Plan Review Details - Permit 07030225
| Plan Review Stops For Permit 07030225 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2007-04-03 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2007-04-02 |
Time |
11:47 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2007-04-02 |
Time |
11:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2007-03-29 |
|
|
Cont ID |
|
| Sent By |
kconrad |
Date |
2007-03-29 |
Time |
14:56 |
Rev Time |
0.00 |
| Received By |
kconrad |
Date |
2007-03-29 |
Time |
14:45 |
Sent To |
|
|
| Notes |
| 2007-03-29 14:53:35 | MET WITH ROOFER TO PERFORM A PREINSPECT. THE ROOFING | | | SUBSTRATE IS CONCRETE AND THERE ARE TWO ROOFING | | | APPLICATIONS IN PLACE AS VERIFIED BY A ROOFING CORE. AS | | | PER THE FEBC SECTION 511.3, EXCEPTION #2 AND #3, IT IS | | | ACCEPTABLE TO REMOVE THE LAST ROOFING APPLICATION AND | | | INSTALL A SINGLE PLY ROOFING MEMBRANE. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2007-03-06 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2007-03-06 |
Time |
18:56 |
Rev Time |
0.50 |
| Received By |
jgomez |
Date |
2007-03-06 |
Time |
18:27 |
Sent To |
|
|
| Notes |
| 2007-03-06 19:00:53 | BUILDING REVIEW CHECKLIST: | | | 1- ROOFOVER PERMIT APPLICATIONS REQUIRES PRE-INSPECTION | | | BY BUILDING INSPECTOR TO VERIFY ROOF CONDITIONS. | | | APPLICATION SENT TO KEN CONRAD, CHIEF BUILDING | | | INSPECTOR FOR PRE-INSPECTION. | | | | | | 2- PROVIDE PRODUCT APPROVAL FOR RECOVER ROOFING | | | APPLICATION AS REQUIRED BY DCA RULE 9B-72. | | | | | | 3- SEPARATE PERMITS ARE REQUIRED IF REMOVING ROOF | | | EQUIPMENT. | | | | | | 4- ENGINEER CALCULATIONS SUBMITTED: | | | A) CALCULATIONS WILL NEED TO BE REVISED TO ADDRESS | | | SPECIFIC PROPOSED ASSEMBLY MARKED ON NEW ROOF RECOVERY | | | PRODUCT APPROVAL. | | | | | | B) ENGINEER TO PROVIDE RAS 117 CALCULATIONS AS | | | REQUIRED BY GENERAL LIMITATION #7 WHEN SELECTED | | | ASSEMBLY IS LIMITED BY THIS LIMITATION. | | | | | | C) ENGINEER TO USE SAME LANGUAGE USED IN PRODUCT | | | APPROVAL TO AVOID CONFLICTS.EG: SPECIFY MEMBRANE WITH | | | TABS USED: 28", 60", ETC. SEE PRODUCT APPROVAL. | | | | | | D) ENGINEER TO DATE CALCULATIONS WHEN SIGNING AND | | | SEALING THEM. | | | | | | 5- PLEASE DON'T USE HIGH VELOCITY HURRICANE ZONES | | | UNIFORM PERMIT APPLICATION.THAT INFORMATION DOESN'T | | | APPLY TO THIS MUNICIPALITY. | | | | | | JULIO GOMEZ | | | BUILDING PLANS EXAMINER | | | (561)805-6712 |
|
|
|