| 2009-04-13 13:55:14 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL, BUILDING PLANS EXAMINER |
| | 561-805-6724 [email protected] |
| | |
| | FBC FLORIDA BUILDING CODE 2007 |
| | FBC EB FLORIDA BUILDING CODE 2007 EXISTING BUILDING |
| | CODE |
| | FBC R FLORIDA BUILDING CODE 2007 RESIDENTIAL |
| | FBC* CITY OF WEST PALM BEACH AMENDMENTS TO THE FBC2007 |
| | FAC FLORIDA ADMINISTRATIVE CODE |
| | FS FLORIDA STATUTE |
| | |
| | FROM PREVIOUS LIST: |
| | |
| | 1. FLORIDA STATE OR LOCAL PRODUCT APPROVAL REQUIRED FOR |
| | THE DOOR, FAC9B72. |
| | |
| | PLEASE NOTE THAT IF THIS COMMENT IS NOT ADDRESSED PRIOR |
| | TO PERMIT ISSUANCE, PERMIT WILL BE ISSUED WITH PROVISO. |
| | |
| | 2. ADDRESSED. |
| | |
| | 3. 1ST REVIEW - SHEATHING DOES NOT COMPLY WITH FBC R |
| | TABLE 803.1, PAGE 3. |
| | |
| | 2ND REVIEW - PLEASE CLARIFY; SHEATHING SPECIFIED AS |
| | 7/16" OSB, BUT FBC R TABLE 803.1 REQUIRES MINIMUM |
| | THICKNESS FOR 24" SPAN TO BE 5/8". |
| | |
| | 4. 1ST REVIEW - ROOF NAIL SIZE DOES NOT COMPLY WITH FBC |
| | R 803.2.3.1, PAGE 3. |
| | |
| | 2ND REVIEW - PLEASE CLARIFY; 6D NAILS SPECIFIED, BUT |
| | FBC R803.2.3.1 REQUIRES MINIMUM 8D. |
| | |
| | ****PLEASE CONTACT ME IF YOU DISAGREE WITH THESE |
| | COMMENTS; A RESPONSE LETTER WAS NOT SUBMITTED SO IT IS |
| | NOT CLEAR WHY ITEMS WERE NOT REVISED*** |
| | ****OFFERED TO CONTRACTOR TO ISSUE PERMIT WITH PROVISO, |
| | WILL REDLINE/ENGINEER TO SUBMIT REVISED DRAWING WITH |
| | CHANGES*** |
| | |
| | NEW COMMENTS: |
| | |
| | 5. TRUSS ENGINEERING INCLUDES A COMPANY NAME. |
| | CERTIFICATE OF AUTHORIZATION REQUIRED TO PRACTICE |
| | ENGINEERING THROUGH A COMPANY, FS471. |
| | |
| | 6. TRUSS ENGINEERING INDEX SHEET IS TO INCLUDE ALL |
| | INFORMATION REQUIRED BY FAC61G15-31.003. THIS CAN BE |
| | VIEWED AT WWW.FBPE.ORG, LAWS AND RULES. |
| | |
| | 7. PLEASE ADVISE AS TO STANDARDS THAT WERE USED FOR |
| | THIS CALCULATION. THE SOFTWARE USED IS OUTDATED; THIS |
| | IS ACCEPTABLE (IF CODE COMPLIANT) BUT PLEASE NOTE THAT |
| | SOME TRUSS ENGINEERING SOFTWARE UTILIZED A STRESS |
| | INCREASE UNTIL APPROXIMATELY 2004. |
| | |
| | ****NOTE THAT ALL COMMENTS REGARDING TRUSS ENGINEERING |
| | CAN BE A PROVISO ITEM - TRUSS ENGINEERING TO BE |
| | SUBMITTED AS A REVISION PRIOR TO INSTALLATION**** |
| | |
| | 8. PLEASE SEE FS553.80(2)(B), A 4X PLAN REVIEW IS |
| | REQUIRED AFTER THIRD REVIEW. |
| | |
| | |