| Plan Review Stops For Permit 06090700 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
P |
Date |
2006-10-02 |
|
|
Cont ID |
|
| Sent By |
lursu |
Date |
2006-10-02 |
Time |
12:38 |
Rev Time |
0.00 |
| Received By |
lursu |
Date |
2006-10-02 |
Time |
12:37 |
Sent To |
|
|
| Notes |
| 2006-10-02 00:00:00 | EXT #0020 WAS CREATED FOR UNIT 1203 | | 2006-09-30 00:00:00 | NEEDS FOR NEW SPACE. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
P |
Date |
2007-04-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2007-04-02 |
Time |
08:23 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2007-04-02 |
Time |
08:22 |
Sent To |
FIRE |
|
| Notes |
| 2007-04-02 08:24:35 | REVISED SHEETS A1 AND LS1 ARE OK. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2007-02-02 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2007-02-02 |
Time |
15:00 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2007-02-02 |
Time |
15:00 |
Sent To |
|
|
| Notes |
| 2007-02-02 15:02:00 | REVISED PAGES A1, A2, LS1 ARE OK |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2006-12-12 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2006-12-12 |
Time |
16:19 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2006-12-12 |
Time |
16:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2006-11-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2006-11-03 |
Time |
11:45 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2006-11-03 |
Time |
11:45 |
Sent To |
|
|
| Notes |
| 2006-11-03 15:11:39 | | | | DENIED BY BUILDING | | | | | | 1) THE LEVEL OF ALTERATION FOR THIS PROJECT IS LEVEL 2, | | | NOT LEVEL 1. PLEASE CORRECT ON SHEET A.0. SEE 2004 FBC | | | EXISTING BUILDING CODE SECTION 304. | | | | | | 2) ON SHEET LS.1, THE CONSTRUCTION TYPE IS INCORRECTLY | | | SPECIFIED AS TYPE V-B. THE CONSTRUCTION TYPE LISTED ON | | | SHEET A.0 IS TYPE I-A. PLEASE CORRECT. | | | | | | 3) ON LS.1, THE OCCUPANT LOAD CALCULATIONS ARE | | | INCORRECT. THE OCCUPANCY IS BUSINESS NOT MERCANTILE. | | | THE FLOOR AREA FOR OCCUPANT IS 100 GROSS. SEE FBC TABLE | | | 1004.1.2. PLEASE CORRECT. | | | AREA IS 3000 SQFT DIVIDED BY 100 WHICH EQUALS 30 | | | PERSONS. | | | | | | 4) THE REQUIRED EGRESS WIDTH IS 30 TIMES 0.2EQUALS 6 | | | INCHES. HOWEVER, FBC 1008.1.1 REQUIRES EGRESS DOORS TO | | | HAVE A MINIMUM CLEAR WIDTH OF 32 INCHES. SEE NOTATIONS | | | ON SHEET LS.1 OF ONE OF THE PLAN SETS. | | | | | | 5)ON SHEETS ET.1 AND D.1 PORTIONS OF THE EXISTING | | | WALLS APPEAR TO BE MISSING. PLEASE CORRECT. | | | | | | 6)SPECIFY THE FIRE RATING OF THE NEW WALLS THAT ARE | | | PART OF THE EXISTING FIRE RATED CORRIDOR. INDICATE | | | THESE WALLS ON THE PLANS. PROVIDE WALL SECTIONS AND | | | ASSEMBLY NUMBERS. | | | | | | 7) SPECIFY THE REQUIRED FIRE RATING OF THE TWO NEW | | | EGRESS DOORS IN THE FIRE RATED CORRIDOR. PROVIDE ID | | | TAGS FOR THE DOORS THAT WILL TIE THEM TO THE DOOR | | | SCHEDULE ON SHEET A.4. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2006-09-28 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2006-09-28 |
Time |
12:47 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2006-09-28 |
Time |
07:07 |
Sent To |
|
|
| Notes |
