| Plan Review Stops For Permit 06090048 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2006-09-01 |
|
|
Cont ID |
|
| Sent By |
kconrad |
Date |
2006-09-01 |
Time |
15:15 |
Rev Time |
0.00 |
| Received By |
kconrad |
Date |
2006-09-01 |
Time |
15:15 |
Sent To |
FIRE |
|
| Notes |
| 2006-09-01 00:00:00 | THIS WAS REVIEWED AS A PRE-INSPECT. THE | | | PRO-SET COUPLINGS AT THE WASTE RISERS | | | WILL BE REPLACED AND THE SUBMITTED U/L | | | ASSEMBLIES MUST BE APPLIED TO THE | | | APPLICABLE SLAB PENETRATION.REQUIRE FIRE | | | REVIEW.A PLUMBING PRE-INSPECT WAS | | | APPROVED BY PES. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2006-09-01 |
|
|
Cont ID |
|
| Sent By |
mawillia |
Date |
2006-09-01 |
Time |
15:40 |
Rev Time |
0.00 |
| Received By |
mawillia |
Date |
2006-09-01 |
Time |
15:39 |
Sent To |
|
|
| Notes |
|
|
|