Review Stop G GAS REVIEW
Rev No 2 Status F Date 2006-08-07 Cont ID  
Sent By mperson Date 2006-08-07 Time 11:04 Rev Time 0.33
Received By mperson Date 2006-08-07 Time 11:04 Sent To PC
Notes
2006-08-07 00:00:00******DENIED 2ND TIME******
 REFERENCE: FBC-2004 FUEL GAS
  
 THE FOLLOWING INFORMATION IS STILL
 REQUIRED FOR GAS PLAN REVIEW ON THE
 ISOMETRIC DRAWING:
  
 1. A GAS PERMIT CAN NOT BE ISSUED UNTIL
 A GEN/RES PERMIT APPLICATION HAS BEEN
 APPLIED FOR AND APPROVED BY ZONING FOR
 THE GENERATOR LOCATION. (NOTE: THERE IS
 STILL NO GENERATOR PERMIT APPLICATION
 APPLIED FOR AT SAID ADDRESS)
 2. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE. ( NOTE: THE ISOMETRIC
 SUBMITTED IN THE RESUBMITTAL IS
 UNACCEPTABLE, IT SHALL INDICATE THE
 EXISTING SYSTEM TEE TIE IN, 1ST AND 2ND
 STAGE REGULATORS, BOTH ABOVE AND BELOW
 GROUND PIPING, VALVES AND DIRT LEGS.THE
 ONLY INDICATION OF PIPE IS THE 50' OF
 UNDER GROUND PE, ALL PIPES AND
 CORRESPONDING LENGTHS SHALL BE INDICATED
 ON THE ISOMETRIC DRAWING, NEW ABOVE AND
 BELOW GROUND AND THE EXISTING SYSTEM TO
 THE BEST OF THE INFORMATION KNOWN.)
 3. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 (NOTE: AGAIN ALL PIPE MATERIAL AND SIZES
 SHALL BE INDICATED ON THE ISOMETRIC
 DRAWING.)
 4. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2004 FUEL GAS CODE SECS. 401.8
 THRU 402.6.1 AND TABLES 402.4(1) THRU
 402.4(33).(NOTE: AGAIN THE BTU LOAD OF
 THE SYSTEM SHALL BE INDICATED ON THE
 ISOMETRIC DRAWING. THIS INCLUDES THE
 EXISTING SYSTEM AS WELL AS THE NEW
 GENERATOR. PLEASE SEE ATTACHED PERMIT
 INFORATION INDICATING EXISTING GAS AT
 SAID ADDRESS.)
 5. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2004 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES A.3.1(4). (NOTE: THIS
 INCLUDES THE EXISTING SYSTEM BECAUSE
 SYSTEM IS SIZED BY THE LONGEST LENGTH
 METHOD.)
 6. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2 (NOTE:
 MANUFACTURE CUT SHEETS ON THE 1ST AND
 2ND STAGE REGULATORS.TWO COPIES
 REQUIRED)
  
 **IN ORDER TO EXPIDITE PLAN REVIEW: WHEN
 RESUBMITTING, PLEASE REPLACE ONLY SHEETS
 WHICH HAVE CHANGED AND PROVIDE ONE COPY
 OF ALL OLD/VOIDED SHEETS FOR REFERENCE
 ONLY.
  
 END OF COMMENTS:
  
 REVIEW BY MIKE PERSON
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL [email protected]
 UNDER SUPERVISION OF K.STEVENS
 (561) 805-6721
  
  
  
  
  
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2006-07-05 Cont ID  
Sent By mperson Date 2006-07-05 Time 15:12 Rev Time 0.45
Received By mperson Date 2006-07-05 Time 15:12 Sent To PC
Notes
2006-07-05 00:00:00******DENIED******
 REFERENCE: FBC-2004 FUEL GAS
 FBC-2004 CHAPTER 1
  
 THE FOLLOWING INFORMATION IS REQUIRED
 FOR PLAN REVIEW FOR A GAS PERMIT:
  
 1. A GAS PERMIT CAN NOT BE ISSUED UNTIL
 A GEN/RES PERMIT APPLICATION HAS BEEN
 APPLIED FOR AND APPROVED BY ZONING FOR
 THE GENERATOR LOCATION.
 2. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE.
 3. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 4. TYPE OF GAS, (LP OR NATURAL)PLEASE
 INDICATE ON DRAWING.
 5. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2004 FUEL GAS CODE SECS. 401.8
 THRU 402.6.1 AND TABLES 402.4(1) THRU
 402.4(33).
 6. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER OR TANK), TO THE MOST
 REMOTE OUTLET IN THE BUILDING AND/OR
 SYSTEM PER FBC-2004 FUEL GAS CODE
 APPENDIX A - USE OF CAPACITY TABLES
 A.3.1(4).
 7. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2004 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
 PROPANE 10 PSI
 8. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2
 9. FBC-2004 CHAPTER 1, SECTION 106:
 THE PERSON RESPONSIBLE FOR THE DESIGN OF
 THE DRAWING SHALL CLEARLY PRINT AND SIGN
 NAME, AND ALSO DATE DRAWING.
  
 ***PLEASE SEE ATTACHED, CITY OF WEST
 PALM BEACH, GAS PERMIT APPLICATION
 REQUIREMENTS FOR REFERENCE FOR
 RESUBMITTAL.
  
 END OF COMMENTS:
  
 REVIEW BY MIKE PERSON
 (561) 805-6730
 FAX (561) 805-6731
 E-MAIL [email protected]
 UNDER SUPERVISION OF K.STEVENS
 (561) 805-6721
  
  
  
  
  
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-07-28 Cont ID  
Sent By adarroug Date 2006-07-28 Time 15:08 Rev Time 0.00
Received By adarroug Date 2006-07-28 Time 15:08 Sent To G
Notes
2006-07-28 00:00:00TO "G" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-07-28 Cont ID  
Sent By adarroug Date 2006-07-05 Time 15:08 Rev Time 0.00
Received By adarroug Date 2006-06-30 Time 09:46 Sent To  
Notes
2006-06-30 00:00:00TO "G" BOX