Plan Review Details - Permit 08020490
Plan Review Stops For Permit 08020490
Review Stop B BUILDING (STRUCTURAL)
Rev No 9 Status P Date 2010-05-10 Cont ID  
Sent By rbrown Date 2010-05-10 Time 18:21 Rev Time 0.00
Received By rbrown Date 2010-05-10 Time 18:21 Sent To  
Notes
2010-05-10 18:24:34ENGINEER'S COLUMN SHORING, GUSSET PLATE AND CAISSON
 REINFORCEMENT DETAIL SHEETS SK-R1, SK-R2, AND SK-R3

Review Stop B BUILDING (STRUCTURAL)
Rev No 8 Status F Date 2009-09-14 Cont ID  
Sent By rbrown Date 2009-09-14 Time 10:50 Rev Time 0.00
Received By rbrown Date 2009-09-14 Time 10:50 Sent To  
Notes
2009-09-14 10:53:11NEED MORE DOCUMENTATION FOR REQUEST FOR PERMISSION TO
 WORK OUSTIDE NORMAL CONSTRUCTION HOURS.
  
 AS STATED IN THE LAST SENTENCE OF ROBERT BROWN'S EMAIL
 SENT TO BRETT ROWAN AND DAVID COLSTON ON 8/5/09, WE
 STILL NEED SOME FORM OF ACKNOWLEDGEMENT FROM ONE
 WATERMARK CONDOMINIUM MANAGEMENT. WE NEED A COPY OF
 EITHER, (1) A LETTER FROM THE CONDOMINIUM MANAGER
 STATING THAT THEY WILL PERSONALLY CONTACT THE CONDO
 OWNERS (IT IS NOT SUFFICIENT FOR THEM TO JUST POST A
 NOTICE ON A BULLETIN BOARD), OR (2) A LETTER THAT YOU
 WRITE TO THE CONDOMINIUM MANAGER, WHICH STATES THAT
 THEY WILL CONTACT THE CONDO OWNERS, AND WHICH HAS A
 SIGNATURE LINE WITH THE CONDOMINIUM MANAGER'S SIGNATURE
 TO ACKNOWLEDGE THAT RESPONSIBILITY.
  
 **QUOTE PERMIT# ON ALL CORRESPONDENCE**
  
 END OF REVIEW COMMENTS
 THE CODE REFERENCES GIVE ADDITIONAL INFO
 TELEPHONE: (561) 805 6652 ROBERT BROWN
 E-MAIL: [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 7 Status P Date 2009-08-05 Cont ID  
Sent By rbrown Date 2009-08-05 Time 19:58 Rev Time 0.00
Received By rbrown Date 2009-08-05 Time 19:57 Sent To  
Notes
2009-08-05 20:02:42SUBMITTAL ON 7/7/09 FOR HENRY S. KREH, P.E., REPORT ON
 SHORING FOR COLUMN REPAIR @ COLUMN M-8, AND REVIEW OF
 SHORING FOR COLUMN REPAIRS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status P Date 2009-02-24 Cont ID  
Sent By kconrad Date 2009-02-24 Time 08:58 Rev Time 0.00
Received By kconrad Date 2009-02-24 Time 08:58 Sent To  
Notes
2009-02-24 09:01:59FIELD SUBMITTAL FOR ADDITIONAL STRUCTURAL REINFORCEMENT
 FOR COLUMN M8 AT 3RD FLOOR. DRAWING DATED 2/23/09 BY
 DAVID COLSTON, EOR.

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2008-04-02 Cont ID  
Sent By kconrad Date 2008-04-02 Time 18:40 Rev Time 0.00
Received By kconrad Date 2008-04-02 Time 16:00 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date   Cont ID  
Sent By   Date 2008-03-26 Time 19:15 Rev Time 0.00
Received By kconrad Date 2008-03-25 Time 17:15 Sent To  
Notes
2008-03-25 19:13:08PROJECT: 625 NORTH FLAGLER/BANK OF AMERICA BUILDING
  
 PROJECT DETAIL: REVISION/CUSTOM SHORING PLANS FOR
 CONCRETE COLUMN REPAIRS/3 AND 4TH FLOORS
  
 CODE REVIEW:
 2004 FLORIDA EXISTING BUILDING CODE W/2006 REVISIONS
 2004 FLORIDA BUILDING CODE W/ 2006 REVISIONS
 CITY OF WEST PALM BEACH AMENDMENTS 2004 EDITION
  
 STATUS:
  
 COMMENTS:
  
 1) THE DESIGN ENGINEER SHALL SIGN AND SEAL ALL SHEETS
 OF THE SUBMITTED PLAN. THE TITLE SHEET WAS NOT SIGNED
 AND SEALED AS PER THE FOLLOWING:
  
