Plan Review Details - Permit 08050454
Plan Review Stops For Permit 08050454
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status N Date 2008-06-10 Cont ID  
Sent By rmcdouga Date 2008-06-10 Time 11:28 Rev Time 0.00
Received By rmcdouga Date 2008-06-10 Time 11:28 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 4 Status P Date 2009-04-13 Cont ID  
Sent By mgonzale Date 2009-04-13 Time 14:14 Rev Time 1.00
Received By mgonzale Date 2009-04-13 Time 14:12 Sent To  
Notes
2009-04-13 14:14:32****APPROVED*****
  
 ROOF DRAIN LOCATIONS AND INV ELEVATIONS OK
  
 PLANS STILL REFLECT BACKFLOWS TOO FAR INTO PROPERTY.
 BACFKLOWS MUST BE AT PROPERTY LINES (JUST INSIDE)
 WILL BE REQUIRED TO SUBMIT AS-BUILT UPON COMPLETION.
  
 [email protected]
 ENGINEERING PLAN REVIEW
  

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2008-07-31 Cont ID  
Sent By rchokshi Date 2008-07-31 Time 15:15 Rev Time 1.00
Received By dlauderm Date 2008-11-17 Time 14:15 Sent To  
Notes
2008-11-17 14:19:17PLANS WHERE APPROVED AS-NOTED BY ENGINEERING BACKFLOWS
 AS CLOSE TO SOURCE AS POSSIBLE. SEE PLAN.
 MANNY GONZALEZ
 PROJECT COORDINATOR
 CITY OF WPB ENGINEERING
 (561) 494-1085

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2008-07-31 Cont ID  
Sent By rchokshi Date 2008-07-31 Time 09:17 Rev Time 0.00
Received By rchokshi Date 2008-07-31 Time 09:01 Sent To  
Notes
2008-07-31 09:17:24FAILED FOR FOLLOWING REASONS:
  
 1. PLEASE SHOW ON DRAWINGS THE POLLUTION PREVENTION
 DETAILS,CLOTHES USED FOR SILT FENCE ETC., PLANS MUST
 SHOW SILT FENCE AROUND THE SITE,STORM CATCH BASIN
 DRAINS DURING CONSTRUCTION AND ALL DEMOLITION PHASE.
 HEIGHT OF FENCE SHOULD BE HIGH ENOUGH PER FDEP TO STOP
 DUST PARTICLES.
  
 OUR RESPONSE TO YOUR LETTER OF 7/10/08: WE COULD NOT
 FIND DRAWING SHOWING SILT FENCE & ITS DETAILS IN YOUR
 PACKAGE
  
 2. PLEASE PROVIDE A COPY OF BOND FOR ORDINANCE NO.
 4060-07:
  
 ALL DEMOLITION AND NEW CONSTRUCTION PERMITS, WITH
 EXCEPTION OF SINGLE FAMILY, DUPLEX AND ACCESSORY
 APARTMENT, SHALL POST BONDS OR DEPOSITS FOR THE
 FOLLOWING:
  
 1. EROSION CONTROL, AND
 2. LAND STABILIZATION
  
 THE AMOUNT OF THE EROSION CONTROL AND LAND
 STABILIZATION BONDS SHALL BE DETERMINED BY THE ENGINEER
 OF RECORD USING THE CURRENT CITY COST SCHEDULE AND
 VERIFIED BY THE CITY'S ENGINEERING SERVICES DEPT.
 PLEASE CONTACT BRIAN MOREE, ENG SERVICES CONSTRUCTION
 SUPERVISOR, AT 561- 494 -1040 FOR MORE INFORMATION.
  
 UPON VERTICAL CONSTRUCTION COMMENCEMENT, PAYMENT IN
 FULL OF ALL APPLICABLE FEES, AND COMPLIANCE WITH ALL
 TERMS AND CONDITIONS OF ANY POSTED BOND, THE PERMITTEE
 MAY REQUEST RELEASE OF THE BONDS OR DEPOSITS.
  
 A COPY OF ORDINANCE NO. 4060-07 MAY BE OBTAINED FROM
 THE CITY CLERK'S OFFICE LOCATED ON THE FIRST FLOOR.
  
 OUR RESPONSE TO YOUR LETTER OF 7/10/08: WE NEED A
 LETTER OR E-MAIL FROM BRIAN MOREE FOR HIS APPROVAL THAT
 BOND IS SATISFACTORY.
  