| 2006-09-28 00:00:00 | DENIED BY BUILDING | | | | | | 1) SPECIFY THE LEVEL OF ALTERATION FOR | | | THE WORK AS SPECIFIED IN THE 2004 FBC | | | EXISTING BUILDING CODE. | | | | | | 2) SPECIFY THE BUILDING HEIGHT AND | | | NUMBER OF STORIES. | | | | | | 3) THE CONSTRUCTION TYPE SPECIFIED FOR | | | THIS BUILDING IS INCORRECT. SEE 2004 FBC | | | TABLE 503 FOR ALLOWABLE HEIGHTS AND | | | AREAS. | | | | | | 4) ON SHEET LS.1, THE OCCUPANCY TYPE AND | | | OCCUPANT LOAD ARE INCORRECT. SEE FBC 302 | | | AND TABLE 1004.1.2. | | | | | | 5) SUBMIT A DEMOLITION PLAN OR FLOOR | | | PLAN SHOWING THE EXISTING CONDITION OF | | | THE SPACE PRIOR TO THE PROPOSED | | | CONSTRUCTION. | | | | | | 6) ON SHEET LS.1 THE MAXIMUM DEAD END | | | CORRIDOR IS INCORRECTLY SPECIFIED AS 5'. | | | SEE FBC 1016.3 EXCEPTION (2) WHICH | | | ALLOWS 50' MAX DEAD END CORRIDOR LENGTH | | | IN FULLY SPRINKLERED BUSINESS | | | OCCUPANCIES. | | | | | | 7) FBC TABLE 803.5 REQUIRES INTERIOR | | | WALL AND CEILING FINISHES TO BE CLASS B | | | IN VERTICAL EXITS AND EXIT PASSAGEWAYS. | | | PLEASE REVISE ON SHEET A.1. | | | | | | 8) THE DOOR AT THE SHOWER ROOM CAN NOT | | | SWING INTO THE REQUIRED FLOOR SPACE FOR | | | THE LAVATORY. SEE FBC 11-4.23.2. | | | | | | 9) THE BREAKROOM CABINET ELEVATION ON | | | LS.1 SPECIFIES THE 2001 FBC. PLEASE | | | UPDATE TO 2004 FBC. | | | | | | 10) ON LS.1 THE BREAKROOM CABINET | | | ELEVATION DOES NOT CORRESPOND TO THE | | | FLOOR PLANS. PLEASE CORRECT. THE DOOR | | | ALSO SWINGS INTO THE CLEAR FLOOR SPACE | | | AT THE SINK. | | | | | | 11) FBC 11-4.24.4 LIMITS SINKS TO A | | | MAXIMUM DEPTH OF 6-1/2 INCHES. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)805-6714 | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
5 |
Status |
P |
Date |
2007-02-21 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2007-02-21 |
Time |
18:43 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2007-02-21 |
Time |
18:20 |
Sent To |
PC |
|
| Notes |
| 2007-02-21 18:44:06 | REV'S OK, STAMPED |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2007-01-08 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2007-01-08 |
Time |
07:19 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2007-01-07 |
Time |
19:54 |
Sent To |
PC |
|
| Notes |
| 2007-01-08 07:19:52 | STAMPED, AND WILL NEED NEW NOC, AS THE NOC FROM SEPT | | | HAS EXPIRED. FS 713.13(2). | | 2007-01-07 19:55:53 | 2007-01-07 19:55:53 | | | REMOVED FROM INCOMING. IN ELEC FOR REVIEW. | | | | | | **PREVIOUS STAMPED PLUMING SHEETS INSERTED IN SETSAND | | | REMOVED REVISED SHEETS ON 1/5 BY CONTRACTOR.. WILL | | | SUBMIT REVISED PLUMBING AFTER PERMIT IS ISSUED. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
F |
Date |
2006-12-08 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2006-12-08 |
Time |
07:24 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2006-12-07 |
Time |
20:25 |
Sent To |
|
|
| Notes |
| 2006-12-08 07:53:38 | ****UNSAT 3RD REIVEW ***** | | | | | | *** PLEASE KNOW AS SOME ITEMS WERE ADDRESSED FOR THE | | | MOST PART HOWEVER THERE ARE SOME ITEMS WHICH DO NOT | | | CORRELATE OR NOT CLEAR FROM PREVIOUS REVIEW. | | | | | | | | | 1) NOTE: PLEASE SHOW THE ATTACHMENT POINT FOR THE | | | TRANSFORMER. BLDG STEEL, EXISTING GROUNDING ELECTRODE | | | SYSTEM/RISER IN BLDG ELECTRICAL ROOM? | | | 250.30, 250.50, 250.58 | | | BY PLACING THE CONDUCTOR SIZE ON RISER THIS DOES | | | INDICATE THE ATTACHMENT LOCATION AS PREVIOUSLY | | | REQUESTED. | | | | | | 2) NOTE: PLEASE CORRELATE RISER AND PANEL SCHEDULE FOR | | | FEEDERS TO THE TRANSFORMER. | | | PLEASE SEE RISER SHOWS #6'S AND THE PANEL SCHEDULE | | | SHOWS #8'S. | | | FBC 106.1.2, | | | 310.16 | | | | | | 3) NOTE: PLEASE SEE LIGHTING POWER DENSITIES ARE NOT | | | COMPLETED AND SHALL BE INDICATE BY THE DESIGNER. THE | | | "BLOCK" SHOWING LPD'S PERMITTED IS NOT COMPLETE AT THIS | | | TIME. | | | 13-415.2, 13-415.2.ABC.1 | | | | | | 