 471.025SEALS.--
  
 (1)THE BOARD SHALL PRESCRIBE, BY RULE, ONE OR MORE
 FORMS OF SEAL TO BE USED BY LICENSEES. EACH LICENSEE
 SHALL OBTAIN AT LEAST ONE SEAL IN THE FORM APPROVED BY
 RULE OF THE BOARD AND MAY, IN ADDITION, REGISTER HIS OR
 HER SEAL ELECTRONICALLY IN ACCORDANCE WITH SS.
 668.001-668.006. ALL FINAL DRAWINGS, SPECIFICATIONS,
 PLANS, REPORTS, OR DOCUMENTS PREPARED OR ISSUED BY THE
 LICENSEE AND BEING FILED FOR PUBLIC RECORD AND ALL
 FINAL DOCUMENTS PROVIDED TO THE OWNER OR THE OWNER'S
 REPRESENTATIVE SHALL BE SIGNED BY THE LICENSEE, DATED,
 AND SEALED WITH SAID SEAL. SUCH SIGNATURE, DATE, AND
 SEAL SHALL BE EVIDENCE OF THE AUTHENTICITY OF THAT TO
 WHICH THEY ARE AFFIXED. DRAWINGS, SPECIFICATIONS,
 PLANS, REPORTS, FINAL DOCUMENTS, OR DOCUMENTS PREPARED
 OR ISSUED BY A LICENSEE MAY BE TRANSMITTED
 ELECTRONICALLY AND MAY BE SIGNED BY THE LICENSEE,
 DATED, AND SEALED ELECTRONICALLY WITH SAID SEAL IN
 ACCORDANCE WITH SS. 668.001-668.006.
  
  
 2) DUE TO THE COMPLEXITY OF THIS CONCRETE RESTORATION
 PROJECT AND THE MAGNITUDE OF THE PROPOSED SHORING
 INSTALLATION, THE FOLLOWING SHALL BE REQUIRED:
  
 105.14 PERMIT ISSUED ON BASIS OF AN AFFIDAVIT.
  
 WHENEVER A PERMIT IS ISSUED IN RELIANCE UPON AN
 AFFIDAVIT OR WHENEVER THE WORK TO BE COVERED BY A
 PERMIT INVOLVES INSTALLATION UNDER CONDITIONS WHICH, IN
 THE OPINION OF THE BUILDING OFFICIAL, ARE HAZARDOUS OR
 COMPLEX, THE BUILDING OFFICIAL SHALL REQUIRE THAT THE
 ARCHITECT OR ENGINEER WHO SIGNED THE AFFIDAVIT OR
 PREPARED THE DRAWINGS OR COMPUTATIONS SHALL SUPERVISE
 SUCH WORK. IN ADDITION, THEY SHALL BE RESPONSIBLE FOR
 CONFORMITY TO THE PERMIT, PROVIDE COPIES OF INSPECTION
 REPORTS AS INSPECTIONS ARE PERFORMED, AND UPON
 COMPLETION MAKE AND FILE WITH THE BUILDING OFFICIAL
 WRITTEN AFFIDAVIT THAT THE WORK HAS BEEN DONE IN
 CONFORMITY TO THE REVIEWED PLANS AND WITH THE
 STRUCTURAL PROVISIONS OF THE TECHNICAL CODES. IN THE
 EVENT SUCH ARCHITECT OR ENGINEER IS NOT AVAILABLE, THE
 OWNER SHALL EMPLOY IN HIS STEAD A COMPETENT PERSON OR
 AGENCY WHOSE QUALIFICATIONS ARE REVIEWED BY THE
 BUILDING OFFICIAL. THE BUILDING OFFICIAL SHALL ENSURE
 THAT ANY PERSON CONDUCTING PLANS REVIEW IS QUALIFIED AS
 A PLANS EXAMINER UNDER PART XII OF CHAPTER 468, FLORIDA
 STATUTES, AND THAT ANY PERSON CONDUCTING INSPECTIONS IS
 QUALIFIED AS A BUILDING INSPECTOR UNDER PART III OF
 CHAPTER 468, FLORIDA STATUTES.
  
 3) A SAFETY PLAN SHALL BE SUBMITTED INDICATING THE
 CONSTRUCTION SAFEGUARDS TO BE UTILIZED AND SHALL MEET
 THE MINIMUM REQUIREMENTS OF THE FLORIDA EXISTING
 BUILDING CODE, CHAPTER 13. PLEASE SUBMIT SPECIFICATIONS
 FOR ANY WORK PLATFORMS THAT WILL BE USED.
  
 4) A "MAINTENANCE OF TRAFFIC" PERMIT IS REQUIRED WHEN
 ANY CITY RIGHT OF WAY IS PARTIALLY BLOCKED OR CLOSED.
  