 3.PLEASE SHOW ON DRAINAGE DRAWINGTHE SITE AREA,
 GREEN, LAKE,PARKING AREA, IMPERVIOUS,PERVIOUS AREAYOU
 ARE DEVELOPING FOR THIS PROJECT . PLEASE PROVIDE A COPY
 OF THESE STORM WATER QUALITY CALCULATIONS.
  
 4. PLEASE SHOW ALL STORM WATER PIPES AROUND YOUR SITE
 SO, WE CANSEE THE LAYOUT OF STORM WATER PIPES FROM
 ALL OTHER STORM WATER PIPES.
  
 OUR RESPONSE TO YOUR LETTER OF 7/10/08:PLEASE PROVIDE
 THE DRAWING
  
 5. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND
 YOUR SITE FOR STORM WATER DRAIN SO YOUR SITE DO NOT GET
 FLOODED AND HAVE ENOUGH DRAINS.
  
 6. PLEASE MAKE SURE WATER/SEWER PLANS ARE APPROVED FROM
 MANNY G. OF 1000 45TH ST. BEFORE WE ISSUE A PERMIT.
  
 PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR
 PERMITTING PROCESS
  
 RASIK CHOKSHI805-6723

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2008-05-28 Cont ID  
Sent By rchokshi Date 2008-05-28 Time 11:19 Rev Time 0.00
Received By rchokshi Date 2008-05-28 Time 11:10 Sent To  
Notes
2008-05-28 11:19:33FAILED FOR FOLLOWING REASONS:
  
 1. PLEASE PROVIDE A COPY OF NOTICE OF INTENT (NOI).
 PLEASE APPLY AT FDEP, NPDES STORMWATER SECTION FOR
 NOI.
 YOU CAN GET NOI INFO FROM
 WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/
 NOTICE OF INTENT DEP FORM 62-621.300(4)(B),
 EFFECTIVE MAY 1, 2003
  
 2. PLEASE SHOW ON DRAWINGS THE POLLUTION PREVENTION
 DETAILS,CLOTHES USED FOR SILT FENCE ETC., PLANS MUST
 SHOW SILT FENCE AROUND THE SITE,STORM CATCH BASIN
 DRAINS DURING CONSTRUCTION AND ALL DEMOLITION PHASE.
 HEIGHT OF FENCE SHOULD BE HIGH ENOUGH PER FDEP TO STOP
 DUST PARTICLES.
  
 3. PLEASE PROVIDE A COPY OF BOND FOR ORDINANCE NO.
 4060-07:
  
 ALL DEMOLITION AND NEW CONSTRUCTION PERMITS, WITH
 EXCEPTION OF SINGLE FAMILY, DUPLEX AND ACCESSORY
 APARTMENT, SHALL POST BONDS OR DEPOSITS FOR THE
 FOLLOWING:
  
 1. EROSION CONTROL, AND
 2. LAND STABILIZATION
  
 THE AMOUNT OF THE EROSION CONTROL AND LAND
 STABILIZATION BONDS SHALL BE DETERMINED BY THE ENGINEER
 OF RECORD USING THE CURRENT CITY COST SCHEDULE AND
 VERIFIED BY THE CITY'S ENGINEERING SERVICES DEPT.
 PLEASE CONTACT BRIAN MOREE, ENG SERVICES CONSTRUCTION
 SUPERVISOR, AT 561- 494 -1040 FOR MORE INFORMATION.
  
 UPON VERTICAL CONSTRUCTION COMMENCEMENT, PAYMENT IN
 FULL OF ALL APPLICABLE FEES, AND COMPLIANCE WITH ALL
 TERMS AND CONDITIONS OF ANY POSTED BOND, THE PERMITTEE
 MAY REQUEST RELEASE OF THE BONDS OR DEPOSITS.
  
 A COPY OF ORDINANCE NO. 4060-07 MAY BE OBTAINED FROM
 THE CITY CLERK'S OFFICE LOCATED ON THE FIRST FLOOR.
  
 4. PLEASE SHOW ON STORM WATER QUALITY CALCULATION THAT
 YOU HAVE CONSIDERED FLOOD ZONE AREA, & 5,10, 25, 100
 YEAR FLOOD CRITERIA AND CROWN OF THE ROAD WHEN YOU
 DETERMINE THE FIRST FLOOR ELEVATION. FIRST FLOOR
 ELEVATION SHOULD BE ATLEAST 1 FOOT HIGHER THAN HIGHEST
 CROWN OF THE ROAD.
  
