Plan Review Details - Permit 08100233
| Plan Review Stops For Permit 08100233 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2012-02-10 |
|
|
Cont ID |
|
| Sent By |
lmartine |
Date |
2012-02-10 |
Time |
16:23 |
Rev Time |
0.00 |
| Received By |
lmartine |
Date |
2012-02-10 |
Time |
16:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2009-10-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2009-10-15 |
Time |
13:51 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2009-10-15 |
Time |
13:51 |
Sent To |
|
|
| Notes |
| 2009-10-15 14:04:15 | THE STATUS WILL REMAIN AS FAILED UNTIL THE CONTRACTOR | | | SUBMITS A LETTER OF APPROVAL FROM THE ARMY CORPS OF | | | ENGINEERS. THE DOCK IS IN THE INTRACOASTAL WATERWAY. | | | THE ORIGINAL PERMIT WAS ISSUED TO REPAIR HURRICANE | | | DAMAGE AN EXISTING DOCK. DURING THE REPAIRS THE | | | CONFIGURATION OF THE DOCK WAS CHANGED WITHOUT APPROVAL | | | OF THE CORPS OF ENGINEERS. AFTER CONTACTING THE D.E.P. | | | AND THE CORPS OF ENGINEERS, I HAVE BEEN INFORMED THAT | | | THE MODIFICATIONS TO THE DOCK WILL REQUIRE THE CORPS | | | APPROVAL. THE D.E.P. HAS VISITED THE SITE AND | | | DETERMINED THAT IT IS EXEMPT FROM THEIR PERMIT | | | REQUIREMENTS. I CONTACTED KATY COLLINS AT THE D.E.P. | | | (561-681-6645) AND SARA SHEA AT THE ARMY CORPS OF | | | ENGINEERS (561-472-3525). |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2009-01-27 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2009-01-27 |
Time |
15:38 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2009-01-27 |
Time |
15:38 |
Sent To |
|
|
| Notes |
| 2009-01-27 15:38:26 | AS BUILT REVISIONS TO DOCK | | | | | | DENIED BY BUILDING | | | | | | 1) THE CONFIGURATION OF THE DOCK IN THE REVISED | | | DRAWINGS DOES NOT CORRESPOND TO THE DRAWINGS THAT WERE | | | APPROVED FOR THE ORIGINAL PERMIT. THEREFORE, THE | | | REVISED DRAWINGS WILL NEED TO BE REVIEWED AN APPROVED | | | BY THE ARMY CORP OF ENGINEERS. | | | | | | 2) ALL OF THE REVISED DRAWINGS AND DOCUMENTS THAT ARE | | | SUBMITTED FOR PUBLIC RECORD ARE REQUIRED TO HAVE THE | | | RAISED SEAL, ORIGINAL SIGNATURE AND DATE OF THE | | | RESPONSIBLE ENGINEER. SEE FAC 61G15-23.002. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2008-10-10 |
|
|
Cont ID |
|
| Sent By |
ssherman |
Date |
2008-10-10 |
Time |
10:19 |
Rev Time |
0.00 |
| Received By |
ssherman |
Date |
2008-10-10 |
Time |
10:19 |
Sent To |
|
|
| Notes |
| 2008-10-10 10:20:03 | FINAL INSPECTIONS FOR EXPIRED PERMIT # 04120095 | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2009-09-29 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2009-09-29 |
Time |
10:57 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2009-09-29 |
Time |
10:57 |
Sent To |
|
|
| Notes |
| 2009-09-29 10:57:58 | TO RM DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2009-01-21 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2009-01-21 |
Time |
13:00 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2009-01-21 |
Time |
13:00 |
Sent To |
B |
|
| Notes |
| 2009-01-21 13:00:33 | TO "LMARTINEZ" DESK/REV |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2012-02-09 |
|
|
Cont ID |
|
| Sent By |
ajones |
Date |
2012-02-09 |
Time |
12:57 |
Rev Time |
0.00 |
| Received By |
ajones |
Date |
2012-02-09 |
Time |
12:57 |
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |