| 2007-02-07 09:37:39 | DENIED |
| | REFERENCE: FBC-2004 FUEL GAS; CITY OF WEST PALM BEACH |
| | AMENDMENTS TO FBC-2004 CHAPTER 1; FLORIDA STATUTES; |
| | |
| | THE FOLLOWING CORRECTIONS ARE REQUIRED FOR GAS PLAN |
| | REVIEW TO MEET CODE COMPLIANCE: |
| | |
| | 1. PERMIT APPLICATION IS INCOMPLETE, PER FBC-2004 |
| | CHAPTER 1, SECTION 105.3 AND FLORIDA STATUTES |
| | 713.135(6) SIGNATURE OF CONTRACTOR REQUIRED. PLEASE |
| | REFREENCE THE ATTACHED FLORIDA STATUTE INDICATING |
| | THIS. |
| | |
| | 2. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. |
| | NOTE: THIS INCLUDES THE EXISTING SYSTEM. |
| | |
| | 3. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. |
| | NOTE: THIS INCLUDES THE EXISTING SYSTEM. |
| | |
| | 4. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2004 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.6.1 AND TABLES 402.4(1) THRU |
| | 402.4(33). |
| | NOTE: THIS INCLUDES THE EXISTING SYSTEM. |
| | |
| | 5. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY (EXISTING 2ND STAGE REGULATOR) TO THE MOST |
| | REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2004 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES A.3.1(4). |
| | NOTE: THIS INCLUDES THE EXISTING SYSTEM. |
| | |
| | 6. FBC-2004 CHAPTER 1,SECTION 106.3.4.2: |
| | THE PERSON RESPONSIBLE FOR THE DESIGN OF |
| | THE DRAWING SHALL CLEARLY PRINT AND SIGN |
| | NAME, AND ALSO DATE DRAWING. PLEASE DO |
| | THIS PRIOR TO RESUBMITTING. |
| | |
| | 7. PER FBC-2004, CHAPTER 1, SECTION |
| | 108.3, BUILDING PERMIT VALUATION: IF IN |
| | THE OPINION OF THE BUILDING OFFICIAL, |
| | THE CLAIMED VALUATION OF THE BUILDING, |
| | ALTERATION, STRUCTURE, ELECTRICAL, GAS |
| | MECHANICAL OR PLUMBING SYSTEMS APPEARS |
| | TO BE UNDERESTIMATED ON THE APPLICATION, |
| | THE PERMIT SHALL BE DENIED. FOR |
| | PERMITTING PURPOSES, VALUATION OF |
| | BUILDINGS AND SYSTEMS SHALL BE TOTAL |
| | REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR |
| | FINISH, NORMAL SITE WORK (EXCAVATION AND |
| | BACKFILL FOR BUILDINGS), ARCHITECTURAL |
| | AND DESIGN FEES, MARKETING COSTS, |
| | OVERHEAD AND PROFIT; EXCLUDING ONLY LAND |
| | VALUE. VALUATION REFERENCES MAY INCLUDE |
| | THE LATEST PUBLISHED DATA OF NATIONAL |
| | CONSTRUCTION COST ANALYSIS SERVICES (MARSHALL-SWIFT, |
| | MEANS ECT.) WITH |
| | REGIONAL ADJUSTMENTS FOR LOCATION AS |
| | PUBLISHED BY INTERNATIONAL CODE |
| | CONGRESS. |
| | NOTE: VALUE INCLUDES THE NEW RANGE ALONG WITH THE GAS |
| | PIPING. PLEASE SUBMIT COPY OF SIGNED CONTRACT TO |
| | VERIFY. PLEASE ADJUST AND RESUBMIT. |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY MIKE PERSON |
| | (561) 805-6730 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | UNDER SUPERVISION OF K.STEVENS |
| | (561) 805-6721 |
| | |
| | |
| | |