Plan Review Details - Permit 08100388
Plan Review Stops For Permit 08100388
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2008-10-27 Cont ID  
Sent By mperson Date 2008-10-28 Time 16:56 Rev Time 1.00
Received By mperson Date 2008-10-27 Time 16:56 Sent To PC
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2008-10-20 Cont ID  
Sent By mperson Date 2008-10-20 Time 08:44 Rev Time 1.30
Received By mperson Date 2008-10-20 Time 08:44 Sent To I
Notes
2008-10-20 10:01:50GAS PLAN REVIEW:
 DENIED:
  
 PLAN REVIEW UNDER THE 2004 FLORIDA BUILDING CODES WITH
 2007 REVISIONS, CITY OF WEST PALM BEACH AMENDMENTS TO
 CHAPTER 1 (W.P.B.), FLORIDA ADMINISTRATIVE CODE
 (F.A.C.), AND FLORIDA STATUTES (F.S.).
  
 THE FOLLOWING CORRECTIONS/INFORMATION ARE REQUIRED FOR
 GAS PLAN REVIEW TO MEET CODE COMPLIANCE AND THE CITY OF
 WEST PALM BEACH GAS PERMIT APPLICATION REQUIREMENTS.
  
  
 1. THE VALUE ON THE PERMIT APPLICATION APPEARS LOW. THE
 VALUE ON THE PERMIT APPLICATION MUST INCLUDE THE TOTAL
 COST OF LABOR, MATERIALS AND DESIGN WHICH ALSO INCLUDES
 THE PRICE OF THE FIRE PIT. PLANS ARE INDICATING
 "APPLIANCE BY OTHERS", HOWEVER THERE IS NO INDICATION
 OF WHO OTHERS IS OR IF THE FIRE PIT HAS BEEN APPROVED
 ON ANOTHER PERMIT. PLEASE PROVIDE THIS REQUIRED
 INFORMATION OR INCREASE THE VALUE OF THE PERMIT. IF IT
 IS THE INTENT OF THIS PERMIT TO MAKE THE FINAL
 CONNECTIONS TO THE FIRE PIT THEN THE FIRE PITS COST
 SHALL BE INCLUDED.
 PER (W.P.B AS AMENDED) SECTION 108.3 BUILDING PERMIT
 VALUATION. IF, IN THE OPINION OF THE BUILDING OFFICIAL,
 THE CLAIMED VALUATION OF BUILDING, ALTERATION,
 STRUCTURAL, ELECTRICAL, GAS, MECHANICAL OR PLUMBING
 SYSTEMS APPEARS TO BE UNDERESTIMATED ON THE
 APPLICATION, THE PERMIT SHALL BE DENIED.
  
 2. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE 401.1 SCOPE.
 *NOTE: NOT ALL CUT SECTIONS OF PIPE HAVE CORRESPONDING
 LENGTHS. THE ONLY CORRESPONDING LENGTH BEING INDICATED
 ON THE ISOMETRIC IS 35' OF 3/4" PE FOR THE UNDERGROUND
 PIPING. IS THIS CORRESPONDING LENGTH FROM THE FIRST
 STAGE REGULATOR TO THE SECOND STAGE REGULATOR? WHAT ARE
 THE ABOVE GROUND CORRESPONDING LENGTHS TO THE CUT
 SECTIONS OF PIPE? PLEASE PROVIDE CORRESPONDING LENGTHS
 TO ALL CUT SECTIONS OF PIPE AND CLEARLY INDICATE THE
 LOCATION OF THE 1ST STAGE REGULATOR ON THE RESUBMITTAL.
  
 3. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 PER FBC-2004 FUEL GAS SECTION 401.1 SCOPE.
 *NOTE: THE ONLY PIPING MATERIAL BEING INDICATED ON THE
 ISOMETRIS IS THE UNDERGROUND PE PIPING. WHAT IS THE
 ABOVE GROUND PIPING MATERIAL? CLEARLY INDICATE THIS ON
 THE RESUBMITTAL.
  
 4. THE SUBMITTED GAS ISOMETRIC IS INDICATING THE 2ND
 STAGE REGULATOR AS BEING INSTALLED UNDERGROUND. PLEASE
 CLARIFY HOW ACCESS SHALL BE PROVIDED FOR THE REGULATOR
 AND HOW THE REGULATOR WILL BE PROTECTED FROM PHYSICAL
 DAMAGE IF ITS LOCATED UNDERGROUND. PER FC-2004 FUEL GAS
 SECTION 410.1 PRESSURE REGULATOR. HOW WILL THE
 REGULATOR VENT IF IT IS LOCATED UNDERGROUND? PRESSURE
 REGULATORS THAT REQUIRE A VENT SHALL HAVE AN
 INDIPENDENT VENT TO THE OUTSIDE OF THE BUILDING. THE
 VENT SHALL BE DESIGNED TO PREVENT THE ENTRY OF WATER OR
 FOREIGN OBJECTS. PER FBC-2004 FUEL GAS SECTION 410.3
 VENTING OF REGULATORS. PLEASE CLARIFY THESE ISSUES ON
 THE RESUBMITTAL.
  
 5. THE SUBMITTED MANUACTURER SHEET FOR THE FIRST AND
 SECOND STAGE REGULATORS DO NOT INDICATED A LISTING FROM
 A NATIONALLY RECOGNIZED TESTING LABORATORY SUCH AS CSA,
 AGA OR UL. PLEASE PROVIDE THIS REQUIRED INFORMATION ON
 THE RESUBMITTAL. PER FBC-2004 FUEL GAS SECTION 301.3
 LISTED AND LABELED, STANDARDS NFPA 58.
  
 6. NOTE: ALL PLANS, SPECIFICATIONS, AND ACCOMPANYING
 DATA BEING FILED FOR PUBLIC RECORD SHALL CONTAIN THE
 PRINTED NAME OF THE RESPONSIBLE PERSON WITH THE
 ORIGINAL SIGNATURE AND DATE ON SUCH INFORMATION. PER
 FBC-2004 CHAPTER 1, (W.P.B. AS AMENDED) SECTION
 *106.3.4.3.
  
 ********IMPORTANT INFORMATION********
 WHEN RESUBMITTING PLANS, PLEASE PROVIDE A COPY OF THE
 OLD PLANS, CLEARLY INDICATE THE REVISION ON THE NEW
 PLANS, REMOVE AND REPLACE ANY PAGES AS NECESSARY. A
 TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW COMMENT
 NUMBER, WITH A DESCRIPTION OF THE REVISION MADE,
 IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR PERMIT.
 THANK YOU FOR YOUR ANTICIPATED COOPERATION.
  
 END OF COMMENTS:
  
 REVIEW BY: MIKE PERSON
 PLUMBING PLANS EXAMINER
 PHONE= (561) 805-6730
 FAX= (561) 805-6731
 E-MAIL= [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2008-10-23 Cont ID  
Sent By adarroug Date 2008-10-23 Time 11:25 Rev Time 0.00
Received By adarroug Date 2008-10-23 Time 11:25 Sent To G
Notes
2008-10-23 11:26:08TO "G" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2008-10-20 Cont ID  
Sent By mperson Date 2008-10-20 Time 10:02 Rev Time 0.00
Received By mperson Date 2008-10-17 Time 16:25 Sent To PC
Notes
2008-10-17 16:27:07TO $5000,00 OR LESS "P" BOX. *MRPERSON.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved