| 2009-05-29 14:23:39 | REVIEW #: 1ST |
| | ACTION: DENIED |
| | |
| | FBC 2007 CODE FAMILY W/ 2009 SUPPLEMENTS |
| | FBC CH.1 AS AMENDED BY THE CITY OF WEST PALM BEACH |
| | |
| | 1. GREASE EXHAUST DUCTS SHALL BE FLANGED, GASKETED AND |
| | BOLTED TO THE INLET AND OUTLET OF THE FAN FOR IN-LINE |
| | FANS IN ACCORDANCE WITH FBC-M 506.3.2.3. |
| | |
| | 2. DUCTS EXPOSED TO THE OUTSIDE ATMOSPHERE OR SUBJECT |
| | TO A CORROSIVE ENVIRONMENT SHALL BE PROTECTED AGAINST |
| | CORROSION IN AN APPROVED MANNER IN ACCORDANCE WITH |
| | FBC-M 506.2. |
| | |
| | 3. A GREASE DUCT TEST IS REQUIRED FOR ALL JOINTS AND |
| | SEAMS IN THE PRESENCE OF THE CODE OFFICIAL IN |
| | ACCORDANCE WITH FBC-M 506.3.2.5. THE PROPOSED LOCATION |
| | OF THE DUCT WILL REQUIRE INSPECTION OF THE EXTERIOR |
| | DUCT PRIOR TO INSTALLATION. COORDINATE WITH FIELD |
| | INSPECTOR. |
| | |
| | 4. PROVIDE STRUCTURAL CALCULATIONS FOR BUILDING PLAN |
| | REVIEW SHOWING THE EXISTING FLOOR/CEILING ASSEMBLY IS |
| | CAPABLE OF SUPPORTING ADDITIONAL LOADS ASSOCIATED WITH |
| | THE PROPOSED HOOD, DUCTWORK, WRAP AND PERSONNEL WORKING |
| | ON THE HOOD IN ACCORDANCE WITH FBC-M 506.3.3 AND 507.6. |
| | |
| | 5. PROVIDE MANUFACTURERS OR OTHER SUPPORTING DATA |
| | SHOWING SUPPLY AND EXHAUST FANS ARE DESIGNED FOR WIND |
| | RESISTANCE IN ACCORDANCE WITH FBC-M 301.12. SEPARATE |
| | BUILDING PLAN REVIEW ALSO REQUIRED FOR THE WIND |
| | RESISTANCE CAPABILITIES OF FAN AND DUCT SUPPORTS. |
| | |
| | 6. SUPPLY FAN APPEARS TO BE FACING THE REAR PARKING LOT |
| | OF THE BUILDING. MAKEUP AIR INTAKE OPENING LOCATIONS |
| | SHALL COMPLY WITH FBC-M SECTIONS 401.4 AND 401.4.1 |
| | |
| | NOTE: SEPARATE PERMIT FOR FIRE SUPPRESSION SYSTEM |
| | REQUIRED PER FBC-M 509.1. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT: |
| | RONALD J. REGUEIRO |
| | 561.805.6719 |
| | [email protected] |