Plan Review Details - Permit 06110590
Plan Review Stops For Permit 06110590
Review Stop B BUILDING (STRUCTURAL)
Rev No 8 Status P Date 2009-05-14 Cont ID  
Sent By lmartine Date 2009-05-14 Time 11:00 Rev Time 0.00
Received By lmartine Date 2009-05-14 Time 11:00 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 7 Status F Date 2008-03-14 Cont ID  
Sent By lmartine Date 2008-03-14 Time 12:19 Rev Time 0.00
Received By lmartine Date 2008-03-14 Time 10:53 Sent To  
Notes
2008-03-14 12:30:01BUILDING REVIEW COMMENTS
  
  
 ALL NEW MECHANICAL EQUIPMENT SHALL BE INSTALLED AT THE
 MINIMUM ELEVATION OF 7.5' IN FLOOD ZONE A-5. THE
 ELEVATION CERTIFICATE PROVIDED LISTS THE EQUIPMENT AT
 6.1'.
  
 PLEASE PROVIDE A TERMITE TREATMENT CERTIFICATE FROM
 HULETT ENVIRONMENTAL SERVICES STATING THAT ALL
 AREASUNDER THE NOW EXISTING STRUCTURE HAVE BEEN TREATED
 FOR TERMITES. THE INFORMATION PROVIDED FROM HULETT
 SERVICES IS NOT CLEAR WHETHER IT COVERS THE ENTIRE
 FOOTPRINT OF THE BUILDING.
  
 ADDITIONAL PERMITS ARE REQUIRED FOR MECHANICAL,
 PLUMBING, ELECTRICAL, ETC,,,,,
  
 SUBMIT THE INDEPENDENT EQUIPMENT TESTING COMPANY'S
 CALIBRATION CERTIFICATES FOR THE EQUIPMENT (MANIFOLD,
 LOAD CELLS, ETC.) USED TO LIFT THE HOUSE, SO THAT THE
 ACCURACY OF THE STATED HOUSE WEIGHT CAN BE VERIFIED.
  
 SUBMIT ENGINEER'S CALCULATIONS TO SHOW THAT, SINCE
 THERE ARE NO REBAR TIES BETWEEN THE FOUNDATION CONCRETE
 AND THE STEM WALL, THE WEIGHT OF THE HOUSE IS
 SUFFICIENT TO RESIST SHEAR (I.E. SLIDING OFF THE
 FOUNDATION) AND UPLIFT (RESULTING FROM OVERTURNING
 ACTION) DUE TO THE WIND PRESSURES DERIVED FROM 140 MPH
 WIND SPEED.
  
  
  
  
  
  
  
 LUIS MARTINEZ
 561-805-6710

Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status F Date 2008-02-29 Cont ID  
Sent By lmartine Date 2008-02-29 Time 14:35 Rev Time 0.00
Received By lmartine Date 2008-02-29 Time 14:35 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status F Date 2007-08-06 Cont ID  
Sent By lmartine Date 2007-08-06 Time 16:37 Rev Time 0.00
Received By lmartine Date 2007-08-06 Time 16:37 Sent To  
Notes
2007-08-06 17:18:17BUILDING REVIEW COMMENTS
  
  
  
  
 PROPERTY IS IN FLOOD ZONE'A' AN ELEVATION
 CERTIFICATE WILL BE REQUIRED. THE SURVEY SUBMITTED
 SHALL BE SIGNED AND SEALED , FLOOD ZONE INFORMATION ON
 SHEET 5 OF 9 MAY BE INCORRECT.
  
 PROVIDE TERMITE TREATMENT CERTIFICATE.
  
 PROVIDE PROOF OF PAYMENT FOR PALM BEACH COUNTY IMPACT
 FEES.
  
 SECTION R401.3 , PROVIDE POSITIVE SURFACE DRAINAGE
 AWAY FROM STRUCTURE AND ADJOINING PROPERTIES.
  
 ADDITIONAL PERMITS ARE REQUIRED FOR MECHANICAL,
 ELECTRICAL, PLUMBING, ECT,,,,,
  
 SUBMIT SIGNED AND SEALED STRUCTURAL ENGINEER'S LETTER
 CERTIFYING THE BUILDING IS STRUCTURALLY SOUND.
  
  
  
  
  
 LUIS MARTINEZ
 561-805-6710
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2007-03-02 Cont ID  
Sent By lmartine Date 2007-03-02 Time 09:17 Rev Time 0.00
Received By lmartine Date 2007-03-02 Time 09:16 Sent To  
Notes
2007-03-02 12:39:15 
 ADDITIONAL REQUIREMENTS,
  
  
 SITE SHALL COMPLY WITH SECT.R401.3, 2004FBC FOR
 SURFACE DRAINAGE, ALSO REQUIRED IS PROOF OF PAYMENT TO
 THE PALM BEACH COUNTY IMPACT FEE OFFICE.
  