4) NOTE: PLEASE SEE THERE IS NO LIGHTING CONTACTOR | | | DETAIL, SCHEDULE SHOWN AS STATED IN NOTE #3 OF THE KEY | | | NOTES. | | | PLEASE SEE NO LCP/LCC IS SHOWN NEXT TO ELECTRICAL PANEL | | | AS STATED IN NOTE ALSO. | | | AS STATED IN THE PREVIOUS REVIEW, PLEASE PROVIDE DETAIL | | | FOR THIS. PLEASE KNOW, ON THIS DETAIL THE EM/EXT LTS | | | WILL BE SHOWN WIRED AHEAD OF ANY LIGHTING CONTROL PANEL | | | OR CONTACTOR, AS NOTED IN NOTE #4 OF KEY NOTES PER | | | 700.12E | | | | | | **** ONCE ALL REVIEWS ARE DONE, AND "IF" ALL THE OTHER | | | REVIEWS HAVE PASSED PLEASE HAVE THE GENERAL CONTRACTOR | | | CONTACT THIS REVIEWER. | | | | | | | | | * ** IMPORTANT** | | | ONCE ALL REVIEWS ARE DONE AND PLANS ARE | | | PICKED UP FOR CORRECTIONS, PLEASE BE | | | SURE TO COMPLETELY REMOVE ALL OLD/VOIDED | | | SHEETS AND ONLY INSERT NEW REVISED | | | SHEETS INTO TWO COMPLETE SETS FOR REVIEW | | | AND STAMPING. DO NOT LEAVE ANY | | | OLD/VOIDED SHEETS IN SETS. | | | PLEASE KNOW ONLY ONE SET OF THE | | | OLD/VOIDED SHEETS SHOULD BE SUBMITTED | | | FOR REFERENCE. | | | THIS WILL HELP IN THE REVIEW PROCESS AND | | | AVOID ANY DELAYS. | | | | | | ** PLEASE BE SURE TO CALL IF THERE ARE ANY QUESTIONS OR | | | COMMENTS WITH RESPECT TO THE TYPED COMMENTS ABOVE. IF | | | THERE ARE ANY COMMENTS WHICH ARE NOT CLEAR IN ANY WAY, | | | NOT UNDERSTOOD OR NOT TYPED IN A CLEAR MANOR, PLEASE DO | | | NOT HESITATE IN CONTACTING THIS OFFICE AND THIS | | | REVIEWER. | | | | | | | | | | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | CONSTRUCTION SERVICES DEPT. | | | CITY OF WEST PALM BEACH | | | 561-805-6717 | | | [email protected] | | 2006-12-08 06:57:46 | IN PROGRESS | | 2006-12-07 20:26:11 | REMOVED FROM INCOMING, IN ELECTRIC FOR REVIEW. WILL BE | | | SENT BACK TO INCOMING ONCE REVIEW IS DONE. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2006-10-28 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2006-10-28 |
Time |
11:42 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2006-10-27 |
Time |
21:13 |
Sent To |
|
|
| Notes |
| 2006-10-28 11:42:55 | *** UNSAT 2ND REVIEW*** | | | | | | ** PLEASE SEE SOME NOTE SNOTES FROM PREVIOUS REVIEW AND | | | SEE NEW NOTE ADDED TO THE BOTTOM OF NOTES. | | | PLEASE SEE NOTES BELOW ARE TAKEN DIRECTLY FROM PREVIOUS | | | REVIEW. | | | PLEASE SEE NEW NOTE DUE TO CHANGES IN RISER FROM | | | PREVIOUS REVIEW. | | | | | | | | | 1)A) NOTE: NO, PLEASE SEE NOW SOME SHEETS SHOW # | | | 1101?? | | | PLEASE CORRELATE AND BE SURE WORK AND SCOPE OF WORK IS | | | LOCATED IN ONE AREA. PLEASE ADJUST PERMIT APPLICATION | | | IF NEEDED AND PLEASE BE SURE TO CORRELATE PLANS. PLEASE | | | SEE PLANS SHOWS 1203 ON SOME SHEETS AND 1101 ON | | | OTHERS??? | | | | | | ** PREVIOUS REVIEW NOTE ** | | | PLEASE SEE SUITE/UNIT # STILL | | | NEEDS TO BE VERIFIED. PLEASE KNOW, ONCE | | | THE SUITE CORRELATES, THEN PLEASE | | | ADJUST. PLEASE SEE PLANS INDICATE 1201, | | | THE PERMIT APPLICATION MENTIONS 1203. | | | COPY OF PERMIT APPLICATION HAS BEEN SENT | | | TO ADDRESSING. | | | | | | 1) NOTE: OK. | | | | | | 2) NOTE:NO, QUOTING THE SAME CODE GIVEN IN NOTES IN | | | LIEU OF TECHNICAL DETAIL OR INFORMATION IS NOT | | | PERMITTED. | | | PLEASE SEE RISER IS STILL SHOWING A NEUTRAL FROM THE | | | PANEL "HP" TO TRANSFORMER. | | | SEE NEW NOTES FOR CONDUCTORS. | | | | | | ** PREVIOUS REVIEW NOTE ** | | | PLEASE INDICATE THE GROUNDING | | | ELECTRODE CONDUCTOR AND ATTACHMENT FOR | | | THE NEW TRANSFORMER. PER 250.66,250.24, | | | 250.30, 250.20 ETC. | | | | | | 3) NOTE: OK SEEMS