Plan Review Details - Permit 07010777
Plan Review Stops For Permit 07010777
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2007-01-16 Cont ID  
Sent By jgomez Date 2007-01-16 Time 15:12 Rev Time 0.50
Received By jgomez Date 2007-01-16 Time 15:12 Sent To  
Notes
2007-01-16 15:13:49BUILDING REVIEW PROVISO:
 1- IFMECHANICAL EQUIPMENT IS ON THE ROOF, THEN
 ADDITIONAL MECHANICAL PERMIT IS REQUIRED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2007-01-12 Cont ID  
Sent By jgomez Date 2007-01-12 Time 17:31 Rev Time 0.75
Received By jgomez Date 2007-01-12 Time 17:31 Sent To  
Notes
2007-01-12 17:41:46BUILDING REVIEW CHECKLIST:
 1- NEED RECORDED NOTICE OF COMMENCEMENT AS REQUIRED BY
 SEC. 713.13 FLORIDA STATUTES.
  
 2- SELECTED ASSEMBLY ON PAGE 32 OF NOA #03-0827.02
 SUBMITTED CAN'T BE INSTALLED IN THIS AREA.ASSEMBLY IS
 LIMITED BY GENERAL LIMITATION #9 WHICH DOESN'T ALLOW
 NAIL ENHANCING TO INCREASE THE DESIGN PRESSURES OF THE
 ASSEMBLY. SEE GENERAL LIMITATION #9 ON PAGE 40 OF NOA.
  
  
 3. NEED ASSEMBLY WITH GENERAL LIMITATION #7 WHICH
 ALLOWS FOR NAIL ENHANCING AT PERIMETER AND CORNER
 AREAS. CALCULATIONS NEED TO BESIGNED AND SEALED BY
 ARCHITECT, ENGINEER OR REGISTERED ROOF CONSULTANT AS
 REQUIRED BY GENERAL LIMITATION #7. SEE PAGE #40.
  
 4- IF SELECTED ASSEMBLY HAVE MORE THAN ONE FASTENING
 OPTION, THEN, CLEARLY IDENTIFY WHICH FASTENING OPTION
 WILL BE INSTALLED. SEE CITY POLICY FOR ROOFING
 PERMITS.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved