| 2009-02-19 09:41:49 | OAKTON RESERVE PROJECT |
| | ENGINEERING SERVICES DIVISION |
| | FEBRUARY 19, 2009 |
| | |
| | PLAN REVIEW STATUS: FAILED |
| | |
| | REVISED COST ESTIMATE IS UNACCEPTABLE AS SUBMITTED: |
| | |
| | 1. NOT IN COMPLIANCE WITH THE PLAN REVIEW GUIDELINES |
| | AS OUTLINED ON PAGE ES-1 OF THE ENGINEERING SERVICES |
| | FEE DIRECTORY: MATERIAL QUANTITIES OF WATER AND |
| | SANITARY |
| | INFRASTRUCTURE LISTED ARE INCONSISTENT WITH LINEAR FEET |
| | QUANTITIES SHOWN ON PLANS AND DO NOT CORRESPOND TO |
| | NEITHER THE "ULTIMATE BUILD-OUT" TOTALS NOR THE |
| | "PHASE 1" TOTALS. |
| | |
| | 2. EROSION CONTROL BOND REMAINS UNRESOLVED AND HAS |
| | NOT BEEN SUBMITTED |
| | |
| | 3. PLAN REVIEW FEE IS ALSO UNRESOLVED AND HAS NOT |
| | BEEN SUBMITTED |
| | |
| | REVISED WATER/SEWER AND PAVING & DRAINAGE UTILITIES |
| | PLANS ARE INCONSISTENT: |
| | |
| | 1. LINEAR FEET OF STORM WATER PIPE MATERIALS ARE |
| | INCOMPLETE |
| | |
| | 2. REFERENCED NOTE 4 OF PAVING & DRAINAGE PLANS |
| | ARE ILLEGIBLE |
| | |
| | 3. SYMBOLS LEGEND ON PAVING & DRAINAGE PLANS |
| | ARE INCOMPLETE |
| | |
| | 4. STORM DRAINAGE STRUCTURE TAGS ON SHEET 6 DO |
| | NOT MATCH THOSE ON MASTER SHEET #2 |
| | |
| | 5. LINEAR FEET OF WATER & SEWER PIPE |
| | QUANTITIES/TOTALS ARE INCORRECT |
| | |
| | 6. SHEETS 5 & 6 SHOWS (2) 24" RCP LINES WITH |
| | NO CONNECTION BETWEEN S-46A & S-46B |
| | |
| | 7. STORM WATER CATCH BASIN S-49 IS SHOWN |
| | IN THE LAKE |
| | |
| | 8. CHECK FLOW DIRECTION ARROWS; SOME SHOW |
| | DIRECTION OF RUN-OFF DEFYING GRAVITY |
| | |
| | 9. STORM WATER SECTION DETAILS REFERENCED |
| | ON SHEET 8; A-A AND B-B ON ARE NOT SHOWN |
| | ON PLAN SHEETS |
| | |
| | 10. PLAN DRAWING GRAPHIC SCALE SHOWN IS |
| | INCORRECT |
| | |
| | 11. PLAN DATES SHOWN ARE INCONSISTENT |
| | AND DO NOT MATCH |
| | |
| | 12. PLANS ARE NOT SIGNED AND SEALED BY |
| | THE ENGINEER OF RECORD |
| | |
| | 13. PAGES 2 & 7 ON THE DEP FORMS |
| | SUBMITTED ON 08-29-08 HAVE NOT YET |
| | BEEN CORRECTED |
| | |
| | PLEASE CONTACT THE REVIEWER WITH |
| | ANY QUESTIONS OR COMMENTS: |
| | |
| | EMERY P. FABIAN |
| | ENGINEERING SERVICES DIVISION |
| | PROJECT COORDINATOR |
| | 561-494-1078 OFFICE |
| | 561-662-2269 CELL |
| | [email protected] |
| | |