DOORS ARE REMOVED HOWEVER SEE THE | | | NEXT COMMENT. | | | | | | ** PREVIOUS REVIEW NOTE ** | | | PLEASE SEE TRANSFORMER LOCATION | | | MAY NOT BE LOCATED IN A STORAGE CLOSET. | | | PLEASE SEE MIN CLEARANCES PER | | | 450.9,450.13, 110.26 ETC. | | | | | | 4) NOTE: NO, THIS IS THE SAME NOTE. PLEASE SEE THE | | | LENGTH OF TAPPED CONDUCTORS FROM TRANSFORMER DOES NOT | | | MEET PREVIOUS NOTE . | | | PLEASE SEE 240.21, THE MCB WAS ADDED TO "LP1" HOWEVER | | | THE LENGHT OF CONDUCTORS WOULD FARTHER THAN 10FT. | | | | | | ** PREVIOUS REVIEW NOTE ** | | | PLEASE ALSO SEE 240.21 AS THE | | | DISTANCE OF THE TAPPED CONDUCTORS FROM | | | THE SECONDARY SIDE OF THE TRANSFORMER | | | DOES NOT SEEM TO MEET CODE. PLEASE SEE | | | 10FT OF CONDUCTOR TAP RULE. | | | PLEASE SEE IT IS UNCLEAR OF THE PANEL | | | LP1 CONTAINS A MCB WITH OCP?? | | | 408.16, 240.21 | | | | | | 5) NOTE: OK. | | | | | | 6) NOTE:NO, NO INFORMATION SHOWN FOR NOTE #3 OF KEY | | | NOTES ON LIGHTING PLAN.?? | | | | | | ** PREVIOUS REVIEW NOTE ** | | | PLEASE SEE THE MINIMUM LIGHTING | | | CONTROL SYSTEM AS PROPOSED IN NOTE #3 OF | | | KEY NOTES, NEEDS TO BE SHOWN. PLEASE | | | ALSO SEE SOME AREAS OF INGRESS AND | | | EGRESS SPACE REQUIRES THE OVER-RIDE | | | DEVICES SO THAT THE OCCUPANT CAN SEE THE | | | LIGHTING WHICH IS BEING OVER-RIDDEN. | | | PLEASE PROVIDE THESE DEVICES AT THE | | | LOCATION(S) AS MENTIONED. | | | PLEASE VERIFY THE RECEPT/WORK OFFICE | | | STATION AREA, AS THIS AREA SEEM TO HAVE | | | ONE OCCUPANT SENSOR TYPE DEVICE WHICH | | | OPERATES LT'S IN ANOTHER ARE. THIS WAS | | | RED-LINED ON PLANS. | | | PLEASE PROVIDE MIN LIGHTING DENSITIES | | | BEING AS SHOWN . | | | PLEASE SEE 13-415.1.ABC.1.1, .1.2, AND | | | .1.3. | | | PLEASE SEE 13-415.2.ABC.1, AND TABLES. | | | | | | 7) NOTE:NO, AND PLEASE SEE NEW NOTES AS MAIN HAS | | | CHANGED. | | | | | | ** PREVIOUS REVIEW NOTE ** | | | PLEASE STATE THE AIC RATING TO | | | NEW MAIN DISCONNECT. 110.9., 240.12 | | | | | | *** NEW NOTE *** | | | | | | 8) NOTE: PLEASE SEE NOTE BELOW WHICH WAS AS*** | | | IMPORTANT*** HOWEVER THIS WAS NOT DONE. PLEASE KNOW IF | | | PLANS COME BACK WITH THE OLD/VOIDED SHEETS IN SETS, | | | PLANS WILL BE PLACED OUT FRONT FOR PICK UP UNTIL THIS | | | IS DONE. | | | PLEASE KNOW AS PREVIOUSLY MENTIONED, THIS ONLY DELAYS | | | THE REVIEW PROCESS AND ISSUANCE OF PERMIT. | | | | | | ** IMPORTANT** | | | ONCE ALL REVIEWS ARE DONE AND PLANS ARE | | | PICKED UP FOR CORRECTIONS, PLEASE BE | | | SURE TO COMPLETELY REMOVE ALL OLD/VOIDED | | | SHEETS AND ONLY INSERT NEW REVISED | | | SHEETS INTO TWO COMPLETE SETS FOR REVIEW | | | AND STAMPING. DO NOT LEAVE ANY | | | OLD/VOIDED SHEETS IN SETS. | | | PLEASE KNOW ONLY ONE SET OF THE | | | OLD/VOIDED SHEETS SHOULD BE SUBMITTED | | | FOR REFERENCE. | | | THIS WILL HELP IN THE REVIEW PROCESS AND | | | AVOID ANY DELAYS. | | | | | | 9) NOTE: PLEASE SEE RISER HAS NOW CHANGED TO 150A'S, | | | YET PANEL "H" REMAINS 100A'S?? | | | PLEASE SEE PREVIOUS PLANS SHOWED 100A MAIN. | | | PLEASE CORRELATE, RISER PANEL SCHEDULE CONDUCTORS ETC | | | ETC. | | | | | | 10) NOTE: PLEASE SEE FS 553.80(2)(B) WITH RESPECT TO | | | REPEAT COMMENTS FOR CODE COMPLIANCE. | | | THIS IS ONLY A NOTICE GIVEN AT THIS TIME. | | | | | | | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | | REVIEW. IF THERE ARE ANY QUESTIONS, | | | PLEASE DO NOT HESITATE TO CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | CONSTRUCTION SERVICES DEPT. | | | CITY OF WEST PALM BEACH | | | 561-805-6717 | | | [email protected] | | | | | 2006-10-27 21:16:04 | *** IN ELECTRICAL FOR REVIEW*** | | | | | | | | | ALL OLD/VOIDED SHEETS WHICH WERE REQUESTED TO BE | | | REMOVED ON PREVIOUS REVIEW WERE NOT. | | | PLEASE KNOW, THIS ONLY CAUSES DELAYS IN REVIEWING AND | | | STAMPING OF PLANS AS PREVIOUSLY NOTED. | | | THIS WAS NOTED AS** IMPORTANT**. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2006-09-30 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2006-09-30 |
