| 2007-11-21 11:17:42 | 2004 FBC W/2007 REVISIONS |
| | ADDITION AND LEVEL 2 ALTERATION |
| | |
| | DENIED BY BUILDING |
| | |
| | 1) IMPACT FEES MUST BE PAID TO PALM |
| | BEACH COUNTY, PLANS STAMPED BY THEM AND |
| | COPY OF RECEIPT SUBMITTED TO CITY OF |
| | WEST PALM BEACH BUILDING DEPARTMENT, |
| | BEFORE A BUILDING PERMIT CAN BE ISSUED. |
| | |
| | 2) " WHITE-OUT" ONPLANS IS NOT ACCEPTABLE. SEE FBC* |
| | 106.1.3 CITY AMENDMENTS AND FS 471. |
| | |
| | 3) THE PERMIT APPLICATION INDICATES THAT THIS PROJECT |
| | IS TO BE DONE IN PHASES. THE FIRST FLOOR ADDITION BEING |
| | PHASE ONE AND A SECOND STORY TO BE PHASE TWO. THE PLANS |
| | WILL NEED TO BE RE-DRAWN SHOWING ONLY THE FIRST FLOOR |
| | WITH THE ROOF ABOVE IT. THE ELEVATIONS AND OTHER |
| | DRAWINGS SHOULD SHOW THE ONE STORY STRUCTURE WITH NOTES |
| | INDICATING FUTURE SECOND STORY. SEE FBC* 106.1.1 CITY |
| | AMENDMENTS. |
| | |
| | 4) THE DESIGN PARAMETERS ON SHEET 4.1 SPECIFIES THE |
| | WIND EXPOSURE CATEGORY AS C AND THE COMPONENT AND |
| | CLADDING TABLE PRESSURES ON SHEET 7 ARE FOR EXPOSURE B. |
| | PLEASE CORRECT. SEE FBC R301.2.1.4 AND TABLE |
| | R301.2(2). |
| | |
| | 5) SPECIFY SAFETY GLAZING IN THE BATHROOM WINDOWS AS |
| | REQUIRED BY FBC R308.3. |
| | |
| | 6) SPECIFY THE HEIGHT OF THE LOW PARAPET WALLS ON THE |
| | PLANS. FBC* 106.1.1 CITY AMENDMENTS |
| | |
| | 7) ON SHEET 6.1, NUMBER 22 ON THE CONNECTOR SCHEDULE IS |
| | SPECIFIED AS A SIMPSON LUS 10. IS THIS SUPPOSE TO BE A |
| | LUS 210? PLEASE CLARIFY. |
| | |
| | 8) THE SPACING FOR THE VERTICAL REINFORCING BARS FOR |
| | THE FIRST FLOOR ON SHEET 3.1 IS NOT ADEQUATE. PLEASE |
| | REVIEW AND CORRECT. SEE FBC R 609.3. |
| | |
| | 9) SPECIFY THE LOCATIONS AND SIZE OF VERTICAL |
| | REINFORCING BARS FOR THE SECOND FLOOR WALLS AND THE |
| | PARAPET WALLS. SEE FBC* 106.1.1 CITY AMENDMENTS AND FBC |
| | R 609.3. |
| | |
| | 10) SHOW COMPLIANCE WITH R806.1 VENTILATION REQUIRED. |
| | ENCLOSED ATTICS AND ENCLOSED RAFTER SPACES FORMED WHERE |
| | CEILINGS ARE APPLIED DIRECTLY TO THE UNDERSIDE OF ROOF |
| | RAFTERS SHALL HAVE CROSS VENTILATION FOR EACH SEPARATE |
| | SPACE BY VENTILATING OPENINGS PROTECTED AGAINST THE |
| | ENTRANCE OF RAIN. VENTILATING OPENINGS SHALL BE |
| | PROVIDED WITH CORROSION-RESISTANT WIRE MESH, WITH 1 / 8 |
| | INCH (3.2 MM) MINIMUM TO 1/4 INCH (6.4 MM) MAXIMUM |
| | OPENINGS. |
| | |
| | 11) THE ROOF SHEATHING NAILING AT THE BOTTOM OF THE |
| | CONNECTOR SCHEDULE ON SHEET 6.1 IS INCORRECT AND DOES |
| | NOT CORRESPOND TO FASTENING SPECIFIED ELSEWHERE ON THIS |
| | SHEET. SEE FBC R803.2.3.1. |
| | |
| | 12) PROVIDE A DETAIL OF THE STEEL COLUMN SHOWN AT THE |
| | CORNER OF THE WINDOW OPENINGS AT THE SECOND FLOOR |
| | MASTER BEDROOM. SEE FBC* 106.1.1 CITY AMENDMENTS. |
| | |
| | 13) ON SHEET 8.1 AN ELEVATION OF 20'-4" IS SPECIFIED AS |
| | THE T.O. BEAM AND IT APPEARS TO BE THE BOTTOM OF THE |
| | BEAM. PLEASE CLARIFY. |
| | |
| | 14) SPECIFY THE LINTELS ABOVE THE SECOND FLOOR WINDOWS. |
| | SEE FBC* 106.1.1 CITY AMENDMENTS. |
| | |
