Plan Review Details - Permit 06080861
Plan Review Stops For Permit 06080861
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2006-09-23 Cont ID  
Sent By rnuquist Date 2006-09-23 Time 14:41 Rev Time 0.00
Received By rnuquist Date 2006-09-23 Time 14:41 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2007-01-05 Cont ID  
Sent By btrobaug Date 2007-01-05 Time 15:25 Rev Time 0.50
Received By btrobaug Date 2007-01-05 Time 15:19 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2006-10-16 Cont ID  
Sent By btrobaug Date 2006-10-16 Time 16:31 Rev Time 0.50
Received By btrobaug Date 2006-10-16 Time 16:31 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2006-09-01 Cont ID  
Sent By btrobaug Date 2006-09-01 Time 15:40 Rev Time 0.50
Received By btrobaug Date 2006-09-01 Time 15:16 Sent To M
Notes
2006-09-01 00:00:00 
  
 NONCOMPLIANT
  
 PLEASE MAKE THE FOLLOWING CORRECTIONS
 FOR CODE COMPLIANCE AND RESUBMIT FOR
 REVIEW.
  
 1) PROVIDE A PANEL SCHEDULE FOR THE
 EMERGENCY/GENERATOR PANEL(S). CALCULATE
 THE LOADS FOR THE INDIVIDUAL PANELS AS
 IT APPEARS TWO PANELS ARE BEING FED FROM
 THE ATS. PLEASE CLARIFY.
  
 2} THERE MUST BE A DISCONNECT FROM THE
 GENERATOR WHERE THE CONDUCTORS ENTER THE
 BUILDING. IF ALL DISCONNECTS CANNOT BE
 GROUPED PER 230.72, SEE THAT ALL
 ARTICLES FROM 225.31 THROUGH 225.39, ARE
 COMPLIED WITH.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718
 [email protected]
  
  
  

Review Stop G GAS REVIEW
Rev No 5 Status P Date 2007-05-03 Cont ID  
Sent By mperson Date 2007-05-03 Time 15:49 Rev Time 0.45
Received By mperson Date 2007-05-03 Time 15:49 Sent To PC
Notes
2007-05-03 16:02:34REVISION: CHANGE LAYOUT AND LENGTH OF PIPE.
  
 ****************PROVISO****************
 A}PER FBC-2004 FUEL GAS SECTION 409.5 EQUIPMENT
 SHUTOFF VALVE: EACH APPLIANCE SHALL BE PROVIDED WITH A
 SHUTOFF VALVE SEPERATE FROM THE APPLIANCE. THE SHUTOFF
 VALVE SHALL BE LOCATED IN THE SAME ROOM AS THE
 APPLIANCE, NOT FURTHER THAN 6 FEET FROM THE APPLIANCE,
 AND SHALL BE INSTALLED UPSTREAM FROM THE UNION,
 CONNECTOR OR QUICK DISCONNECT DEVICE IT SERVES. SUCH
 SHUTOFF VALVES SHALL BE PROVIDED WITH ACCESS.
  
 B} PER FBC-2004 FUEL GAS, SECTION 404.13.3AN
 INSULATED COPPER TRACER WIRE SHALL BE INSTALLED
 ADJACENT TO UNDERGROUND NONMETALLIC GAS PIPING. THE
 TRACER WIRE SIZE SHALL NOT BE LESS THAN 18 AWG AND THE
 INSULATION TYPE SHALL BE SUITABLE FOR DIRECT BURIAL.
  
 C} PER FBC-2004 FUEL GAS SECTION 408.4 A SEDIMENT TRAP
 SHALL BE INSTALLED DOWNSTREAM OF THE EQUIPMENT SHUTOFF
 VALVE AS CLOSE TO THE INLET OF THE EQUIPMENT AS
 PRACTICAL.

