Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2008-10-30 Cont ID  
Sent By amorse Date 2008-10-30 Time 13:54 Rev Time 1.00
Received By amorse Date 2008-10-30 Time 13:54 Sent To  
Notes
2008-10-30 13:55:26 
  
 DENIED
  
 THE FOLLOWING COMMENT WAS NOT ADDRESSED FROM 1ST REVIEW
  
 2) PEDESTRIAN BRIDGE IS REQUIRED TO BE ACCESSIBLE THIS
 WOULD ALSO ENCOMPASS THE GATE. SHOW COMPLIANCE WITH THE
 REQUIREMENTS OF SECTION 11-4.13 FBC, SPECIFICALLY
 11-4.13.3, 11-4.13.6 AND 11-4.13.9.
  
  
 THIS ITEM WAS DISCUSSED WITH THE OWNER, IBIS WEST PALM
 PARTNERS AND CORRECTIONS ARE TO BE MADE TO DRAWINGS
 WITH THE REQUESTED INFORMATION.
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2008-09-20 Cont ID  
Sent By amorse Date 2008-09-20 Time 08:17 Rev Time 0.00
Received By amorse Date 2008-09-20 Time 08:17 Sent To PC
Notes
2008-09-20 08:23:58 
  
 DENIED
  
 1) PROVIDE LAYOUT OF BRIDGE AND SITE PLAN THAT SHOWS
 WALKWAYS ETC.
  
 2) PEDESTRIAN BRIDGE IS REQUIRED TO BE ACCESSIBLE THIS
 WOULD ALSO ENCOMPASS THE GATE. SHOW COMPLIANCE WITH THE
 REQUIREMENTS OF SECTION 11-4.13 FBC, SPECIFICALLY
 11-4.13.3, 11-4.13.6 AND 11-4.13.9.
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2008-10-23 Cont ID  
Sent By shill Date 2008-10-23 Time 16:07 Rev Time 0.00
Received By shill Date 2008-10-23 Time 16:07 Sent To Z
Notes
2008-10-23 16:07:37TO "Z" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2008-09-10 Cont ID  
Sent By adarroug Date 2008-09-10 Time 09:01 Rev Time 0.00
Received By adarroug Date 2008-09-10 Time 09:01 Sent To  
Notes
2008-09-10 09:04:04TO "MISC" BOX#2

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2008-09-20 Time   Rev Time 0.00
Received By adarroug Date 2008-09-04 Time 09:49 Sent To  
Notes
2008-09-04 09:49:11TO "Z" BOX

Review Stop Z ZONING
Rev No 2 Status P Date 2008-10-29 Cont ID  
Sent By lfranco Date 2008-10-29 Time 14:23 Rev Time 0.00
Received By lfranco Date 2008-10-29 Time 14:23 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2008-09-08 Cont ID  
Sent By lfranco Date 2008-09-08 Time 17:38 Rev Time 0.00
Received By lfranco Date 2008-09-08 Time 17:38 Sent To  
Notes
2008-09-08 17:56:05PLANNING AND ZONING: **** FAILED ****
  
 1. RESPOND TO COMMENTS IN WRITING.
  
 2. PROVIDE SITE PLAN SHOWING THE LOCATION OF THE BRIDGE
 AND GATE.
  
 3. PURSUANT TO 94-302(A)(2) - THE GATE SHALL NOT
 CONTAIN ANY HAZARDOUS MATERIALS. THEREFORE, THE
 "ALUMINUM FAN" AS NOTED ON "GATE ELEVATION", SHEET S-1
 SHALL HAVE BLUNTED EDGES IN ORDER TO ELIMINATE THE
 EXPOSURE OF SHARP ELEMENTS.
  
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT ME.
  
 LINDA MIA FRANCO
 SENIOR PLANNER