Plan Review Details - Permit 08030652
| Plan Review Stops For Permit 08030652 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2008-04-17 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2008-04-17 |
Time |
15:37 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2008-04-17 |
Time |
15:35 |
Sent To |
PC |
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2008-04-15 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2008-04-15 |
Time |
17:03 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2008-04-15 |
Time |
16:21 |
Sent To |
PC |
|
| Notes |
| 2008-04-15 17:07:12 | REROOF BUILDING REVIEWSECOND CHECKLIST. | | | REVIEW UNDER FBC 2004 WITH 2007 REVISIONS. | | | | | | 1- SPECIFY HOW COMPLYING WITH THE SECONDARY WATER | | | BARRIER REQUIREMENTSOF FS553.844. (REPEAT COMMENT). | | | | | | JULIO GOMEZ | | | BUILDING PLANS EXAMINER | | | (561)805-6712 |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2008-03-31 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2008-03-31 |
Time |
17:00 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2008-03-31 |
Time |
17:00 |
Sent To |
PC |
|
| Notes |
| 2008-03-31 17:07:51 | RESIDENTIAL RE-ROOF BUILDING REVIEW CHECKLIST. REVIEW | | | UNDER FBC 2004 WITH 2007 REVISIONS. | | | | | | 1- SPECIFY WHICH APPROVED ASSEMBLY IS GOING TO BE | | | INSTALLED TO VERIFY COMPLIANCE WITH GENERAL LIMITATION | | | #7OF NOA 03-0501.02AND NAIL ENHANCING SUBMITTED. | | | | | | | | | 2- SPECIFY SPECIFIC BASE SHEET FASTENING OPTION IF | | | SELECTED ASSEMBLY HAS SEVERAL FASTENING OPTIONS. | | | | | | 3- SPECIFY HOW COMPLYING WITH THE SECONDARY WATER | | | BARRIER AS REQUIRED BY SEC. FS553.844(5)(A). | | | | | | 4- NAIL ENHANCING FASTENING SHOWN ON SECOND PAGE OF | | | HIGH VELOCITY PERMIT APPLICATIONSUBMITTED DOESN'T | | | WORK FOR THE CALCULATED DESIGN PRESSURES.ALSO, NEED | | | TO SPECIFY FASTENER SPACING THAT WORKS FOR FIELD AREA. | | | 12"O.C. @ LAP AND 2 ROWS @ 12"O.C. DON'T RESIST THE | | | -52.5PSF.TO AVOID CONFUSIONS, PLEASE DON'T USE | | | ANOTHER MUNICIPALITY PERMIT APPLICATIONS FORMS. | | | PROVIDE REQUIRED INFORMATION ON SEPARATE SHEETS WITH | | | CONTRACTOR'S LETTER HEAD TO SIMPLIFY PROCESS. SEE | | | ATTACHED CITY POLICY FOR ROOFING PERMITS.PROVIDE | | | ACTUAL RAS 117 CALCULATIONS AS REQUIRED BY GENERAL | | | LIMITATION #7. | | | | | | 5- THIS JURISDICTION HAS NOT ADOPTED THE RAS 150. | | | | | | JULIO GOMEZ | | | BUILDING PLANS EXAMINER | | | (561)805-6712 |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2008-03-28 |
|
|
Cont ID |
|
| Sent By |
ssherman |
Date |
2008-03-28 |
Time |
09:48 |
Rev Time |
0.00 |
| Received By |
ssherman |
Date |
2008-03-28 |
Time |
09:48 |
Sent To |
|
|
| Notes |
| 2008-03-28 09:48:21 | HISTORICAL APPROVAL PER GALINA JUDGE |
|
|
|
Account Summary | Usage Policy | Privacy Policy