Review Stop G GAS REVIEW
Rev No 4 Status P Date 2007-01-10 Cont ID  
Sent By mperson Date 2007-01-10 Time 11:18 Rev Time 0.33
Received By mperson Date 2007-01-10 Time 11:17 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status F Date 2006-11-15 Cont ID  
Sent By mperson Date 2006-11-15 Time 08:18 Rev Time 0.33
Received By mperson Date 2006-11-15 Time 08:18 Sent To PC
Notes
2006-11-15 08:56:25UNSAT 2ND TIME
 REFERENCE: FBC-2004 FUEL GAS AND FBC-2004 CHAPTER 1
  
 THE PRIVIOUS GAS PLAN REVIEW COMMENTS FROM 10/18/06
 WERE NOT ADDRESSED. PLEASE KNOW THAT A GAS PERMIT
 APPLICATION WITHOUT DRAWINGS OF THE GAS SYSTEM HAS BEEN
 SUBMITTED WITH THE MASTER GEN/RES APPLICATION. THE
 FOLLOWING INFORMATION IS REQUIRED FOR GAS PLAN REVIEW
 IN ORDER TO RECIEVE A GEN/RES PERMIT:
  
 1. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE.
  
 2. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
  
 3. TYPE OF GAS, (LP OR NATURAL)
  
 4. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2004 FUEL GAS CODE SECS. 401.8
 THRU 402.6.1 AND TABLES 402.4(1) THRU
 402.4(33).
  
 5. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2004 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES A.3.1(4).
  
 6. SUBMIT CALCULATIONS FOR COMBUSTION
 AIR (IF APPLICABLE) PER FBC-2004 FUEL
 GAS CODE SECTION 304.
  
 7. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2004 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
  
 8. SUBMIT A DETAIL SHOWING THE TYPE,
 LOCATION, SIZE AND TERMINATION OF THE
 GAS VENTS PER FBC-2004 FUEL GAS CODE
 SECS. 502 THRU 505.
  
 9. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2
  
 10. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
  
 11. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES
 PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
  
 12. FBC-2004 CHAPTER 1,SECTION 106.3.4.2:
 THE PERSON RESPONSIBLE FOR THE DESIGN OF
 THE DRAWING SHALL CLEARLY PRINT AND SIGN
 NAME, AND ALSO DATE DRAWING. PLEASE DO
 THIS PRIOR TO RESUBMITTING.
  
 END OF COMMENTS:
  
 REVIEW BY MIKE PERSON
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL [email protected]
 UNDER SUPERVISION OF K.STEVENS
 (561) 805-6721
  
  
  
  
  
  
  
  
  
  
  
  
  

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2006-10-18 Cont ID  
Sent By mperson Date 2006-10-18 Time 10:26 Rev Time 0.33
Received By mperson Date 2006-10-18 Time 10:26 Sent To M
Notes
2006-10-18 10:45:58******UNSAT******
 REFERENCE: FBC-2004 FUEL GAS AND CHAPTER 1
  
 PLEASE KNOW THAT A GAS PERMIT APPLICATION WITHOUT
 DRAWINGS OF THE GAS SYSTEM HAS BEEN SUBMITTED WITH THE
 MASTER GEN/RES PERMIT. THE FOLLOWING INFORMATION IS
 REQUIRED FOR GAS PLAN REVIEW:
  
 1. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE.
  
 2. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
  
 3. TYPE OF GAS, (LP OR NATURAL)
  
 4. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2004 FUEL GAS CODE SECS. 401.8
 THRU 402.6.1 AND TABLES 402.4(1) THRU
 402.4(33).
  
 5. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2004 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES A.3.1(4).
  
 6. SUBMIT CALCULATIONS FOR COMBUSTION
 AIR (IF APPLICABLE) PER FBC-2004 FUEL
 GAS CODE SECTION 304.
  
 7. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2004 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
  
 8. SUBMIT A DETAIL SHOWING THE TYPE,
 LOCATION, SIZE AND TERMINATION OF THE
 GAS VENTS PER FBC-2004 FUEL GAS CODE
 SECS. 502 THRU 505. (IF APPLICABLE)
  
 9. SUBMIT MANUFACTURE SHEETS FOR ALL GAS EQUIPMENT TO
 VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2
  
 10. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
  
 11. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND APPURTENANCES
 PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
  
 12. FBC-2004 CHAPTER 1,SECTION 106.3.4.2:
 THE PERSON RESPONSIBLE FOR THE DESIGN OF
 THE DRAWING SHALL CLEARLY PRINT AND SIGN
 NAME, AND ALSO DATE DRAWING. PLEASE DO
 THIS PRIOR TO RESUBMITTING.
  
