| 2008-05-28 11:19:33 | FAILED FOR FOLLOWING REASONS: |
| | |
| | 1. PLEASE PROVIDE A COPY OF NOTICE OF INTENT (NOI). |
| | PLEASE APPLY AT FDEP, NPDES STORMWATER SECTION FOR |
| | NOI. |
| | YOU CAN GET NOI INFO FROM |
| | WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/ |
| | NOTICE OF INTENT DEP FORM 62-621.300(4)(B), |
| | EFFECTIVE MAY 1, 2003 |
| | |
| | 2. PLEASE SHOW ON DRAWINGS THE POLLUTION PREVENTION |
| | DETAILS,CLOTHES USED FOR SILT FENCE ETC., PLANS MUST |
| | SHOW SILT FENCE AROUND THE SITE,STORM CATCH BASIN |
| | DRAINS DURING CONSTRUCTION AND ALL DEMOLITION PHASE. |
| | HEIGHT OF FENCE SHOULD BE HIGH ENOUGH PER FDEP TO STOP |
| | DUST PARTICLES. |
| | |
| | 3. PLEASE PROVIDE A COPY OF BOND FOR ORDINANCE NO. |
| | 4060-07: |
| | |
| | ALL DEMOLITION AND NEW CONSTRUCTION PERMITS, WITH |
| | EXCEPTION OF SINGLE FAMILY, DUPLEX AND ACCESSORY |
| | APARTMENT, SHALL POST BONDS OR DEPOSITS FOR THE |
| | FOLLOWING: |
| | |
| | 1. EROSION CONTROL, AND |
| | 2. LAND STABILIZATION |
| | |
| | THE AMOUNT OF THE EROSION CONTROL AND LAND |
| | STABILIZATION BONDS SHALL BE DETERMINED BY THE ENGINEER |
| | OF RECORD USING THE CURRENT CITY COST SCHEDULE AND |
| | VERIFIED BY THE CITY'S ENGINEERING SERVICES DEPT. |
| | PLEASE CONTACT BRIAN MOREE, ENG SERVICES CONSTRUCTION |
| | SUPERVISOR, AT 561- 494 -1040 FOR MORE INFORMATION. |
| | |
| | UPON VERTICAL CONSTRUCTION COMMENCEMENT, PAYMENT IN |
| | FULL OF ALL APPLICABLE FEES, AND COMPLIANCE WITH ALL |
| | TERMS AND CONDITIONS OF ANY POSTED BOND, THE PERMITTEE |
| | MAY REQUEST RELEASE OF THE BONDS OR DEPOSITS. |
| | |
| | A COPY OF ORDINANCE NO. 4060-07 MAY BE OBTAINED FROM |
| | THE CITY CLERK'S OFFICE LOCATED ON THE FIRST FLOOR. |
| | |
| | 4. PLEASE SHOW ON STORM WATER QUALITY CALCULATION THAT |
| | YOU HAVE CONSIDERED FLOOD ZONE AREA, & 5,10, 25, 100 |
| | YEAR FLOOD CRITERIA AND CROWN OF THE ROAD WHEN YOU |
| | DETERMINE THE FIRST FLOOR ELEVATION. FIRST FLOOR |
| | ELEVATION SHOULD BE ATLEAST 1 FOOT HIGHER THAN HIGHEST |
| | CROWN OF THE ROAD. |
| | |
| | 5. PLEASE SHOW ON DRAINAGE DRAWINGTHE SITE AREA, |
| | GREEN, LAKE,PARKING AREA, IMPERVIOUS,PERVIOUS AREAYOU |
| | ARE DEVELOPING FOR THIS PROJECT . PLEASEMAKE SURE |
| | THESE AREAS SHOWN ON DRAINAGE DRAWINGS MUST MATCH WITH |
| | AND USED IN STORM WATER QUALITY CALCULATIONS. PLEASE |
| | PROVIDE A COPY OF THESE STORM WATER QUALITY |
| | CALCULATIONS. |
| | |
| | 6. PLEASE SHOW ALL STORM WATER PIPES AROUND YOUR SITE |
| | SO, WE CANSEE THE LAYOUT OF STORM WATER PIPES FROM |
| | ALL OTHER STORM WATER PIPES. PLEASE SHOW DETAIL OF THE |
| | CONTROL STRUCTURESWITH ELEVATIONS, NOTCHES, BLEEDING |
| | ELEVATION, ETC ON DRAWINGS, CALCULATION FOR |
| | EXFILTRATION TRENCHES, PLEASE SHOW DRY DETENTION/WET |
| | DETENTION AREAS IN STORM WATER CALS IF YOU HAVE ALL |
| | THESE. PLEASE SUBMIT GEO-TECH REPORT AND ALL |
| | ENVRONMENTAL REPORT. |
| | |
| | 7. ALSO PLEASE SHOW ALL CATCH BASINS NEAREST,AROUND |
| | YOUR SITE FOR STORM WATER DRAIN SO YOUR SITE DO NOT GET |
| | FLOODED AND HAVE ENOUGH DRAINS. |
| | |
| | 8. PLEASE PROVIDE A COPY OF SFWMD PERMIT,, GEO-TECH |
| | REPORT&STORM WATER QUALITY CALCULATIONS. SFWMD |
| | PERMIT &STORM WATER QUALITY CALS MUST BE APPROVED |
| | FROM 100045TH STREET ENGINEERING SERVICES BEFORE WE |
| | APPROVE. |
| | |
| | PLEASE RESPOND EACH ITEM IN DETAIL TO EXPEDITE YOUR |
| | PERMITTING PROCESS |
| | |
| | RASIK CHOKSHI805-6723 |