| 2009-01-14 08:09:30 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL, BUILDING PLANS EXAMINER |
| | 561-805-6724 [email protected] |
| | |
| | FBC FLORIDA BUILDING CODE 2004 |
| | FBC EB FLORIDA BUILDING CODE 2004 EXISTING BUILDING |
| | CODE |
| | FBC R FLORIDA BUILDING CODE 2004 RESIDENTIAL |
| | FBC* CITY OF WEST PALM BEACH AMENDMENTS TO THE FBC2004 |
| | FAC FLORIDA ADMINISTRATIVE CODE |
| | FS FLORIDA STATUTE |
| | |
| | 1. SEE TYPICAL SHORING PLAN PREPARED BY CBI CONSULTING |
| | INC. DOCUMENTS SUBMITTED FOR PUBLIC RECORD ARE TO BE IN |
| | ACCORDANCE WITH FAC61G15-23.002, TITLE BLOCK. PLEASE |
| | REVISE. |
| | |
| | 2. SHORING DETAILS ARE DESIGNED TO FBC2007. THIS IS NOT |
| | GOVERNING CODE. PLEASE REVISE. |
| | |
| | 3. SHORING DETAILS ARE DESIGNED TO ACI318-05, STANDARD |
| | IN EFFECT IS 02 VERSION. PLEASE REVISE TO INCLUDE 02, |
| | SEE FBC CHAPTER 35. PLEASE CHECK ALL STANDARDS. |
| | |
| | 4. IT IS NOT CLEAR WHY FIVE SETS OF SHORING DRAWINGS |
| | WERE SUBMITTED BUT SIX SETS OF SPECS WERE SUBMITTED. |
| | PLEASE REMOVE UNNECESSARY SETS. TWO SETS ARE REQUIRED. |
| | IF THE CONTRACTOR REQUIRES ADDITIONAL STAMPED SETS, |
| | PLEASE SUBMIT COMPLETE SETS OR SUBMIT A REQUEST FOR |
| | PARTIAL STAMPED SETS. OTHERWISE, ONLY TWO COMPLETE SETS |
| | WILL BE RETURNED STAMPED TO THE CONTRACTOR. |
| | |
| | 5. ENGINEER'S REPORTS WILL BE REQUIRED. PLEASE SUBMIT |
| | EITHER TO THE CITY INSPECTOR OR THROUGH PLAN REVIEW. |
| | (INFORMATIONAL ONLY.) |
| | |
| | 6. THE ENGINEER'S REPAIR MANUAL IS NOT A PART OF THE |
| | PERMIT PACKAGE. PLEASE SUBMIT, IF AVAILABLE. |
| | |
| | 7. SEE SHEET S5. FOR COLUMN/TEE REPAIRS, NOTE 1 STATES |
| | THAT PRIOR TO REPAIRS, TEE BEAM SHALL BE FULLY SHORED |
| | TO GROUND LEVEL. IT APPEARS THAT REPAIR WORK HAS |
| | COMMENCED, BUT NO SHORING HAS BEEN PROVIDED. SEE ALSO |
| | S5, SHORING BRACING AND SUPPORT, STAES THAT SHORING, |
| | BRACING OR SUPPORT SHALL BE PROVIDED. |
| | |
| | 8. SEE NOTE SHORING BRACING AND SUPPORT, SHEET S5, ITEM |
| | 3. PLEASE PROVIDE A SHORING PLAN AS REQUIRED. SHORING |
| | DETAILS WERE PROVIDED BUT NO INFORMATION REGARDING |
| | LOCATIONS REQUIRED. ACCORDING TO THE PLAN, IT APPEARS |
| | THAT SHORING IS REQUIRED IN ALL LOCATIONS OF REPAIR |
| | UNLESS THE REPAIR IS A COLUMN SPALL, SEE SHEET S5. |
| | OTHER SPALLS REQUIRE SHORING, ACCORDING TO THE PLAN. IS |
| | THIS FURTHER CLARIFIED IN THE REPAIR MANUAL WHICH WAS |
| | NOT SUBMITTED? |
| | |
| | 9. I HAVE BEEN ADVISED BY THE CITY INSPECTOR THAT |
| | MASTERBUILDER PRODUCTS ARE ON THE JOBSITE, BUT THE |
| | SPECIFICATIONS PROVIDED ARE FOR SIKA. THIS COMMENT IS |
| | ADVISORY ONLY; PLEASE BE AWARE THAT NO SUBSTITUTIONS |
| | ARE PERMITTED UNLESS APPROVED BY THE ENGINEER OF RECORD |
| | PRIOR TO INSTALLATION/APPLICATION. |
| | |
| | |