| 2007-06-28 14:39:05 | DENIED |
| | REFERENCE: |
| | ** FBC-2004 FUEL GAS. |
| | ** THE CITY OF WEST PALM BEACH GAS PERMIT APPLICATION |
| | REQUIREMENTS. |
| | ** FBC-2004 CHAPTER 1, THE CITY OF |
| | WEST PALM BEACH AMENDMENTS. |
| | ** FLORIDA ADMINISTRATIVE CODE. |
| | ** FLORIDA STATUTES. |
| | |
| | THE FOLLOWING CORRECTIONS/INFORMATION ARE REQUIRED FOR |
| | GAS PLAN REVIEW TO MEET CODE COMPLIANCE: |
| | |
| | 1. VALUE APPEARS TO BE TO LOW FOR THE PROPOSED |
| | GENERATOR: |
| | PER FBC-2004, CHAPTER 1, SECTION |
| | 108.3, BUILDING PERMIT VALUATION: IF IN |
| | THE OPINION OF THE BUILDING OFFICIAL, |
| | THE CLAIMED VALUATION OF THE BUILDING, |
| | ALTERATION, STRUCTURE, ELECTRICAL, GAS |
| | MECHANICAL OR PLUMBING SYSTEMS APPEARS |
| | TO BE UNDERESTIMATED ON THE APPLICATION, |
| | THE PERMIT SHALL BE DENIED. FOR |
| | PERMITTING PURPOSES, VALUATION OF |
| | BUILDINGS AND SYSTEMS SHALL BE TOTAL |
| | REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR |
| | FINISH, NORMAL SITE WORK (EXCAVATION AND |
| | BACKFILL FOR BUILDINGS), ARCHITECTURAL |
| | AND DESIGN FEES, MARKETING COSTS, |
| | OVERHEAD AND PROFIT; EXCLUDING ONLY LAND |
| | VALUE. VALUATION REFERENCES MAY INCLUDE |
| | THE LATEST PUBLISHED DATA OF NATIONAL |
| | CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL-SWIFT, |
| | MEANS ECT.) WITH |
| | REGIONAL ADJUSTMENTS FOR LOCATION AS |
| | PUBLISHED BY INTERNATIONAL CODE |
| | CONGRESS. |
| | |
| | 2. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. |
| | NOTE: THE SUBMITTED DRAWING IS NOT AN ISOMETRIC AND |
| | DOES NOT SHOW ALL CUT SECTIONS AND CORRESPONDING |
| | LENGTHS. THIS INCLUDES THE EXISTING GAS SYSTEM, PLEASE |
| | REFERENCE THE PERMIT INFORMATION ATTACHED TO THE GAS |
| | COMMENTS THAT INDICATES EXISTING GAS TO A DRYER AND |
| | WATER HEATER. PLEASE CLEARLY INDICATE ON THE |
| | RESUBMITTED ISOMETRIC THE EXISTING GAS PIPE AND THE |
| | PROPOSED GAS PIPE TO THE GENERATOR. |
| | |
| | 3. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. |
| | |
| | 4. PLEASE INDICATE THE TYPE OF GAS, (LP OR NATURAL) ON |
| | THE RESUBMITTED ISOMETRIC. |
| | |
| | 5. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2004 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.6.1 AND TABLES 402.4(1) THRU |
| | 402.4(33). |
| | NOTE: THIS INCLUDES THE EXISTING GAS SYSTEM. |
| | |
| | 6. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4). |
| | NOTE: THIS INCLUDES THE EXISTING GAS SYSTEM. |
| | |
| | 7. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2004 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | LP GAS 10 PSI WITH 0.5 TO APPLIANCES. |
| | |
| | 8. SUBMIT MANUFACTURE SHEETS FOR ALL GAS EQUIPMENT TO |
| | VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2004 FUEL GAS CODE SEC 402.2. |
| | A} GENERATOR (WITH BTU LOAD OF GENERATOR). PLEASE |
| | INCLUDE MANUFACTURER'S INSTALLATION INSTRUCTIONS WITH |
| | INFORMATION ON SETBACKS TO STRUCTURES. |
| | B} 1ST AND 2ND STAGE REGULATORS, WITH THE MAKE, |
| | MODEL NUMBER, LOAD CAPACITY, AND A LISTING FROM A |
| | NATIONALLY RECOGNIZED TESTING LABORATORY (NRTL). |
| | |
| | 9. CLEARLY SHOW THE LOCATION AND CAPACITY OF LP TANKS, |
| | TYPE OF TANK (DOT OR ASME), THE DISTANCE OF THE TANK |
| | FROM THE BUILDING AND ADJACENT PROPERTY LINES THE |
| | DISTANCE OF THE TANK FROM ALL SOURCES OF IGNITION, |
| | OTHER CONTAINERS, BUILDINGS, AND THE LOCATION OF ANY |
| | BUILDING OPENINGS BELOW THE RELIEF VALVE OF THE TANK |
| | PER NFPA 58, TABLE 3-2.2.2. |
| | |
| | 10. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES |
| | PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 6.6.1, 6.6.16, AND 6.6.2.1. |
| | |
| | 11. NOTE: PLEASE REFERENCE ZONING COMMENT#1 AND |
| | CLEARLY INDICATE THE PROPOSED GENERATORS LOCATION ON |
| | TWO COPIES OF A SITE PLAN INDICATING ALL DEMENSIONS |
| | FROM PROPERTY LINES AND DISTANCES FROM ADJACENT |
| | DWELLING STRUCTURES. |
| | |
| | 12. FBC-2004 CHAPTER 1,SECTION 106.3.4.3: |
| | THE PERSON RESPONSIBLE FOR THE DESIGN OF |
| | THE DRAWING SHALL CLEARLY PRINT AND SIGN |
| | NAME, AND ALSO DATE DRAWING. PLEASE DO |
| | THIS ON ALL RESUBMITTED DRAWINGS PRIOR TO |
| | RESUBMITTING. |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY MIKE PERSON |
| | PLUMBING PLANS EXAMINER |
| | (561) 805-6730 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | UNDER SUPERVISION OF K.STEVENS |
| | (561) 805-6721 |