2007-03-02 09:33:41 
 BUILDING REVIEW COMMENTS
  
  
  
 FEB. 23RD SUBMITTAL SHOULD HAVE BEEN RECIEVED AS A
 RE-SUBMITTAL SINCE THIS APPLICATION HAS NOT YET BEEN
 APPROVED, FEES MAY BE OWED.
  
 PLEASE PROVIDE ORIGINAL APPLICATION AND 2 COPIES OF
 THE COMPLETE FOUNDATION PLANS AND SURVEYS.
  
  
  
  
  
  
  
 L.MARTINEZ
 805-6710

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2007-02-28 Cont ID  
Sent By lmartine Date 2007-02-28 Time 18:02 Rev Time 0.00
Received By lmartine Date 2007-02-28 Time 18:02 Sent To  
Notes
2007-03-02 09:14:33APPROVED FOR STRUCTURAL CONNECTION ONLY,LM

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2006-12-14 Cont ID  
Sent By lmartine Date 2006-12-14 Time 12:41 Rev Time 0.00
Received By lmartine Date 2006-12-14 Time 12:40 Sent To  
Notes
2006-12-14 13:26:43 
  
 BUILDING COMMENTS
 ------------ ----------------
  
  
 NEW APPLICATION FOR EXPIRED FOUNDATION PERMIT SHALL
 COMPLY WITH , 2004 EXISTING BUILDING CODE, SECTION
 1102.2.2,
 SUBMIT STRUCTURAL ATTACHMENT METHODS FOR THE
 CONNECTION BETWEEN THE FOUNDATION AND THE RELOCATED
 BUILDING.
 SIGNED AND SEALED ENGINEERED DETAILS WILL BE REQUIRED,
 SEE ALSO 2004 FLORIDA BUILDING CODE (RESIDENTIAL). SEE
 2004 FLORIDA BUILDING CODE (RESIDENTIAL) SECTION ,
 404.1
  
  
  
  
  
 L.MARTINEZ
 561-805-6710

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2006-11-27 Cont ID  
Sent By lmartine Date 2006-11-27 Time 10:15 Rev Time 0.00
Received By lmartine Date 2006-11-27 Time 10:14 Sent To Z
Notes
2006-11-27 10:17:16 
  
 RE-ISSUE #05081937, FOUNDATION PERMIT.
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2008-01-11 Cont ID  
Sent By spalmer Date 2008-01-11 Time 16:58 Rev Time 0.00
Received By spalmer Date 2008-01-11 Time 16:58 Sent To B
Notes
2008-01-11 16:58:45TO LUIS MARTINEZ DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2007-06-14 Cont ID  
Sent By adarroug Date 2007-06-14 Time 09:18 Rev Time 0.00
Received By adarroug Date 2007-06-14 Time 09:18 Sent To B
Notes
2007-06-14 09:19:03TO "LMARTINEZ" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2007-06-12 Cont ID  
Sent By adarroug Date 2007-06-12 Time 10:41 Rev Time 0.00
Received By adarroug Date 2007-06-12 Time 10:41 Sent To Z
Notes
2007-06-12 10:42:06TO "Z" BOX/RESUB

Review Stop X PERMIT EXTENSION
Rev No 2 Status P Date 2008-12-19 Cont ID  
Sent By amckenzi Date 2008-12-19 Time 11:21 Rev Time 0.00
Received By amckenzi Date 2008-12-19 Time 11:20 Sent To  
Notes
2008-12-19 11:21:53APPLICATION EXTENDED TO 3-9-09 PER RAB/AMM

Review Stop X PERMIT EXTENSION
Rev No 1 Status P Date 2008-09-05 Cont ID  
Sent By amckenzi Date 2008-09-05 Time 16:03 Rev Time 0.00
Received By amckenzi Date 2008-09-05 Time 16:03 Sent To  
Notes
2008-09-05 16:05:15PERMIT EXTENSION UNTIL 12/9/08 PER NKM/AMM

Review Stop Z ZONING
Rev No 5 Status P Date 2009-05-13 Cont ID  
Sent By kdfreema Date 2009-05-13 Time 09:54 Rev Time 0.00
Received By kdfreema Date 2009-05-13 Time 09:54 Sent To  
Notes
2009-05-13 10:07:45HOUSE APPROVED AT CURRENT LOCATION BY ZONING BOARD OF
 APPEALS JANUARY 9, 2009, BY ZBA CASE NO. 3239.