Time |
12:38 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2006-09-29 |
Time |
20:23 |
Sent To |
|
|
| Notes |
| 2006-09-30 00:00:00 | *** UNSAT *** | | | | | | | | | 1)A) NOTE: PLEASE SEE SUITE/UNIT # STILL | | | NEEDS TO BE VERIFIED. PLEASE KNOW, ONCE | | | THE SUITE CORRELATES, THEN PLEASE | | | ADJUST. PLEASE SEE PLANS INDICATE 1201, | | | THE PERMIT APPLICATION MENTIONS 1203. | | | COPYOF PERMIT APPLICATION HAS BEEN SENT | | | TO ADDRESSING. | | | | | | 1) NOTE: PLEASE VERFIFY MISSING | | | EQUIPMENT GROUNDING CONUDCTOR FROM | | | BUS-TAP DISC TO THE METER. PLEASE ALSO | | | INDICATE "FLOATING NEUTRAL" AT THE METER | | | AT THIS IS AFTER THE FIRST MEANS OF | | | DISCONNECT FOR TRHE BUILDING. | | | 250.6,250.24., 250.110, 250.122 | | | | | | 2) NOTE: PLEASE INDICATE THE GROUNDING | | | ELECTRODE CONDUCTOR AND ATTACHMENT FOR | | | THE NEW TRANSFORMER. PER 250.66,250.24, | | | 250.30, 250.20 ETC. | | | | | | 3) NOTE: PLEASE SEE TRANSFORMER LOCATION | | | MAY NOT BE LOCATED IN A STROAGE CLOSET. | | | PLEASE SEE MIN CLEARENCES PER | | | 450.9,450.13, 110.26 ETC. | | | | | | 4) NOTE: PLEASE ALSO SEE 240.21 AS THE | | | DISTANCE OF THE TAPPED CONDUCTORS FROM | | | THE SECONDARY SIDE OF THE TRANSFORMER | | | DOES NOT SEEM TO MEET CODE. PLEASE SEE | | | 10FT OF CONDUCTOR TAP RULE. | | | PLEASE SEE IT IS UNCLEAR OF THE PANEL | | | LP1 CONTAINS A MCB WITH OCP?? | | | 408.16, 240.21 | | | | | | 5) NOTE: PLEASE SEE PLANS FROM A- SHEETS | | | TO MEP, SEEM TO INDICATE A "STACKABLE | | | WASHER/DRYER UNTI , HOWEVER THE LOAD | | | CALCULATIONS AND ELECTRICAL PLANS DO NOT | | | SEEM TO CORRELATE WITH THIS. PLEASE | | | VERIFY AND ADJUST. | | | ** PLEASE KNOW, UNDER THE NEW 2005 CODE | | | WHICH IS NOT YERT IN EFFECT, THIS WOULD | | | REQUIRE BOTH OF THESE CIRCUITS OR EVEN | | | ONE TO BE GFI PROTECTED. THIS IS ONLY | | | FOR INFORMATIONAL PURPOSE AS THIS | | | PROJECT IS UNDER THE 2002 NEC. | | | | | | 6) NOTE: PLEASE SEE THE MINIMUM LIGHTING | | | CONTROL SYSTEM AS PROPOSED IN NOTE #3 OF | | | KEY NOTES, NEEDS TO BE SHOWN. PLEASE | | | ALSO SEE SOME AREAS OF INGRESS AND | | | EGRESSINTO SPACE REQUIRES THE OVER-RIDE | | | DEVICES SO THAT THE OCCUPANT CAN SEE THE | | | LIGHTING WHICH IS BEING OVER-RIDEN. | | | PLEASE PROVIDE THESE DEVICES AT THE | | | LOCATION(S) AS MENTIONED. | | | PLEASE VERIFY THE RECEPT/WORK OFFICE | | | STATION AREA, AS THIS AREA SEEM TO HAVE | | | ONE OCCUPANT SENSOR TYOE DEVICE WHICH | | | OPERATES LTS IN ANOTHER ARE. THIS WAS | | | REDLINED ON PLANS. | | | PLEASE PROVIDE MIN LIGHTING DENSITIES | | | BEING AS SHOWN . | | | PLEASE SEE 13-415.1.ABC.1.1, .1.2, AND | | | .1.3. | | | PLEASE SEE 13-415.2.ABC.1, AND TABLES. | | | | | | 7) NOTE: PLEASE STATE THE AIC RATING TO | | | NEW MAIN DISCONNECT. 