| Plan Review Stops For Permit 08050365 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2008-06-13 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2008-06-13 |
Time |
16:13 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2008-06-13 |
Time |
16:13 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2008-05-21 |
|
|
Cont ID |
|
| Sent By |
kconrad |
Date |
2008-05-21 |
Time |
10:10 |
Rev Time |
0.00 |
| Received By |
kconrad |
Date |
2008-05-21 |
Time |
10:10 |
Sent To |
I |
|
| Notes |
| 2008-05-21 10:13:42 | PRE-INSPECT PERFORMED BY DR. THE WORK HAS BEEN | | | COMPLETED AND IS SUBJECT TO A 4X FEE. THE PROJECT | | | VALUATION APPEARS TO BE LOW AND SHOULD BE INCREASED TO | | | REFLECT THE ACTUAL SCOPE OF WORK. ALSO, REQUIRE THE | | | SUBMITTAL OF THE CRSI/ENGINEERING DETAILS FOR THE | | | CONCRETE RESTORATION WORK THAT WAS PERFORMED. AT THIS | | | TIME THE PERMIT ISSUANCE IS DENIED. |
|
|
|