| 2007-10-26 13:35:59 | DENIED |
| | REFERENCE: |
| | ** FBC-2004 WITH 05 & 06 REVISIONS, FUEL GAS. |
| | ** THE CITY OF WEST PALM BEACH GAS PERMIT APPLICATION |
| | REQUIREMENTS. |
| | ** FBC-2004 CHAPTER 1, THE CITY OF |
| | WEST PALM BEACH AMENDMENTS. |
| | ** FLORIDA ADMINISTRATIVE CODE (FAC). |
| | ** FLORIDA STATUTES (FS). |
| | |
| | THE FOLLOWING CORRECTIONS/INFORMATION ARE REQUIRED FOR |
| | GAS/PLUMBING PLAN REVIEW TO MEET CODE COMPLIANCE: |
| | |
| | 1. PROVIDE TWO COPIES OF A SITE PLAN OR SURVEY THAT |
| | CLEARLY INDICATES THE PROPOSED LOCATION OF THE |
| | GENERATOR INDICATING ALL DIMENSIONS FROM PROPERTY LINES |
| | AND DISTANCES FROM ADJACENT DWELLING STRUCTURES. |
| | |
| | 2. PROVIDE MANUFACTURER'S SPECIFICATIONS FOR THE |
| | PROPOSED GENERATOR INDICATING RECOMMENDED SET BACKS |
| | FROM STRUCTURES. |
| | |
| | 3. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. |
| | **NOTE: THE ONLY CORRESPONDING LENGTH INDICATED ON THE |
| | DRAWING IS FOR THE 25' OF UNDERGROUND 1/2" PE PIPING. |
| | WHAT ARE THE CORRESPONDING LENGTHS TO THE ABOVE GROUND |
| | PIPING? WHERE IS THE 1ST STAGE REGULATOR AT THE TANK |
| | AND ITS MODEL NUMBER ON THE ISOMETRIC DRAWING? PLEASE |
| | CLEARLY INDICATE THESE ITEMS ON THE RESUBMITTED |
| | ISOMETRIC. |
| | |
| | 4. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. |
| | **NOTE: THE ONLY PIPING MATERIAL INDICATED ON THE |
| | DRAWING IS FOR THE UNDERGROUND PE PIPING. WHAT IS THE |
| | PIPING MATERIAL FOR THE ABOVE GROUNDGAS PIPE? PLEASE |
| | CLEARLY INDICATE THIS ON THE RESUBMITTED ISOMETRIC. |
| | |
| | 5. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2. |
| | **NOTE: THE SUBMITTED MANUFACTURER SPECIFICATION SHEETS |
| | FOR THE 2ND STAGE REGULATOR DOES NOT INDIDATE THE MAKE, |
| | MODEL NUMBER DOES NOT MATCH REGULATOR ON DRAWING, AND |
| | DOES NOT INDICATE A LISTING FROM A NATIONALLY |
| | RECOGNIZED TESTING LABORATORY. PLEASE INDICATE THESE |
| | REQUIREMENTS ON THE RESUBMITTAL AS WELL AS FOR THE |
| | REQUIRED 1ST STAGE REGULATOR AT THE TANK. |
| | |
| | 6. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | **NOTE: THE SUBMITTED SURVEY ARE NOT LEGIBLE, PLEASE |
| | PROVIDE TWO (2) COPIES OF A CURRENT, LEGIBLE SURVEY OR |
| | SITE PLAN SHOWING THE LOCATION OF THE PROPOSED 500 GAL |
| | U/G LP TANK CLEARLY INDICATING THE ABOVE REQUIRED |
| | INFORMATION. PER 106.1.2, ADDITIONAL INFORMATION |
| | REQUIRED. |
| | |
| | 7. INDICATE HOW THE U/G TANK SHALL BE SECURLY ANCHORED |
| | PER NFPA 58 SECTION 6.6.1. |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY: MIKE PERSON |
| | PLUMBING PLANS EXAMINER |
| | (561) 805-6730 |
| | FAX (561) 805-6731 |
| | E-MAIL: [email protected] |