| 2008-06-24 19:02:16 | 1. NEW FIRE MAIN PLANNED TO BE INSTALLED SHALL BE |
| | PROPERLY SUPPORTED AND RETRAINED. |
| | |
| | 2. ALL PORTIONS OF THE NEW FIRE MAIN SHALL BE PRESSURE |
| | TESTED AT 200 PSIG FOR A MINIMUM OF AT LEAST TWO |
| | HOURS. |
| | |
| | 3. THE NEW FIRE MAIN SHALL BE INSTALLED IN ACCORDANCE |
| | WITH NFPA 24, THE STANDARD FOR FIRE SERVICE MAINS AND |
| | THEIR APPURTENANCES. |
| | |
| | 4. THE NEW MAIN SHALL BE INSTALLED IN AN APPROVED AND |
| | PROFESSIONAL MANNER. |
| | |
| | 5. ENTIRE INSTALLATION IS SUBJECT TO FIELD INSPECTION |
| | AND APPROVAL. |
| | |
| | 6. ENTIRE INSTALLATION MUST BE INSPECTED, TESTED, AND |
| | APPROVED BY THE BUREAU OF FIRE PREVENTION PRIOR TO THIS |
| | LINE BEING PLACED INTO SERVICE. |
| | |
| | 7. AFTER APPROVAL, THIS INSTALLATION MUST BE PERFORMED |
| | IN A TIMELY MANNER AS THE BUILDING IS AND HAS BEEN |
| | CURRENTLY ON FIRE WATCH DUE TO A PORTION OF THE |
| | UNDERGROUND FIRE MAIN LEAKING. |
| | |
| | 8. AREAS THAT WERE EXCAVATED OR EXPOSED IN AN ATTEMPT |
| | TO LOCATE THE LEAK SHALL BE REPAIRED TO AS NEAR AS |
| | ORIGINAL CONDITION AS POSSIBLE TO PREVENT POSSIBLE |
| | INJURIES. |
| | |
| | 9. VERIFICATION THAT ANY SECTIONAL OR ISOLATION VALVES |
| | ARE OPENED AND REMAIN IN THAT POSITION AFTER |
| | INSTALLATION. |
| | |
| | 10. METHODS OR DEVICES SHALL BE INSTALLED TO ALLOW FOR |
| | INSPECTION OF THIS PIPING ARRANGEMENT AFTER |
| | INSTALLATION. |
| | |
| | |
| | MIKE CARSILLO, ACTING ASSISTANT FIRE CHIEF |
| | WEST PALM BEACH FIRE RESCUE |
| | 804-4709 PHONE |
| | 804-4774 FAX |