110.9. | | | | | | ** IMPORTANT** | | | ONCE ALL REVIEWS ARE DONE AND PLANS ARE | | | PICKED UP FOR CORRECTIONS, PLEASE BE | | | SURE TO COMPLETELY REMOVE ALL OLD/VOIDED | | | SHEETS AND ONLY INSERT NEW REVISED | | | SHEETS INTO TWO COMPLETE SETS FOR REVIEW | | | AND STAMPING. DO NOT LEAVE ANY | | | OLD/VOIDED SHEETS IN SETS. | | | PLEASE KNOW ONLY ONE SET OF THE | | | OLD/VOIDED SHEETS SHOULD BE SUBMITTED | | | FOR REFERENCE. | | | THIS WILL HELP IN THE REVIEW PROCESS AND | | | AVOID ANY DELAYS. | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | | REVIEW. IF THERE ARE ANY QUESTIONS, | | | PLEASE DO NOT HESITATE TO CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | CONSTRUCTION SERVICES DEPT. | | | CITY OF WEST PALM BEACH | | | 561-805-6717 | | | [email protected] | | | | | | | | | | | 2006-09-29 00:00:00 | IN ELEC FOR REVIEW |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
5 |
Status |
P |
Date |
2007-04-02 |
|
|
Cont ID |
|
| Sent By |
mawillia |
Date |
2007-04-02 |
Time |
11:27 |
Rev Time |
0.00 |
| Received By |
mawillia |
Date |
2007-04-02 |
Time |
11:17 |
Sent To |
|
|
| Notes |
| 2007-04-02 11:20:28 | *****REVISIONS OF 03/28/2007 APPROVED***** | | | | | | SHEET LS.1 WAS STAMPED, INITIALED, AND DATED. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
4 |
Status |
P |
Date |
2007-02-12 |
|
|
Cont ID |
|
| Sent By |
mawillia |
Date |
2007-02-12 |
Time |
11:45 |
Rev Time |
0.00 |
| Received By |
mawillia |
Date |
2007-02-12 |
Time |
11:45 |
Sent To |
|
|
| Notes |
| 2007-02-12 11:48:33 | *****REVISIONS OF 01/30/2007 APPROVED***** | | | | | | SHEET LS.1 WAS STAMPED, INITIALED, AND DATED. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2006-12-12 |
|
|
Cont ID |
|
| Sent By |
mawillia |
Date |
2006-12-12 |
Time |
14:14 |
Rev Time |
0.00 |
| Received By |
mawillia |
Date |
2006-12-12 |
Time |
14:14 |
Sent To |
|
|
| Notes |
| 2006-12-12 14:16:56 | *****APPROVED***** | | | | | | | | | TO BE STAMPED WHEN ALL OTHER PLAN REVIEW COMMENTS HAVE | | | BEEN ADDRESSED |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
F |
Date |
2006-10-30 |
|
|
Cont ID |
|
| Sent By |
mawillia |
Date |
2006-10-30 |
Time |
10:39 |
Rev Time |
0.00 |
| Received By |
mawillia |
Date |
2006-10-30 |
Time |
10:39 |
Sent To |
|
|
| Notes |
| 2006-10-30 10:56:29 | *****UNSAT***** | | | | | | | | | | | | YOUR RESPONSES TO PREVIOUS FIRE PLAN REVIEW COMMENTS OF | | | 10/03/06 WERE RECEIVED AS FOLLOWS: | | | | | | | | | 1.OK | | | | | | 2.OK | | | | | | 3.OK | | | | | | 4.SO NOTED | | | | | | 5.SO NOTED | | | | | | 6.SO NOTED | | | | | | 7.OK | | | | | | 8.THE ELECTRICAL SHEETS THAT ARE TO BE REFERENCED | | | REFLECT SUITE 1101, NOT 1203. | | | | | | | | | | | | CAPT. MICHAEL A. WILLIAMS | | | FIRE PLAN REVIEW | | | 561-805-6722 |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2006-10-03 |
|
|
Cont ID |
|
| Sent By |
mawillia |
Date |
2006-10-03 |
Time |
10:52 |
Rev Time |
0.00 |
| Received By |
mawillia |
Date |
2006-10-03 |
Time |
10:52 |
Sent To |
P |
|
| Notes |
| 2006-10-03 00:00:00 | *****DENIED***** | | | | | | | | | | | | 1.) VERIFY/RECTIFY THE SUITE NUMBER OF | | | WHERE THE SCOPE OF THE WORK IS GOING TO | | | BE DONE. THE APPLICATION HAS SUITE 1203, | | | WHEREAS THE PLANS HAVE SUITE 1201. | | | | | | 2.) STRUCTURES UNDERGOING CONSTUCTION, | | | ALTERATION, OR DEMOLITION OPERATIONS | | | SHALL COMPLY WITH NFPA 241. | | | | | | 3.) ACCUMULATIONS OF COMBUSTIBLE WASTE | | | MATERIAL AND DUST DEBRIS SHALL BE | | | REMOVED FROM THE STRUCTURE AND ITS | | | IMMEDIATE VICINITY AT THE END OF THE | | | SHIFT OR MORE FREQUENTLY AS NECESSARY | | | FOR SAFE OPERATIONS. | | | | | | 4.) WHERE THE BUILDING IS PROTECTED BY | | | FIRE PROTECTION SYSTEMS, SUCH SYSTEMS | | | SHALL BE MAINTAINED OPERATIONAL AT ALL | | | TIMES DURING ALTERATION. | | | | | | 5.) WHEN IT IS NECESSARY TO SHUT DOWN