| | 15) PLEASE REMOVE THE EXTERIOR BEARING WALL DETAIL 5 ON |
| | 8.2 WHICH DOES NOT APPLY TO THIS PROJECT. |
| | |
| | 16) SECTION 1 ON 6.1 REFERS TO DETAIL #12 ON SHEET 6.2. |
| | HOWEVER, THERE WAS NO SHEET 6.2 SUBMITTED. |
| | |
| | 17) SUBMIT TWO COPIES OF THE ENERGY CALCULATIONS THAT |
| | HAVE BEEN SIGNED AND DATED BY THE PREPARER AND |
| | OWNER/AGENT AS REQUIRED BY FBC CHAPTER 13.101.2. |
| | |
| | 18) THE ENERGY CALC. FORM LISTS THE EXTERIOR CONCRETE |
| | WALL INSULATION AS R-5 AND SECTION 1 ON 8.1 SPECIFIES |
| | R-4.2 INSULATION. PLEASE CORRECT. |
| | |
| | 19) THE CONDITIONED SPACE ON THE ENERGY CALC. FORM |
| | LISTS 2363 SQFT AND THE PLANS SPECIFY 2358 SQFT. PLEASE |
| | CORRECT. |
| | |
| | 20)PRODUCT APPROVALS SUBMITTED WITH PERMIT |
| | APPLICATION AFTER OCTOBER 1, 2003 ARE REQUIRED TO |
| | COMPLY WITH THE FLORIDA PRODUCT APPROVAL SYSTEM. FOR |
| | INFORMATION PLEASE SEE THE STATE WEBSITE AT |
| | WWW.FLORIDABUILDING.ORG. PRODUCTS WITH STATEWIDE |
| | APPROVAL ARE REQUIRED TO BE SUBMITTED WITH A COVER |
| | SHEET THAT LISTS THE PRODUCT IDENTITY NUMBER FROM THE |
| | STATE. SEE FAC RULE 9B-72. SUBMIT PRODUCT APPROVALS FOR |
| | THE INSWING AND OUTSWING EXTERIOR DOORS, WINDOW |
| | MULLIONS AND ROOFING MATERIAL. |
| | |
| | 21) FBC *106.3 CITY AMENDMENTS. PRODUCT APPROVALS. |
| | THOSE PRODUCT WHICH ARE REGULATED BY DCA RULE 9B-72 |
| | SHALL BE REVIEWED AND APPROVED IN WRITING BY THE |
| | DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR |
| | JURISDICTIONAL APPROVAL. |
| | |
| | 22)FBC 1606.1.4SHUTTERS. |
| | INSTALLATION/DESIGN INFORMATION |
| | REQUIRED.SUBMIT AN INSTALLATION |
| | SCHEDULE INCLUDING THE FOLLOWING |
| | DETAILS: |
| | (A) BUILDING CONSTRUCTION TYPE (EG CBS) |
| | (B) BUILDING (OR INSTALLATION) HEIGHT |
| | (C) DESIGN PRESSURE FOR EACH OPENING |
| | (D) OPENING SIZES |
| | (E) SHUTTER SPAN (VERTICAL/HORIZONTAL?) |
| | (F) ANCHOR TYPE, SIZE AND SPACING |
| | A FORM IS AVAILABLE FROM THIS OFFICE |
| | GIVING THE RECOMMENDED INSTALLATION |
| | SCHEDULE FORMAT.SUBMIT THE ABOVE |
| | INFORMATION WHICH IS REQUIRED FOR |
| | REVIEW. |
| | |
| | 23) SHOW COMPLIANCE WITH R310.4. THE TEMPORARY |
| | INSTALLATION OR CLOSURE OF STORM SHUTTERS, PANELS, AND |
| | OTHER APPROVED HURRICANE PROTECTION DEVICES SHALL BE |
| | PERMITTED ON EMERGENCY ESCAPE AND RESCUE OPENINGS |
| | DURING THE THREAT OF A STORM. SUCH DEVICES SHALL NOT BE |
| | REQUIRED TO COMPLY WITH THE OPERATIONAL CONSTRAINTS OF |
| | SECTION R310.1.4 . WHILE SUCH PROTECTION IS PROVIDED, |
| | AT LEAST ONE MEANS OF ESCAPE FROM THE DWELLING OR |
| | DWELLING UNIT SHALL BE PROVIDED. THE MEANS OF ESCAPE |
| | SHALL BE WITHIN THE FIRST FLOOR OF THE DWELLING OR |
| | DWELLING UNIT AND SHALL NOT BE LOCATED WITHIN A GARAGE |
| | WITHOUT A SIDE HINGED DOOR LEADING DIRECTLY TO THE |
| | EXTERIOR. OCCUPANTS IN ANY PART OF THE DWELLING OR |
| | DWELLING UNIT SHALL BE ABLE TO ACCESS THE MEANS OF |
| | ESCAPE WITHOUT PASSING THROUGH A LOCKABLE DOOR NOT |
| | UNDER THEIR CONTROL. |
| | |
| | ROBERT MCDOUGAL |