| 2008-05-05 16:37:52 | GAS PLAN REVIEW: |
| | DENIED 2ND TIME: |
| | |
| | PLAN REVIEW UNDER THE 2004 FLORIDA BUILDING CODES WITH |
| | 2007 REVISIONS, CITY OF WEST PALM BEACH AMENDMENTS TO |
| | CHAPTER 1 (W.P.B.), FLORIDA ADMINISTRATIVE CODE |
| | (F.A.C.), AND FLORIDA STATUTES (F.S.). |
| | |
| | THE FOLLOWING COMMENTS ARE NUMBERED TO CORRESPOND WITH |
| | THE PREVIOUS GAS REVIEW COMMENTS FOR THE PURPOSE OF |
| | CONTINUITY. |
| | |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. PER SECTION 401.1 SCOPE. |
| | **THIS INCLUDES THE EXISTING GAS SYSTEM. SEE PERMIT |
| | INFORMATION INDICATING EXISTING GAS TO SAID ADDRESS |
| | ATTACHED TO THESE COMMENTS. |
| | |
| | **NOTE: THE GAS ISOMETRIC RISER DIAGRAMS BY FLORIDA |
| | PUBLIC UTILITIES CO. PERMIT #08040547 SUBMITTED WITH |
| | THIS GEN/RES PERMIT APPLICATION ARE NOT INDICATING ANY |
| | GAS PIPING TO THE PROPOSED GENERATOR. THE ONLY NEW GAS |
| | PIPING BEING INDICATED IS TO A NEW 99,000 BTU RINNAI. |
| | PLEASE CORRECT THE GAS ISOMETRIC TO INCLUDE THE |
| | PROPOSED GENERATOR. THE GAS ISOMETRIC IS NOT INDICATING |
| | CORRESPONDING LENGTHS TO ALL CUT SECTIONS OF PIPE |
| | PLEASE REFERENCE THE RED CIRCLED YELLOW HIGH LIGHTED |
| | AREAS INDICATING THIS. THE ONLY CORRESPONDING LENGTH TO |
| | CUT SECTION OF PIPE FOR "NEW" WORK IS FOR THE |
| | UNDERGROUND PIPING TO THE RINNAI. WHAT ARE THE |
| | CORRESPONDING LENTHS TO THE ABOVE GROUND CUT SECTIONS |
| | OF PIPE AND THE MISSING GAS PIPE FOR THE PROPOSED |
| | GENERATOR? PER FBC-2004 FUEL GAS SECTION 401.1 SCOPE. |
| | |
| | 2. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. PER FBC-2004 FUEL |
| | GAS SECTION 401.1 SCOPE. |
| | |
| | **NOTE: THE GAS ISOMETRC RISER DIAGRAMS BY FLORIDA |
| | PUBLIC UTILITIES CO. ARE NOT INDICATING THE ABOVE |
| | GROUND PIPING MATERIAL TO THE NEW 99,000 RINNIA AND |
| | THERE IS NO INDICATION FOR GAS PIPING OR MATERIALS FOR |
| | THE PROPOSED GENERATOR. PER FBC-2004 FUEL GAS SECTION |
| | 401.1 SCOPE. |
| | |
| | 3. "OK" COMMENT ADDRESSED. |
| | |
| | 4. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2004 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.6.1 AND TABLES 402.4(1) THRU |
| | 402.4(33). |
| | **THIS INCLUDES THE EXISTING GAS SYSTEM. REFERENCE |
| | COMMENT #1. |
| | |
| | **NOTE: THE GAS ISOMETRIC RISER DIAGRAMS BY FLORIDA |
| | PUBLIC UTILITIES CO. ARE NOT INDICATING THE BTU LOAD |
| | FOR THE PROPOSED GENERATOR. PLEASE REFERENCE COMMENTS |
| | #1 AND 2 AND COMPLY. |
| | |
| | 5. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4). |
| | **THIS INCLUDES THE EXISTING GAS SYSTEM. REFERENCE |
| | COMENT #1. |
| | |
| | **NOTE: PLEASE REFERENCE COMMENT #1, 2 AND 4 AND |
| | COMPLY. |
| | |
| | 6. "OK" COMMENT ADDRESSED. |
| | |
| | 7. SUBMIT MANUFACTURE SHEETS FOR ALL GAS EQUIPMENT TO |
| | VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2. |
| | **PLEASE SUBMIT TWO COPIES OF MANUFACTURER'S |
| | SPECIFICATION SHEETS FOR THE GENERATOR CLEARLY |
| | INDICATING THE MODEL NUMBER, BTU LOAD CAPACITY WITH |
| | GENERATOR RUNNING @ 100%, AND A LISTING FROM A |
| | NATIONALLY RECOGNIZED TESTING LABORATORY. |
| | NOTE: EXISTING GAS SYSTEM WAS LP/GAS, IF GAS TO |
| | PROPOSED GENERATOR IS ALSO LP/GAS PLEASE SUBMIT TWO |
| | COPIES OF MANUFACTURER'S SPECIFICATION SHEETS FOR THE |
| | REQUIRED 2ND STAGE REGULATOR CLEARLY INDICATING THE |
| | MAKE, MODEL NUMBER, BTU LOAD CAPACITY, AND A LISTING |
| | FROM A NATIONALLY RECOGNIZED TESTING LABORATORY. |
| | |
| | **NOTE: THE RESUBMITTED MANUFACTURER'S SPECIFICATION |
| | SHEETS FOR THE PROPOSED GENERATOR ARE NOT CLEARLY |
| | INDICATING THE BTU CAPACITY WITH THE GENERATOR RUNNING |
| | AT 100% AND THERE ARE NOT TWO COPIES OF MANUFACTURER'S |
| | SPECIFICATION SHEETS FOR THE 2ND STAGE REGULATOR BEING |
| | INDICATED ON THE GAS ISOMETRIC WITH THE MAKE, MODEL |
| | NUMBER, BTU LOAD CAPACITY AND A LISTING FROM A |
| | NATIONALLY RECOGNIZED TESTING LABORATORY (NRTL). |
| | |
| | 8. "OK" COMMENT ADDRESSED. |
| | |
| | 9. "OK" COMMENT ADDRESSED. |
| | |
| | 10. "OK" COMMENT ADDRESSED. |
| | |
| | ********IMPORTANT INFORMATION******** |
| | WHEN RESUBMITTING PLANS, PLEASE INDICATE THE REVISION |
| | AND REMOVE & REPLACE ANY PAGES AS NECESSARY. A |
| | TRANSMITTAL LETTER LISTING THE ORIGINAL REVIEW COMMENT |
| | NUMBER, WITH A DESCRIPTION OF THE REVISION MADE, |
| | IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | CHANGES CAN BE FOUND WILL HELP TO EXPEDITE YOUR PERMIT. |
| | THANK YOU FOR YOUR ANTICIPATED COOPERATION. |
| | NOTE: THERE IS ONLY ONE CORRECTED DRAWING |
| | IN RED INK ON THE INDICATED PLAN SHEETS BY THIS PLANS |
| | EXAMINER FOR REFERENCE FOR THE |
| | RESUBMITTAL. |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY: MIKE PERSON |
| | PLUMBING PLANS EXAMINER |
| | PHONE= (561) 805-6730 |
| | FAX= (561) 805-6731 |
| | E-MAIL= [email protected] |