  
 END OF COMMENTS:
  
 REVIEW BY MIKE PERSON
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL [email protected]
 UNDER SUPERVISION OF K.STEVENS
 (561) 805-6721
  
  
  
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2006-09-06 Cont ID  
Sent By mperson Date 2006-09-06 Time 13:58 Rev Time 0.15
Received By mperson Date 2006-09-06 Time 13:58 Sent To B
Notes
2006-09-06 00:00:00CONTRACTOR INFORMATION
 NOTE: GAS PERMIT REQUIRED. GAS CONTRAC-
 TOR TO SUBMIT PLANS WITH PERMIT APPLICA-
 TION. ALL GAS INSPECTIONS TO BE COMPLETE
 BEFORE FINAL GEN/RES INSPECTION.
  
 ******IMPROTANT INFORMATION******
 AS OF 8/25/06 GENERATOR (GEN/RES AND
 GEN/COM) PERMIT APPLICATIONS SHALL NOT
 BE ACCEPTED UNLESS THE ELECTRICAL INFOR-
 MATION AND GAS (OR DIESEL) INFORMATION
 IS ALL SUBMITTED AT THE SAME TIME. THE
 GENERATOR, ELECTRICAL AND GAS/DIESEL IN-
 FORMATION WILL BE ROUTED TOGETHER. THIS
 WILL ENSURE THAT ALL OF THE INFORMATION
 (PARTICULARLY THE MANUFACTURER'S SPECI-
 FICATIONS AND INSTALLATION INSTRUCTIONS)
 ARE AVAILABLE TO ALL PLAN REVIEWERS.
  
 REVIEW BY MIKE PERSON
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL [email protected]
 UNDER SUPERVISION OF K.STEVENS
 (561) 805-6721

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2007-04-26 Cont ID  
Sent By adarroug Date 2007-04-26 Time 16:01 Rev Time 0.00
Received By adarroug Date 2007-04-26 Time 16:01 Sent To G
Notes
2007-04-26 16:01:46TO "G" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2006-12-27 Cont ID  
Sent By adarroug Date 2006-12-27 Time 14:39 Rev Time 0.00
Received By adarroug Date 2006-12-27 Time 14:39 Sent To E
Notes
2006-12-27 14:43:35TO "BTROBAUG" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2006-11-07 Cont ID  
Sent By adarroug Date 2006-11-07 Time 16:01 Rev Time 0.00
Received By adarroug Date 2006-11-07 Time 16:00 Sent To G
Notes
2006-11-07 16:02:11TO "G" BOX/RESUB--"E" REVIEW NOT NEEDED. PLANS PASSED
 BY "E" 10/16/06

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-10-05 Cont ID  
Sent By adarroug Date 2006-10-05 Time 13:35 Rev Time 0.00
Received By adarroug Date 2006-10-05 Time 13:35 Sent To E
Notes
2006-10-05 00:00:00TO "BTROBAUG" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-08-22 Cont ID  
Sent By adarroug Date 2006-08-22 Time 14:29 Rev Time 0.00
Received By adarroug Date 2006-08-22 Time 14:29 Sent To E
Notes
2006-08-22 00:00:00TO "GEN-RES" "E"

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-09-23 Cont ID  
Sent By rnuquist Date 2006-09-23 Time 14:41 Rev Time 0.00
Received By rnuquist Date 2006-08-12 Time 14:07 Sent To PC
Notes
2006-08-12 00:00:00TO "Z" BOX

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2006-10-18 Cont ID  
Sent By tgordon Date 2006-10-18 Time 13:39 Rev Time 0.15
Received By tgordon Date 2006-10-18 Time 13:39 Sent To Z
Notes
2006-10-18 13:40:26RE-STAMP.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2006-09-05 Cont ID  
Sent By tgordon Date 2006-09-05 Time 16:20 Rev Time 0.15
Received By tgordon Date 2006-09-05 Time 16:20 Sent To G
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2006-10-26 Cont ID  
Sent By mmclean Date 2006-10-26 Time 14:00 Rev Time 0.00
Received By mmclean Date 2006-10-26 Time 14:00 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2006-08-19 Cont ID  
Sent By mmclean Date 2006-08-19 Time 17:51 Rev Time 0.00
Received By mmclean Date 2006-08-19 Time 17:51 Sent To I
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved