| Plan Review Stops For Permit 07011349 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2007-02-16 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2007-02-16 |
Time |
11:33 |
Rev Time |
0.50 |
| Received By |
jgomez |
Date |
2007-02-16 |
Time |
11:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2007-02-15 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2007-02-15 |
Time |
18:42 |
Rev Time |
1.00 |
| Received By |
jgomez |
Date |
2007-02-15 |
Time |
18:42 |
Sent To |
|
|
| Notes |
| 2007-02-15 18:55:50 | BUILDING REVIEW CHECKLIST: | | | 1-INSTALLATION SCHEDULE CALLS FOR SHUTTERS TO BE | | | MOUNTED IN CONCRETE.THIS IS A CONCRETE BLOCK HOUSE, | | | NOT CONCRETE HOUSE, THEREFORE NEED TO USE THE ANCHOR | | | TYPE AND SPACING DESIGNED FOR CONCRETE BLOCK. REVISE AS | | | REQUIRED. | | | | | | 2- INDICATE ANCHOR SPACING INALLOPENINGS OF THE | | | INSTALLATION SCHEDULE PROVIDED. SOME OPENINGS DON'T | | | INDICATE THE ANCHOR SPACING. | | | | | | 3- INSTALLATION SCHEDULE CALLS FOR 1/4" ELCO ANCHORS AT | | | 7"O.C. FOR ALL OPENINGS, WHILE ANCHOR SCHEDULE ON SHEET | | | 4 OF DRAWING 05-417ANCHOR SPACING IS CIRCLED AT 4" | | | AND 7". CLARIFY/REVISE AS REQUIRED TO MATCH. | | | | | | JULIO GOMEZ | | | BUILDING PLANS EXAMINER | | | (561)805-6712. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2007-02-15 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2007-02-15 |
Time |
18:55 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2007-02-02 |
Time |
11:01 |
Sent To |
|
|
| Notes |
| 2007-02-02 11:03:10 | TO "JGOMEZ" DESK/PER "RBROWN" |
|
|
|