Plan Review Details - Permit 06090963
Plan Review Stops For Permit 06090963
Review Stop G GAS REVIEW
Rev No 1 Status F Date 2006-10-04 Cont ID  
Sent By mperson Date 2006-10-04 Time 11:53 Rev Time 0.45
Received By mperson Date 2006-10-04 Time 11:53 Sent To PC
Notes
2006-10-04 00:00:00******UNSAT******
 REFERENCE: FBC-2004 FUEL GAS
 FBC-2004 CHAPTER 1
 NFPA-2004 CHAPTER 58
  
 THE FOLLOWING INFORMATION IS REQUIRED
 FOR GAS PLAN REVIEW ON THE ISOMETRIC
 DRAWING:
  
 1. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE.
  
 2. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED ABOVE AND BELOW GROUND, ALL
 PIPE SIZES, (AND THE EDH NUMBER OF
 CORRUGATED STAINLESS STEEL TUBING FOR
 EACH PIPE SIZE BEING USED.
  
 3. TYPE OF GAS, (LP OR NATURAL)
  
 4. BTU LOAD OF EACH APPLIANCE
 (GENERATOR) AND THE TOTAL BTU LOAD ON
 THE SYSTEM. REFER TO THE FBC-2004 FUEL
 GAS CODE SECS. 401.8 THRU 402.6.1 AND
 TABLES 402.4(1) THRU 402.4(33).
  
 5. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2004 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES A.3.1(4).
  
 6. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2004 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
 PROPANE 10 PSI.
  
 7. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT (1ST AND 2ND STAGE REGULATORS)
 TO VERIFY COMPLIANCE WITH STANDARDS NFPA
 54, NFPA 58, AND THE FBC-2004 FUEL GAS
 CODE SEC 402.2.
  
 10. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
 NOTE: THE U/G PROPANE TANK LOCATION WITH
 THE SET BACKS INDICATED ON THE SITE
 SURVEY PLAN. FRONT PROPERTY LINE IS 12',
 TANK DIAMETER IS 37", FRONT PROPERTY
 LINE TO BUILDING IS 18'-10", BY DOING
 THE MATH THAT LEAVES 3'-9" FROM THE SIDE
 OF THE TANK TO THE BUILDING. A MINIMUM
 OF 10' CLEARANCE IS REQUIRED FROM
 BUILDING TO TANK.
  
 11. FBC-2004 CHAPTER 1,SECTION
 106.3.4.2: THE PERSON RESPONSIBLE FOR
 THE DESIGN OF THE DRAWING SHALL CLEARLY
 PRINT AND SIGN NAME, AND ALSO DATE
 DRAWING. PLEASE DO THIS PRIOR TO
 RESUBMITTING.
  
 END OF COMMENTS:
  
 REVIEW BY MIKE PERSON
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL [email protected]
 UNDER SUPERVISION OF K.STEVENS
 (561) 805-6721
  
  
  
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-10-04 Cont ID  
Sent By mperson Date 2006-10-04 Time 13:58 Rev Time 0.00
Received By mperson Date 2006-09-29 Time 09:08 Sent To  
Notes
2006-09-29 00:00:00TO "G" BOX