| 2007-03-24 15:37:23 | ------------------------DENIED------------------------- |
| | -- |
| | |
| | FBC 2004 W/ 2006 REVISIONS |
| | FBC,M 2004 W/ 2006 REVISIONS |
| | FBC 2004 CHAPTER 1 AS AMENDED BY THE CITY OF WEST PALM |
| | BEACH |
| | |
| | 1. M0.1 MECHANICAL NOTES : PLEASE REFERENCE FBC 2004 W/ |
| | 2006 REVISIONS. ALSO, PLEASE UPDATE ALL REFERENCED |
| | STANDARDS TO THOSE LISTED IN FBC 2004. |
| | |
| | 2. M0.1 MECHANICAL NOTE #5: WHAT IS THE MEANS TO BE |
| | USED FOR CERTIFICATION OF EXISTING DUCT MOUNTED SMOKE |
| | DETECTORS? |
| | |
| | 3. M4.1 PLEASE SEE MANUFACTURER'S INSTALLATION |
| | INSTRUCTIONS FOR MINIMUM REQUIREMENTS FOR SERVICE |
| | ACCESS PER FBC.M 304.1,304.2. EXAMPLE: AHU 3, AHU 12 |
| | BOTH REQUIRE MIN. 71" ON COIL CONNECTION SIDE OF UNIT |
| | AND 24" MIN. ON OPPOSITE SIDE. PLAN SHOWS APPROX. 48" |
| | ON COIL SIDE AND 12" ON OPPOSITE SIDE FOR AHU 12. THIS |
| | UNIT, ONCE IN PLACE, WOULD NOT BE SERVICABLE. MINIMUM |
| | SERVICE CLEARANCE FROM ELEMENTS OF PERMANENT |
| | CONSTRUCTION, INCLUDING OTHER INSTALLED EQUIPMENT, IS |
| | REQUIRED PER FBC,M 306.1. |
| | |
| | 4. M2.2 GENERAL NOTE #5: ELIMINATING THE OPENING USED |
| | FOR INSTALLATION OF EQUIPMENT WITH ELEMENTS OF |
| | PERMANENT CONSTRUCTION, IF IT IS THE ONLY MEANS OF |
| | ACCESS FOR REPLACEMENT, IS NOT PERMITTED PER FBC,M |
| | 306.1. |
| | |
| | 5. M2.2 AHU 11: CHECK FOR CLEARANCE FOR SERVICE AND |
| | MAINTENANCE. SEE COMMENT #3. |
| | |
| | 6. M4.1 VAV 2 DOES NOT APPEAR TO HAVE THE MINIMUM |
| | REQUIRED CLEARANCE. |
| | |
| | 7. M6.1 FIRE DAMPER DETAIL: (A) FIRE DAMPERS TO BE |
| | INSTALLED PER THEIR LISTING AND MANUFACTURER'S |
| | INSTALLATION INSTRUCTIONS FBC,M 607.2.(B)FIRE DAMPER |
| | ACTUATING DEVICE OPERATING TEMPERATURE TO BE |
| | APPROXIMATELY 50 DEG.F ABOVE THE NORMAL TEMPERATURE |
| | WITHIN THE DUCT SYSTEM, BUT NOT LESS THAN 160 DEG.F PER |
| | FBC,M 607.3.1.1. WHAT WILL BE THE NORMAL TEMPERATURE BE |
| | WITHIN THE DUCT SYSTEM? |
| | |
| | 8. M6.1. PLEASE PROVIDE DETAILED DRAWINGS FROM A |
| | STRUCTURAL ENGINEER SHOWING WIND LOAD CALCULATIONS, |
| | VERIFYING EQUIPMENT AND CURB CONNECTIONS TO BE IN |
| | COMPLIANCE WITH FBC CH 16. ALSO, SHOW STRUCTURAL |
| | ELEMENTS INVOLVED IN CREATING NEW PENETRATIONS/LOAD |
| | BEARING FOR NEW EQUIPMENT ON ROOF FOR BUILDING PLAN |
| | REVIEW. |
| | |
| | 9. PLEASE PROVIDE MANUFACTURER'S SUBMITTAL DATA FOR |
| | OARTU-1. A SEPARATE GAS PERMIT WILL BE REQUIRED FOR |
| | OARTU-1 GAS PIPING. |
| | |
| | 10. PLEASE SHOW MEANS OF AUXILIARY OR SECONDARY DRAIN |
| | PROTECTION FOR ALL NEW AHUS AND OARTU-1 PER FBC,M |
| | 307.2.3. |
| | |
| | PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS. |
| | |
| | REVIEWED BY: |
| | RONALD J REGUEIRO |
| | 561.805.6719 |
| | [email protected] |
| | |