A | | | FIRE PROTECTION SYSTEM, THE FIRE | | | DEPARTMENT WILL BE NOTIFIED WHEN THE | | | SYSTEM IS SHUT DOWN AND WHEN IT IS | | | RETURNED TO SERVICE. | | | | | | 6.) IF THE SCOPE OF THE INTERIOR | | | BUILDOUT REQUIRES MODIFICATION OF THE | | | FIRE SPRINKLER OR FIRE ALARM SYSTEM, | | | SEPARATE PERMIT AND SHOP DRAWINGS/PLANS | | | ARE REQUIRED. | | | | | | 7.) INTERIOR FINISH FOR WALLS AND | | | CEILINGS IN EXITS AND EGRESS CORRIDORS | | | SHALL BE CLASS "A" OR CLASS "B". | | | | | | 8.) INDICATE ON THE PLANS THE LOCATION | | | OF FIRE PROTECTION SYSTEMS(I.E. | | | SPRINKLER HEADS, SMOKE ALARMS, PULL | | | STATIONS, FIRE EXTINGUISHER(S), AUDIO | | | AND/OR VISUAL DEVICES, DUCT DETECTORS, | | | ETC.) FOR THE EXISTING AS WELL AS THE | | | PROPOSED LAYOUT OF THE TENANT SPACE. | | | | | | | | | **PLEASE SUBMIT OR ADDRESS THE ABOVE | | | INFORMATION FOR REVIEW.** | | | | | | | | | CAPT. MICHAEL A. WILLIAMS | | | FIRE PLAN REVIEW | | | 561-805-6722 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
8 |
Status |
N |
Date |
2007-03-29 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2007-03-29 |
Time |
20:06 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2007-03-29 |
Time |
20:06 |
Sent To |
B |
|
| Notes |
| 2007-03-29 20:06:28 | TO RMCD DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
7 |
Status |
N |
Date |
2007-02-20 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2007-02-20 |
Time |
13:21 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2007-02-20 |
Time |
13:18 |
Sent To |
E |
|
| Notes |
| 2007-02-20 13:21:32 | TO "DPALMER" DESK/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
6 |
Status |
N |
Date |
2007-02-15 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2007-02-15 |
Time |
13:06 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2007-02-15 |
Time |
13:06 |
Sent To |
M |
|
| Notes |
| 2007-02-15 13:06:52 | TO "TGORDON" DESK/REV |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2007-02-02 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2007-02-02 |
Time |
09:54 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2007-02-02 |
Time |
09:54 |
Sent To |
|
|
| Notes |
| 2007-02-02 09:54:38 | TO "BOB"#18 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2006-12-21 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2006-12-21 |
Time |
16:23 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2006-12-21 |
Time |
16:23 |
Sent To |
|
|
| Notes |
| 2006-12-21 16:24:24 | WAITING FOR "COMM" BD |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2006-11-20 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2006-11-20 |
Time |
16:54 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2006-11-20 |
Time |
16:54 |
Sent To |
|
|
| Notes |
| 2006-12-09 17:22:07 | TO BOB #9 | | 2006-11-20 16:54:29 | WAITING FOR "BOB" |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2006-10-18 |
|
|
Cont ID |
|
| Sent By |
adarroug |
Date |
2006-10-18 |
Time |
16:44 |
Rev Time |
0.00 |
| Received By |
adarroug |
Date |
2006-10-18 |
Time |
16:44 |
Sent To |
|
|
| Notes |
| 2006-10-27 14:25:03 | TO "BOB"#15 | | 2006-10-18 16:44:42 | WAITING FOR "BOB" |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2006-10-03 |
|
|
Cont ID |
|
| Sent By |
mawillia |
Date |
2006-10-03 |
Time |
10:52 |
Rev Time |
0.00 |
| Received By |
mawillia |
Date |
2006-09-22 |
Time |
14:19 |
Sent To |
|
|
| Notes |
| 2006-09-23 00:00:00 | TO "BOB"#15 | | 2006-09-22 00:00:00 | WAITING FOR "BOB" |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
4 |
