| 2008-10-15 11:20:17 | RESIDENTIAL SHUTTERS BUILDING REVIEW CHECKLIST. |
| | REVIEW UNDER FBC 2004 WITH 2007 REVISIONS. |
| | |
| | 1- PROVIDE COMPLETE INSTALLATION SCHEDULE AS REQUIRED |
| | BY CITY IMPLEMENTATION STANDARD FOR WIND-BORNE DEBRIS |
| | IMPACT PROTECTION. SEE ATTACHED COPY. |
| | |
| | 2- PROVIDE COMPLETE FLORIDA PRODUCT APPROVAL AS |
| | REQUIRED BY DCA RULE 9B-72 FOR THE ACCORDION SHUTTERS. |
| | PROVIDE COVER PAGES AND DRAWINGS THAT WERE SUBMITTED |
| | FOR APPROVAL. DRAWINGS 08-225 SUBMITTED ARE NOT A 2004 |
| | CODE VERSION APPROVED PRODUCT APPROVAL AND ARE MISSING |
| | THE COVER PAGES. |
| | PLEASE MAKE SURE PRODUCT APPROVAL SUBMITTED IS FOR 2004 |
| | CODE VERSION, WHICH IS THE CURRENT CODE IN EFFECT. |
| | |
| | 3- ON ACCORDION DRAWINGS CLEARLY MARK SPECIFIC MOUNTING |
| | CONDITIONS ( EG: WALL MOUNT SECTION, CEILING MOUNT |
| | SECTION, WALL BUILD OUT SECTION, ETC) TO VERIFY |
| | COMPLIANCE WITH PROPOSED CONNECTION TYPE AND ANCHOR |
| | TYPE AND SPACING TO BE USED ACCORDING TO THE DESIGN |
| | PRESSURES, EDGE DISTANCE AND PANEL SPAN. |
| | |
| | 4- PLEASE MAKE SURE CORRECT ANCHOR SCHEDULE FROM |
| | SHUTTERS DRAWINGS IS USED. THIS BUILDING IS NOT A |
| | CONCRETE BUILDING. CHECK IF BUILDING IS CONCRETE BLOCK |
| | AND WOOD FRAMING ON THE SECOND FLOOR AND USE |
| | CORRESPONDING ANCHOR SCHEDULE. CONCRETE SCHEDULE MAY BE |
| | USED ON TOP CONNECTION IF THE OPENING LINTEL IS PRECAST |
| | LINTEL OR PART OF A CONCRETE TIE BEAM. USE CONCRETE |
| | BLOCK ANCHOR SCHEDULE ON BOTTOM CONNECTION (USE WOOD |
| | ANCHOR SCHEDULE FOR WOOD FRAMING). OTHERWISE, PROVIDE |
| | TESTING SHOWING THAT WINDOW SILLS ARE CONCRETE WITH THE |
| | REQUIRED STRENGTH AS SHOWN ON SHUTTERS DRAWINGS. |
| | |
| | JULIO GOMEZ |
| | BUILDING PLANS EXAMINER |
| | (561)805-6712 |