| Plan Review Stops For Permit 09040088 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2009-05-15 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2009-05-15 |
Time |
10:45 |
Rev Time |
0.77 |
| Received By |
jwitmer |
Date |
2009-05-15 |
Time |
10:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2009-04-14 |
|
|
Cont ID |
|
| Sent By |
mjacobs |
Date |
2009-04-14 |
Time |
10:36 |
Rev Time |
0.00 |
| Received By |
mjacobs |
Date |
2009-04-14 |
Time |
10:24 |
Sent To |
|
|
| Notes |
| 2009-04-14 10:36:05 | 4/14/09 DENIED: | | | | | | FS 481.221 ALL FINAL CONSTRUCTION DOCUMENTS AND | | | INSTRUMENTS OF SERVICE WHICH INCLUDE DRAWINGS, PLANS, | | | SPECIFICATIONS, OR REPORTS PREPARED OR ISSUED BY THE | | | REGISTERED ARCHITECT AND BEING FILED FOR PUBLIC RECORD | | | SHALL BEAR THE SIGNATURE AND SEAL OF THE REGISTERED | | | ARCHITECT WHO PREPARED OR APPROVED THE DOCUMENT AND THE | | | DATE ON WHICH THEY WERE SEALED. THE PLANS ARE MISSING | | | THE SEAL. | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2009-05-11 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2009-05-11 |
Time |
08:12 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2009-05-08 |
Time |
17:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2009-04-13 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2009-04-13 |
Time |
13:58 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2009-04-13 |
Time |
13:58 |
Sent To |
|
|
| Notes |
| 2009-04-13 13:58:14 | ** DENIED** | | | | | | 1) NOTE: PLEASE BE SURE TO SUBMIT TWO COMPLETE SETS OF | | | PLANS BOUND TOGETHER. | | | PLEASE BE SURE ALL OF THE FOLLOWING MINIMUM CODES ARE | | | STATED ON PLANS. | | | 2007 FBC W/ 2009 REVISIONS. | | | 2006 NFPA-101 | | | 2005 NFPA-70 | | | 2002 NFPA-72 | | | | | | 2) NOTE: PLANS NEED TO BE SEALED AS THEY ARE SIGNED AND | | | DATED BUT NOT SEALED PER FS 481.221 | | | | | | IF THERE ARE ANY QUESTIONS; OR IF COMMENTS ARE NOT | | | TYPED IN A CLEAR MANNER PLEASE DO NOT HESITATE TO | | | CONTACT THIS REVIEWER. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW II | | | CONSTRUCTION SERVICES DEPARTMENT | | | CITY OF WEST PALM BEACH | | | 561-805-6717 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2009-05-06 |
|
|
Cont ID |
|
| Sent By |
mawillia |
Date |
2009-05-06 |
Time |
13:33 |
Rev Time |
0.00 |
| Received By |
mawillia |
Date |
2009-05-06 |
Time |
13:23 |
Sent To |
|
|
| Notes |
| 2009-05-06 13:33:00 | *****APPROVED***** | | | | | | | | | THE COMMENTS FROM THE PREVIOUS FIRE PLAN REVIEW HAVE | | | BEEN ADDRESSED; PLAN SHEET A2 WAS STAMPED, INITIALED | | | AND DATED. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2009-04-15 |
|
|
Cont ID |
|
| Sent By |
mwennerg |
Date |
2009-04-15 |
Time |
10:54 |
Rev Time |
0.00 |
| Received By |
mwennerg |
Date |
2009-04-15 |
Time |
10:53 |
Sent To |
|
|
| Notes |
| 2009-04-15 10:57:37 | ***DENIED*** | | | | | | 1) THE PLANS ARE MISSING THE REQUIRED SEAL FROM THE | | | PROJECT DESIGNER. | | | | | | 2) IN ADDITION TO THE LISTED GOVERNING CODES, LIFE | | | SAFETY SHALL COMPLY WITH NFPA 101, 2006. | | | | | | | | | MIKE WENNERGREN, ASST. FIRE MARSHAL | | | FIRE PLAN REVIEW | | | FIRE PREVENTION (561) 804-4756 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2009-04-30 |
|
|
Cont ID |
|
| Sent By |
rregueir |
Date |
2009-04-30 |
Time |
16:34 |
Rev Time |
0.00 |
| Received By |
rregueir |
Date |
2009-04-30 |
Time |
16:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2009-04-22 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2009-04-22 |
Time |
08:19 |
Rev Time |
0.00 |
| Received By |
kstevens |
Date |
2009-04-07 |
Time |
10:12 |
Sent To |
|
|
| Notes |
| 2009-04-07 10:12:16 | TO "B19" BOX |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2009-04-22 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2009-04-22 |
Time |
08:18 |
Rev Time |
0.00 |
| Received By |
kstevens |
Date |
2009-04-22 |
Time |
08:18 |
Sent To |
|
|
| Notes |
| 2009-04-22 08:18:38 | NO PLUMBING WORK INDICATED ON DEMO PLANS. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
N |
Date |
2009-04-16 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2009-04-16 |
Time |
15:56 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2009-04-16 |
Time |
15:56 |
Sent To |
|
|
| Notes |
| 2009-04-16 16:17:30 | BUILDING VALUE = $4.5 MILLION. |
|
|