Status |
P |
Date |
2007-02-20 |
|
|
Cont ID |
|
| Sent By |
tgordon |
Date |
2007-02-20 |
Time |
09:39 |
Rev Time |
0.30 |
| Received By |
tgordon |
Date |
2007-02-20 |
Time |
09:39 |
Sent To |
|
|
| Notes |
| 2007-02-20 09:40:53 | REVISION TO MECH. PLANS PAGE M.1 AND M.2. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2006-12-12 |
|
|
Cont ID |
|
| Sent By |
tgordon |
Date |
2006-12-12 |
Time |
16:42 |
Rev Time |
0.30 |
| Received By |
tgordon |
Date |
2006-12-12 |
Time |
16:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2006-10-31 |
|
|
Cont ID |
|
| Sent By |
tgordon |
Date |
2006-10-31 |
Time |
10:21 |
Rev Time |
0.35 |
| Received By |
tgordon |
Date |
2006-10-31 |
Time |
10:21 |
Sent To |
|
|
| Notes |
| 2006-10-31 10:23:27 | *** DENIED *** | | | 1) PLEASE SUBMIT A LETTER FROM AN | | | ENGINEER THAT'S ASSOCIATED WITH THE | | | CLOTHES DRYER MANUFACTURE THAT STATES | | | THE USE OF A BOSTER FAN IN THE DRYER | | | VENT WILL NOT VOID THE DRYERS WARRANTY. | | | | | | MECHANICAL PLAN REVIEW BY; | | | TOM GORDON (561) 805-6729. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2006-09-28 |
|
|
Cont ID |
|
| Sent By |
tgordon |
Date |
2006-09-28 |
Time |
14:08 |
Rev Time |
0.30 |
| Received By |
tgordon |
Date |
2006-09-28 |
Time |
14:08 |
Sent To |
|
|
| Notes |
| 2006-09-28 00:00:00 | *** DENIED *** | | | 1) PLEASE SUBMIT A LETTER FROM AN | | | ENGINEER THATS ASSOCIATED WITH THE | | | CLOTHES DRYER MANUFACTURE THAT STATES | | | THE USE OF A BOSTER FAN IN THE DRYER | | | VENT WILL NOT VOID THE DRYERS WARRANTY. | | | | | | 2) PLEASE SUBMIT DETAILED MANUFACTURE'S SPECIFICATION'S | | | AND INSTALLATION | | | INSTRUCTIONS FOR THE CLOTHES DRYER | | | BOSTER FAN. | | | | | | MECHANICAL PLAN REVIEW BY; | | | TOM GORDON (561) 805-6729. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2007-02-07 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2007-02-07 |
Time |
07:29 |
Rev Time |
0.00 |
| Received By |
jleech |
Date |
2007-02-07 |
Time |
07:29 |
Sent To |
|
|
| Notes |
| 2007-02-07 07:32:19 | REVISION; REDUCED SIZE OF SHOWER ROOM. STILL ADA | | | COMPLIANT. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2006-11-08 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2006-11-08 |
Time |
07:30 |
Rev Time |
0.00 |
| Received By |
jleech |
Date |
2006-11-08 |
Time |
07:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2006-10-03 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2006-10-03 |
Time |
14:08 |
Rev Time |
0.00 |
| Received By |
jleech |
Date |
2006-10-03 |
Time |
14:08 |
Sent To |
|
|
| Notes |
| 2006-10-03 00:00:00 | DENIED; | | | 1.DOOR SWING IN BREAK ROOM AND SHOWER | | | ROOM SWINGS INTO THE CLEAR FLOOR SPACE | | | OF THE HANDICAP FIXTURES. | | | 2.SANITARY RISER DIAGRAM; SHOWER IS NOT | | | VENTED. | | | 3.AUTOMATIC CLOTHES WASHER BRANCH DRAIN | | | REQUIRED TO BE 3". SEE SECTION406.3. | | | 4.BREAK SINK NOT IN SAME LOCATION AS | | | FLOOR PLAN (DETAIL ON PAGE LS.1 #3) | | | 5.WATER HEATER DETAIL PAGE P.1 THERMAL | | | EXPANTION CONTROL REQUIRED. SECTION | | | 607.3 SHOW TYPE AND LOCATION. | | | 6.SHOW TERMINATION POINT OF PAN DRAIN | | | AND RELIEF LINE, ALSO SIZE OF PIPE USED. | | | 7.AIR ADMITTANCE VALVES CAN ONLY BE USED | | | ON THE TOP 4 BRANCH INTERVALS. SECTION | | | 917.3.1 IS THERE 3 FLOORS OR LESS ABOVE | | | THE 12 TH FLOOR? | | | 8.WATER RISER DIAGRAM; SHOW WATER HANNER | | | ARRESTORS WHERE REQUIRED ON PLANS AND | | | SPEC OUT SIZE AND MANUFACTURE. | | | PLUMBING PLAN REVIEW BY; | | | JOHN LEECH | | | 805-6695 |
|
|