APPLIED FOR UNDER A |
| | LICENSED CONTRACTOR. |
| | |
| | 2) NOTE: THE SUBMITTED RISER AS SHOWN ON E5.1 CONTAINS |
| | A SUBSTANTIAL AMOUNT OF CODE VIOLATIONS. THE RISER |
| | SHOWN FOR FEEDS TO FIRE PUMP AND SEVERAL OTHER ASPECTS |
| | OF SERVICE AS SHOWN IN VIOLATION OF TOO MANY CODES TO |
| | NOTE. THE APPLIED SCOPE OF WORK IS FOR THE SECOND FLOOR |
| | TENANT. PLEASE ONLY INCLUDE ELECTRICAL FOR THIS |
| | RELEVANT SPACE AND EQUIPMENT ONLY. |
| | ** IT SHOULD BE NOTED IF THE ELECTRICAL AS SHOWN ON |
| | RISER IS THE ACTUAL INSTALLATION THERE SHOULD BE |
| | CONCERNS OVER THE INSTALLATION AS SHOWN. |
| | THERE ARE SEVERAL ITEMS SHOWN ON RISER WHICH ARE LIFE |
| | SAFETY AND FIRE HAZARDS CONCERNS. IF RISER IS ACCURATE |
| | THEN THESE ITEMS SHOULD BE ADDRESSED BY THE APPROPRIATE |
| | PARTIES RESPONSIBLE FOR THE BUILDING. |
| | PLEASE SEE NFPA-110, NFPA-20 AND NFPA-70 FOR LIFE |
| | SAFETY, LEGALLY REQUIRED SYSTEMS ALONG WITH FIRE PUMP |
| | INSTALLATION MINIMUMS. |
| | |
| | ** THIS WAS NOTED ON A PREVIOUS PLAN REVIEW SEVERAL |
| | YEARS AGO. |
| | |
| | 2) NOTE: THE LOAD SHOWN ON PANEL 2MA APPEARS TO INCLUDE |
| | ONLY LOADS FOR PANELS 2LA, 2A AND 2B. WHERE IS THE LOAD |
| | FOR 1LA? |
| | ALL OF THESE PANELS ARE SHOWN FROM THE SAME 75KVA |
| | TRANSFORMER. THE TOTAL LOADS AS SHOWN ARE EXCEEDING THE |
| | RATING OF THE 75 KVA TRANSFORMER. |
| | PLEASE SEE 450 FOR MAXIMUM ALLOWABLE LOADS. PLEASE SEE |
| | NEC 220.12,220.14,220.42,220.44 ETC ALONG WITH |
| | 215.3,230.42. |
| | LOAD CALCULATIONS SHOULD BE DONE TO ACCURATELY DEPICT |
| | ACTUAL LOAD ON SERVICE EQUIPMENT, TRANSFORMER. |
| | THE CONDUCTORS ON THE SECONDARY SIDE OF THE TRANSFORMER |
| | ARE NOTED AS ONE RUN OF 250MCM. ALL PANELS AS SHOWN ARE |
| | 100AMP MCB. |
| | THIS IS NOT POSSIBLE AS SHOWN/NOTED. |
| | PLEASE PROVIDE CONDUCTORS ON THE SECONDARY SIDE. |
| | 240.4,240.21C, 310.16, 110.3, 110.14 ETC. |
| | |
| | 3) NOTE: PANELS 2A AND 2B ARE SHOWN BEING FED FROM 2LA, |
| | HOWEVER NO BREAKERS ARE INDICATED IN PANEL SCHEDULE. IS |
| | PANEL 2LA A FEED-THRU LUG PANEL WITH DOUBLE TAPPED |
| | LUGS? |
| | |
| | |
| | |
| | IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT |
| | TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO |
| | CONTACT THIS REVIEWER. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW II |
| | CONSTRUCTION SERVICES DEPARTMENT |
| | CITY OF WEST PALM BEACH |
| | 561-805-6717 |
| | [email protected] |
| | |