| Plan Review Stops For Permit 08050637 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2008-05-23 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2008-05-23 |
Time |
10:02 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2008-05-23 |
Time |
09:43 |
Sent To |
PC |
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2008-05-22 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2008-05-22 |
Time |
16:30 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2008-05-22 |
Time |
16:24 |
Sent To |
|
|
| Notes |
| 2008-05-22 16:54:16 | RESIDENTIAL (R3)SHUTTERS, BUILDING REVIEW CHECKLIST. | | | REVIEW UNDER FBC 2004 WITH 2007 REVISIONS. | | | | | | 1- ACCORDING TO KEY PLAN SUBMITTED OPENING #2 IS THE | | | EGRESS OPENING. CLARIFY HOW COMPLYING WITH SEC.R310.4 | | | OF 2004 FLORIDA RESIDENTIAL CODE, WHERE AT LEAST ONE | | | MEANS OF ESCAPE IS REQUIRED WHEN SHUTTERS ARE | | | INSTALLED. | | | | | | 2- CLARIFY WHY TWO DIFFERENT SCHEDULES WHERE SUBMITTED | | | WITH DIFFERENT DESIGN PRESSURES AND BUILDING EXPOSURE. | | | ANCHOR SPACING FOR -62PSF DESIGN PRESSURES NEEDS TO BE | | | REVISED. SEE REDLINEDINSTALLATION SCHEDULE. | | | | | | JULIO GOMEZ | | | BUILDING PLANS EXAMINER | | | (561) 805-6712 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2008-05-22 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2008-05-22 |
Time |
16:54 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2008-05-22 |
Time |
16:24 |
Sent To |
|
|
| Notes |
|
|
|