Plan Review Details - Permit 06060973
Plan Review Stops For Permit 06060973
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2006-07-05 Cont ID  
Sent By alange Date 2006-07-05 Time 16:37 Rev Time 0.50
Received By alange Date 2006-07-05 Time 16:37 Sent To  
Notes
2006-07-05 00:00:00DENIED
  
 1.SUBMIT ORIGONAL SIGNED AND SEALED
 CALCULATIONS FROM HILLMAN ENGINEERING.
  
 ART LANGE
 BUILDING PLANS EXAMINER
 805-6672

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2006-06-30 Cont ID  
Sent By btrobaug Date 2006-06-30 Time 18:03 Rev Time 0.75
Received By btrobaug Date 2006-06-30 Time 17:22 Sent To G
Notes
2006-06-30 00:00:00NONCOMPLIANT
  
  
 NONCOMPLIANT
  
 PLEASE MAKE THE FOLLOWING CORRECTIONS
 FOR CODE COMPLIANCE AND RESUBMIT FOR
 REVIEW.
  
 1} THE VALUE ON THE APPLICATION MUST
 INCLUDE THE COST OF LABOR AND MATERIAL
 FOR THE INSTALLATION OF ALL COMPONENTS
 UNDER THE COPE OF THIS PERMIT. FBC
 108.3.
  
 2} PLEASE LOCATE ALL SERVICE EQUIPMENT
 ON THE PLAN, METER ENCLOSURE, GENERATOR,
 TRANSFER SWITCH, DISCONNECTS AND PANELS,
 SO THAT COMPLIANCE WITH ARTICLES 225 AND
 230 CAN BE REVIEWED.
  
 3} THE PERSON TAKING RESPONSIBILITY FOR
 THE DESIGN MUST PRINT AND SIGN THEIR
 NAME TO SAME PER 106.3.4.2.
  
 4} PROVIDE A LOAD CALCULATIION FOR THE
 LOAD BEING SERVED BY THE GENERATOR. IF
 USING 220.35, SHOW THE CALCULATION, NOT
 JUST WATTHOURS.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718
 [email protected]
 FAX/:561/659-8026
  

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2006-07-03 Cont ID  
Sent By mperson Date 2006-07-03 Time 10:26 Rev Time 0.15
Received By mperson Date 2006-07-03 Time 10:26 Sent To B
Notes
2006-07-03 00:00:00NOTE: GAS PERMIT REQUIRED. GAS CONTRAC-
 TOR TO SUBMIT PLANS WITH PERMIT APPLICA-
 TION. ALL GAS INSPECTIONS TO BE COMPLETE
 BEFORE FINAL GEN/RES INSPECTION.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-06-27 Cont ID  
Sent By adarroug Date 2006-06-27 Time 09:36 Rev Time 0.00
Received By adarroug Date 2006-06-27 Time 09:36 Sent To E
Notes
2006-06-27 00:00:00TO "GEN-RES" BOX "E"

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-07-05 Cont ID  
Sent By alange Date 2006-07-05 Time 16:38 Rev Time 0.00
Received By alange Date 2006-06-19 Time 16:33 Sent To  
Notes
2006-06-19 00:00:00TO "Z" BOX

Review Stop Z ZONING
Rev No 1 Status F Date 2006-06-25 Cont ID  
Sent By mmclean Date 2006-06-25 Time 14:01 Rev Time 0.00
Received By mmclean Date 2006-06-25 Time 14:01 Sent To I
Notes
2006-06-25 00:00:00 
 DENIED,
 1. NEED TO SHOW THE LOCATION OF THE
 PROPOSED GENERATOR CLEARLY ON TWO COPY
 OF CURRENT SURVEY WITH THE DIMENSION OF
 PROPOSED GENERATOR.
 2. NEED TO SHOW THE SETBACK OF THE
 STRUCTURE ON THE TWO COPY OF CURRENT
 SURVEY.
 NOTE: SEC 94-303 MECHANICAL/POOL
 EQUIPMENT/GENERATOR MAY NOT PROJECT MORE
 THAN FOUR FEET INTO A SETBACK.
  
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720