| 2006-11-15 14:23:29 | ** MECHANICAL REVISION ** |
| | *** DENIED *** |
| | 1) THE RETURN AIR TRANSFER DUCTS TO THE BEDROOMS ARE |
| | UNDER-SIZED, SEE NOTE #2. |
| | |
| | 2) BALANCED RETURN AIR. |
| | MAY BE ACHIEVED BY. |
| | (A)TRANSFER DUCTS MAY ACHIEVE THIS BY |
| | INCREASING THE RETURN TRANSFER ONE AND |
| | ONE HALF TIMES THE CROSS SECTIONAL AREA |
| | (SQUARE INCHES) OF THE SUPPLY DUCT |
| | ENTERING THE ROOM OR SPACE IT'S SERVING |
| | AND THE DOOR HAVING AT LEAST AN |
| | UNRESTRICTED 1 INCHUNDERCUT TO ACHIEVE |
| | PROPER RETURN AIR BALANCE. |
| | (B)TRANSFER GRILLES SHALL USE 50 |
| | SQUARE INCHES (OF GRILLE AREA) TO 100 |
| | CFM (OF SUPPLY AIR) FOR SIZING |
| | THROUGH-THE-WALL TRANSFER GRILLES AND |
| | USING AN UNRESTRICTED 1-INCH |
| | UNDERCUTTING OF DOORS TO ACHIEVE PROPER |
| | RETURN AIR BALANCE |
| | (C)HABITABLE ROOMS ONLY SHALL BE |
| | REQUIRED TO MEET THESE REQUIREMENTS FOR |
| | PROPER BALANCED RETURN AIR EXCLUDING |
| | BATHROOMS, CLOSETS, STORAGE ROOMS AND |
| | LAUNDRY ROOMS, EXCEPT THAT ALL SUPPLY |
| | AIR INTO THE MASTER SUITE SHALL BE |
| | INCLUDED. PER 2004 FBC/R M1602.4 . |
| | |
| | 3) ENGINEER LUIS A. LOPEZ NEEDS TO SIGN AND SEAL THE |
| | PLANS AS HIS NAME IS THE TITLE BLOCK, PER FAC |
| | 61G1-16.003. |
| | |
| | 4) A MECHANICAL PERMIT WILL BE REQUIRED FOR THE A/C |
| | WORK. PLEASE RESUBMIT MECHANICAL PLANS WITH APPLICATION |
| | FOR MECHANICAL PERMIT. |
| | |
| | MECHANICAL PLAN REVIEW BY; |
| | TOM GORDON (561) 805-6729. |