Review Stop Z ZONING
Rev No 4 Status F Date 2008-03-14 Cont ID  
Sent By choops Date 2008-03-14 Time 08:10 Rev Time 0.00
Received By choops Date 2008-03-14 Time 08:10 Sent To B
Notes
2008-03-14 08:21:30***FAILED - RESUB #3***
  
  
 1)THE NEWLY SUBMITTED SURVEYS SHOW THE RELOCATED HOME
 AT 2.8 FEET FROM THE WEST SIDE PROPERTY LINE, THIS DOES
 NOT MEET THE MINIMUM SETBACK REQUIREMENT.PURSUANT TO
 SECTION 94-72 OF THE CITY OF WEST PALM BEACH ZONING AND
 LAND DEVELOPMENT REGULATIONS:
  
 REQUIRED SIDE SETBACKS = 5 FOOT MINIMUM, WITH A TOTAL
 OF 15 FEET BETWEEN THE TWO SIDES.
 CORNER SIDE SETBACK = 12.5 FOOT MINIMUM
 REAR SETBACK = 15 FEET OR 10% OF LOT DEPTH, WHICHEVER
 IS LESS
 FRONT SETBACK = 25 FOOT MINIMUM.
  
 NOTE:THE 30TH STREET FRONTAGE IS CONSIDERED THE FRONT
 OF THE PROPERTY.
  
 SURVEY SHALL SHOW COMPLIANCE WITH THE MINIMUM SETBACK
 REQUIREMENTS.
  
  
 QUESTIONS/COMMENTS, CONTACT CHRIS HOOPS,
 ZONING TECHNICIAN (561)805-6720
  
  
  
 SENT TO "B" - LM

Review Stop Z ZONING
Rev No 3 Status P Date 2007-06-13 Cont ID  
Sent By choops Date 2007-06-13 Time 10:55 Rev Time 0.00
Received By choops Date 2007-06-13 Time 10:55 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2006-12-08 Cont ID  
Sent By mmclean Date 2006-12-08 Time 13:26 Rev Time 0.00
Received By mmclean Date 2006-12-08 Time 13:26 Sent To  
Notes
2006-12-08 13:30:36DENIED.
 1. PLEASE PROVIDE THE LOT SPLIT DOCUMENTS FOR THE
 LOCATION OF THE MOVED STRUCTURE.
 2. PLEASE PROVIDE A COPY OF THE UNITY OF TITLE FOR THE
 PROPERTY.
  
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720

Review Stop Z ZONING
Rev No 1 Status F Date 2008-03-14 Cont ID  
Sent By mmclean Date 2006-12-06 Time 13:50 Rev Time 0.00
Received By mmclean Date 2006-12-06 Time 13:50 Sent To  
Notes
2008-03-14 12:19:13PREVIOUS COMMENTS WERE INPUT IN ERROR, PLEASE SEE
 BUILDING REVIEW COMMENTS FOR3/14/08L.MARTINEZ
2008-03-14 12:14:32BUILDING REVIEW
  
 FROM PREVIOUS REVIEW;
 ALL NEW MECHANICAL EQUIPMENT SHALL BE INSTALLED AT THE
 MINIMUM ELEVATION OF 7.5' IN FLOOD ZONE A-5. THE
 ELEVATION CERTIFICATE PROVIDED LISTS THE EQUIPMENT AT
 6.1'.
  
 FROM PREVIOUS REVIEW;
 PLEASE PROVIDE A TERMITE TREATMENT CERTIFICATE FROM
 HULETT ENVIRONMENTAL SERVICES STATING THAT ALL AREAS
 UNDER THE NOW EXISTING STRUCTURE HAVE BEEN TREATED FOR
 TERMITES. INFORMATION PROVIDED FROM HULETT SERVICES IS
 NOT CLEAR WHETHER IT COVERS THE ENTIRE FOOTPRINT OF THE
 BUILDING.
  
 FROM PREVIOUS REVIEW;
 ADDITIONAL PERMITS ARE REQUIRED FOR MECHANICAL,
 ELECTRICAL, PLUMBING, ECT,,,,,,
  
  
  
  
  
 LUIS MARTINEZ
 561-805-6710
2006-12-06 13:52:29DENIED,
 1. PLEASE SUBMIT TWO COPIES OF SURVEYS SHOWING THE
 LAYOUT OF THE STRUCTURE ON THE PROPERTY WITH SETBACKS
 (FRONT/SIDE/REAR) FROM PROPERTY LINE.
 2. EXPIRED PERMIT #05081937.
 3. PLEASE MAKE SURE TO SHOW THE LOCATION OF THE A/C
 UNIT ON THE PROPERTY.
  
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720


Account Summary | Usage Policy | Privacy Policy