Plan Review Details - Permit 07020617
Plan Review Stops For Permit 07020617
Review Stop G GAS REVIEW
Rev No 1 Status P Date 2007-03-01 Cont ID  
Sent By mperson Date 2007-03-01 Time 14:08 Rev Time 0.45
Received By mperson Date 2007-03-01 Time 14:08 Sent To PC
Notes
2007-03-01 14:32:37****************PROVISO****************
 A} PER FBC-2004 FUEL GAS, SECTION 404.7 ABOVE-GROUND
 PIPING: ALL PIPING INSTALLED OUTDOORS SHALL BE ELEVATED
 NOT LESS THAN 3-1/2" ABOVE-GROUND.
 B} PER FBC-2004 FUEL GAS, SECTION 408.4 SEDIMENT TRAP:
 A SEDIMENT TRAP SHALL BE INSTALLED DOWNSTREAM OF THE
 EQUIPMENT SHUOFF VALVE AS CLOSE TO THE INLET OF THE
 EQUIPMENT AS PRACTICAL.
 C}PER FBC-2004 FUEL GAS, SECTION 409.5 EQUIPMENT
 SHUTOFF VALVE: EACH APPLIANCE SHALL BE PROVIDED WITH A
 SHUTOFF VALVE SEPERATE FROM THE APPLIANCE, NOT FURTHER
 THAN 6' FROM THE APPLIANCE, AND SHALL BE INSTALLED
 UPSTREAM FROM THE UNION. SHUTOFF VALVES SHALL BE
 PROVIDED WITH ACCESS.
 D} PER FBC-2004 FUEL GAS, SECTION 415: PIPING SHALL BE
 SUPPORTED PER TABLE 415.1. NOTE, 1-1/4" STEEL PIPE
 HORIZONTAL SPACING OF SUPPORTS MINIMUM OF 10'.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2007-03-01 Cont ID  
Sent By mperson Date 2007-03-01 Time 14:40 Rev Time 0.00
Received By mperson Date 2007-02-26 Time 08:32 Sent To  
Notes
2007-02-26 08:32:32TO "G" BOX