| 2006-10-17 11:32:48 | ******UNSAT****** |
| | REFERENCE: FBC-2004 FUEL GAS AND FBC-2004 CHAPTER 1 |
| | |
| | THE FOLLOWING INFORMATION IS REQUIRED FOR GAS PLAN |
| | REVIEW: |
| | |
| | 1. PER FBC-2004 CHAPTER 1, SECTION 106.1 SUBMITTAL |
| | DOCUMENTS: MINIMUM OF TWO (2) SETS OF DRAWINGS AND |
| | OTHER DATA REQUIRED WITH EACH APPLICATION FOR PERMIT. |
| | NOTE: ONLY ONE (1) SET WAS SUBMITTED. |
| | |
| | 2. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2004 |
| | FUEL GAS CODE. NOTE: PLEASE INDICATE THE CORRESPONDING |
| | LENGTHS OF THE NEW GENERATOR PIPING. |
| | |
| | 3. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. NOTE: PLEASE |
| | INDICATE THE MATERIAL TYPE AND PIPE SIZES OF THE NEW |
| | GENERATOR PIPING. |
| | |
| | 4. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2004 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.6.1 AND TABLES 402.4(1) THRU |
| | 402.4(33). NOTE: PLEASE INDICATE THEEXISTING BTU LOAD |
| | TO THE HOUSE |
| | |
| | 5. FBC-2004 CHAPTER 1,SECTION 106.3.4.2: |
| | THE PERSON RESPONSIBLE FOR THE DESIGN OF |
| | THE DRAWING SHALL CLEARLY PRINT AND SIGN |
| | NAME, AND ALSO DATE DRAWING. PLEASE DO |
| | THIS PRIOR TO RESUBMITTING. |
| | |
| | END OF COMMENTS: |
| | |
| | REVIEW BY MIKE PERSON |
| | (561) 805-6730 |
| | FAX (561) 805-6731 |
| | E-MAIL [email protected] |
| | UNDER SUPERVISION OF K.STEVENS |
| | (561) 805-6721 |