 5) PLEASE PROVIDE NOTE INDICATING WHERE THE CUSTOM
 SHORING WILL TRANSFER LOADS.
  
 6) PLEASE INDICATE WELD DESIGNATIONS AT APPLICABLE
 CONNECTIONS.
  
 7) PLEASE PROVIDE THE MANUFACTURER'S SPECIFICATIONS FOR
 THE CONVENTIONAL SHORING.
  
 8) PLEASE PROVIDE CLARIFICATION: WILLTHECOLUMNS AT
 GRID LINE K-8,L-8,M-8 AND N-8 BE REPAIRED ON THE 3RD
 AND 4TH FLOOR?
  
 9) UPON REVIEWING THE BASIC LOAD FACTOR COMBINATIONS AS
 PER THE FBC, SECTION 1605 AND REVIEWING THE
 CALCULATIONS ON SHEET 6, THERE APPEARS TO BE NO WIND
 FACTOR WITHIN THE FORMER CALCULATION. PLEASE PROVIDE
 JUSTIFICATION.
  
 10) AS INDICATED ON THE CALCULATION SHEET #22, A W24X68
 TOP BEAM IS SHOWN TO BE ACCEPTED. HOWEVER, A W27X94 IS
 REFLECTED ON SHEET 3.0 OF THE SHORING PLAN.
  
 PLAN REVIEW: KEN CONRAD
 PHONE: 561.805.6666
 E-MAIL: KCONRAD @WPB.ORG
  
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status N Date 2008-03-25 Cont ID  
Sent By amorse Date 2008-03-25 Time 16:24 Rev Time 0.00
Received By amorse Date 2008-03-25 Time 16:24 Sent To  
Notes
2008-03-25 16:26:49 
  
 ROUTED TO KEN CONRAD, HE MEET WITH DESIGNERS AND
 CONTRACTOR ON SITE AND HAS FAMILIARITY WITH NEW SCOPE
 OF WORK.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2008-03-11 Cont ID  
Sent By amorse Date 2008-03-11 Time 18:00 Rev Time 0.00
Received By amorse Date 2008-03-11 Time 18:00 Sent To PC
Notes
2008-03-11 18:17:34 
  
 DENIED
  
 1)AN ENGINEER PRACTICING THROUGH A DULYAUTHORIZED
 ENGINEERING BUSINESS SHALL INDICATE THEIR NAME AND
 LICENSE #, AS WELL AS THE NAME,ADDRESS AND CERTIFICATE
 OF AUTHORIZATION #ON EACH SHEET PER61G15-23.002 (2)
 FAC******IEM SERVICES, INC. CERTIFICATE OF
 AUTHORIZATION NUMBER IS REQUIRED ON EACH SHEETS TITLE
 BLOCK, THE TITLE PAGE OF THE CALCULATIONS AND ON
 LETTERS OR DOCUMENTS BEARING COMPANY LETTERHEAD WITH A
 SIGNATURE AND SEAL*******
  
 2)A DESIGN PROFESSIONAL THAT IS REGISTERED TO
 PRACTICE UNDER CHAPTER 481 OR 471 OF THE FLORIDA
 STATUTES SHALL AFFIX THEIR OFFICIAL SEAL, SIGNATURE AND
 DATE TO SAID DRAWINGS AND SPECIFICATIONS PER 106.1 FBC
 2004. *****PROVIDE INDEX SHEET FOR THE CALCULATION
 SPEC'S LISTING EACH SECTION AND AMOUNT OF PAGES THAT
 BEARS SIGNATURE DATE AND RAISED SEAL OF RESPONSIBLE
 PARTY*******
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status N Date 2008-02-21 Cont ID  
Sent By swurafti Date 2008-02-21 Time 12:03 Rev Time 0.00
Received By swurafti Date 2008-02-21 Time 12:03 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2009-07-10 Cont ID  
Sent By jgomez Date 2009-07-10 Time 09:29 Rev Time 0.00
Received By jgomez Date 2009-07-10 Time 09:28 Sent To  
Notes
2009-07-10 09:29:29SENT TO KEN CONRAD'S DESK.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2008-03-25 Cont ID  
Sent By adarroug Date 2008-03-25 Time 15:11 Rev Time 0.00
Received By adarroug Date 2008-03-25 Time 15:11 Sent To B
Notes
2008-03-25 15:11:46TO "AMORSE" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2008-02-29 Cont ID  
Sent By adarroug Date 2008-02-29 Time 15:10 Rev Time 0.00
Received By adarroug Date 2008-02-29 Time 15:10 Sent To B
Notes
2008-02-29 15:11:33TO "AMORSE" DESK/REV--PLEASE REFERENCE PERMIT#06080915