| Plan Review Stops For Permit 08030389 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
P |
Date |
2008-04-07 |
|
|
Cont ID |
|
| Sent By |
lursu |
Date |
2008-04-07 |
Time |
08:51 |
Rev Time |
0.00 |
| Received By |
lursu |
Date |
2008-04-07 |
Time |
08:51 |
Sent To |
|
|
| Notes |
| 2008-04-07 08:52:57 | PROJECT STARTS AT THE INTERSECTION OF 15TH ST AND THE | | | RAILROAD AND PERMIT WAS ATTACHED TO THE NEAREST ADDRESS | | | FOUND AT THE STARTING POINT . | | | | | | LACRAMIOARA URSU | | | MIS - GIS SUPPORT SPECIALIST | | | CITY OF WEST PALM BEACH | | | OFFICE:822-1239 | | | FAX: 822-1249 | | | E-MAIL:[email protected] |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2008-05-12 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2008-05-12 |
Time |
16:35 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2008-05-12 |
Time |
16:35 |
Sent To |
|
|
| Notes |
| 2008-05-12 16:35:41 | 2004 FBC W/2007 REVISIONS | | | WORKING DRAWING REVIEW | | | | | | 1) SHEET C-14 ON ONE SET OF THE DRAWINGS DOES NOT HAVE | | | THE EMBOSSED SEAL OF THE ENGINEER. ALL SHEETS WILL BE | | | REQUIRED TO BE SIGNED AND SEALED BEFORE PERMIT IS | | | ISSUED. | | | | | | 2) ENGINEERED DRAWINGS AND DESIGN CALCULATIONS FOR THE | | | PRE-CAST POST, WALL AND FOUNDATION FOR WINDLOADING WILL | | | BE REQUIRED BEFORE PERMIT IS ISSUED. | | | | | | 3) SIGNED AND SEALED SHOP DRAWINGS WITH THE SHOP | | | DRAWING APPROVAL STAMP OF THE CITY ENGINEER WILL BE | | | REQUIRED. THESE CAN BE SUBMITTED AFTER PERMIT HAS BEEN | | | ISSUED. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2008-04-04 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2008-04-04 |
Time |
08:53 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2008-04-03 |
Time |
18:17 |
Sent To |
AD |
|
| Notes |
| 2008-04-04 10:37:48 | 2004 FBC W/2007 REVISIONS | | | INSTALL BUFFER WALL AND FENCE | | | PLAN REVIEW | | | | | | DENIED BY BUILDING | | | | | | 1) ON SHEETS G1 AND C11 THE PLANS REFERENCE ACI 318-95. | | | THE 2004 FBC REFERENCES ACI 318-02. PLEASE REVISE. FBC | | | CHAPTER 35 | | | | | | 2) ON THE PLANS, SPECIFY ALL DIMENSIONS FOR THE | | | PRE-CAST POST FOUNDATION, INCLUDING THE THICKNESS. FBC | | | 106.1.1* CITY AMENDMENTS | | | | | | 3) ENGINEERED SHOP DRAWINGS WILL BE REQUIRED FOR THE | | | PRE-CAST POSTS AND PANELS. FBC 106.1.2* CITY AMENDMENTS | | | | | | | | | 4) SUBMIT WINDLOAD CALCULATIONS FOR THE WALL. FBC | | | 106.1.2* CITY AMENDMENTS | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | [email protected] |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
N |
Date |
2008-04-02 |
|
|
Cont ID |
|
| Sent By |
rchokshi |
Date |
2008-04-02 |
Time |
10:52 |
Rev Time |
0.00 |
| Received By |
rchokshi |
Date |
2008-04-02 |
Time |
10:52 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2008-04-18 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2008-04-18 |
Time |
09:36 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2008-04-18 |
Time |
09:36 |
Sent To |
Z |
|
| Notes |
| 2008-04-18 09:38:11 | TO "Z" BOX/RESUB |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2008-04-07 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2008-04-07 |
Time |
08:43 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2008-03-17 |
Time |
16:30 |
Sent To |
|
|
| Notes |
| 2008-03-17 16:30:28 | TO "Z" BOX |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2008-05-06 |
|
|
Cont ID |
|
| Sent By |
bpowell |
Date |
2008-05-06 |
Time |
16:13 |
Rev Time |
0.00 |
| Received By |
bpowell |
Date |
2008-05-06 |
Time |
16:13 |
Sent To |
B |
|
| Notes |
| 2008-05-08 09:36:00 | 1. LANDSCAPE PLANS SHALL BE REVIEWED AND APPROVED BY | | | THE PLANNING AND ZONING DEPARTMENT BEFORE A PERMIT IS | | | ISSUED. | | | | | | 2. THERE ARE NO NEW ISSUES WITH THESE PLANS.THEY HAVE | | | PASSED THE REVIEW PROCESS. | | | | | | FOR ANY QUESTIONS OR COMMENTS CONTACT: BOBBY POWELL | | | JR., PLANNER, 822-1449 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2008-04-01 |
|
|
Cont ID |
|
| Sent By |
bpowell |
Date |
2008-04-01 |
Time |
15:43 |
Rev Time |
0.00 |
| Received By |
bpowell |
Date |
2008-04-01 |
Time |
15:43 |
Sent To |
ENG |
|
| Notes |
| 2008-04-01 15:44:52 | 1.PLEASE IDENTIFY WHAT THE X'S SYMBOLIZE ON THE SITE | | | PLAN.IT IS DIFFICULT TO UNDERSTAND WHAT IS FIBER | | | OPTIC, AND WHAT IS CHAIN LINK FENCE. | | | | | | 2.ON SHEET S2, ON THE SOUTH SIDE OF LILAC COURT THE | | | PROPOSED WALL WILL ENCROACH AN EXISTING BUILDING. | | | | | | 3.ON SHEET S3 THE WALL ENCROACHES 19TH STREET. | | | | | | 4.PLEASE IDENTIFY WHERE THE FEC RIGHT OF WAY BEGINS | | | ON THE EXISTING SITE PLAN. | | | | | | 5.PLACEMENT OF THE FEC BUFFER WALL SHALL BE | | | CONSISTENT THROUGHOUT ALL PLANS.IT IS NOT CLEARLY | | | IDENTIFIED ON THE SURVEY OR THE SITE PLAN EXACTLY WHERE | | | THE FEC BUFFER WALL WILL BE PLACED. | | | | | | 6. THE PLANS ON SHEET C-9 & C-10 ARE LABELED WITH BOTH | | | A CHAIN LINK FENCE AND THE BUFFER WALL.EACH IS IN A | | | DIFFERENT LOCATION. | | | | | | 7. THE PLANS SHALL SHOW THE DIMENSIONS OF WHERE THE | | | CHAIN LINK FENCE IS LOCATED AND WHERE THE WALL BEGINS. | | | AS IS DONE FOR THE METAL FENCE APPROACHING 23RD | | | STREET. | | | | | | | | | FOR QUESTIONS OR COMMENTS PLEASE CONTACT: BOBBY POWELL | | | JR. |
|
|