 5. PLEASE SHOW ON DRAINAGE DRAWINGTHE SITE AREA,
 GREEN, LAKE,PARKING AREA, IMPERVIOUS,PERVIOUS AREAYOU
 ARE DEVELOPING FOR THIS PROJECT . PLEASEMAKE SURE
 THESE AREAS SHOWN ON DRAINAGE DRAWINGS MUST MATCH WITH
 AND USED IN STORM WATER QUALITY CALCULATIONS. PLEASE
 PROVIDE A COPY OF THESE STORM WATER QUALITY
 CALCULATIONS.
  
 6. PLEASE SHOW ALL STORM WATER PIPES AROUND YOUR SITE
 SO, WE CANSEE THE LAYOUT OF STORM WATER PIPES FROM
 ALL OTHER STORM WATER PIPES. PLEASE SHOW DETAIL OF THE
 CONTROL STRUCTURESWITH ELEVATIONS, NOTCHES, BLEEDING
 ELEVATION, ETC ON DRAWINGS, CALCULATION FOR
 EXFILTRATION TRENCHES, PLEASE SHOW DRY DETENTION/WET
 DETENTION AREAS IN STORM WATER CALS IF YOU HAVE ALL
 THESE. PLEASE SUBMIT GEO-TECH REPORT AND ALL
 ENVRONMENTAL REPORT.
  
 7. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND
 YOUR SITE FOR STORM WATER DRAIN SO YOUR SITE DO NOT GET
 FLOODED AND HAVE ENOUGH DRAINS.
  
 8. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, GEO-TECH
 REPORT&STORM WATER QUALITY CALCULATIONS. SFWMD
 PERMIT &STORM WATER QUALITY CALS MUST BE APPROVED
 FROM 100045TH STREET ENGINEERING SERVICES BEFORE WE
 APPROVE.
  
 PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR
 PERMITTING PROCESS
  
 RASIK CHOKSHI805-6723

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2008-11-20 Cont ID  
Sent By mawillia Date 2008-11-20 Time 12:41 Rev Time 0.00
Received By mawillia Date 2008-11-20 Time 12:14 Sent To  
Notes
2008-11-20 12:33:16*****FIRE LINE REVISION APPROVED*****
  
  
 REVISED PLAN SHEET 2 OF 5 STAMPED, INITIALED, AND
 DATED.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2008-11-05 Cont ID  
Sent By adarroug Date 2008-11-05 Time 10:53 Rev Time 0.00
Received By adarroug Date 2008-11-05 Time 10:53 Sent To ENG
Notes
2008-11-05 10:54:30TO "ENG" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2008-11-03 Cont ID  
Sent By adarroug Date 2008-11-03 Time 16:23 Rev Time 0.00
Received By adarroug Date 2008-11-03 Time 16:23 Sent To Z
Notes
2008-11-03 16:23:56TO "Z" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2008-06-10 Cont ID  
Sent By rmcdouga Date 2008-06-10 Time 11:28 Rev Time 0.00
Received By rmcdouga Date 2008-05-16 Time 16:40 Sent To  
Notes
2008-05-16 16:41:10TO "Z" BOX

Review Stop L LANDSCAPING
Rev No 1 Status N Date 2008-05-19 Cont ID  
Sent By kdfreema Date 2008-05-19 Time 11:16 Rev Time 0.00
Received By kdfreema Date 2008-05-19 Time 11:15 Sent To ENG
Notes
2008-05-19 11:16:43***NOT REQUIRED***
  
 LANDSCAPING TO BE SUBMITTED AT THE SAME TIME AS
 VERTICAL CONSTRUCTION PERMIT.

Review Stop Z ZONING
Rev No 2 Status P Date 2008-07-22 Cont ID  
Sent By kdfreema Date 2008-07-22 Time 09:57 Rev Time 0.00
Received By kdfreema Date 2008-07-22 Time 09:57 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2008-05-19 Cont ID  
Sent By kdfreema Date 2008-05-19 Time 11:15 Rev Time 0.00
Received By kdfreema Date 2008-05-19 Time 11:15 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved