Plan Review Details - Permit 06060637
Plan Review Stops For Permit 06060637
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2006-07-24 Cont ID  
Sent By rchokshi Date 2006-07-24 Time 13:25 Rev Time 0.00
Received By rchokshi Date   Time   Sent To  
Notes
2006-07-24 00:00:00PASS WITH THE FOLLOWING REQUIREMENTS:
 1. DRIVE & SIDE WALK MUST MEET CITY
 CODE.
 2. MUST MEET ALSO IF THERE IS ANY
 TYPICAL PAVER STONE DRIVEWAY APPROACH
 DETAILS ( DETAIL ATTACHED)
  
 RASIK CHOKSHI 805-6723

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2006-06-09 Cont ID  
Sent By tadams Date 2006-06-09 Time 14:56 Rev Time 0.00
Received By tadams Date   Time   Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-06-29 Cont ID  
Sent By adarroug Date 2006-06-29 Time 11:43 Rev Time 0.00
Received By adarroug Date 2006-06-29 Time 11:43 Sent To ENG
Notes
2006-06-29 00:00:00TO "ENG" BOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-06-22 Cont ID  
Sent By adarroug Date 2006-06-22 Time 16:18 Rev Time 0.00
Received By adarroug Date 2006-06-22 Time 16:18 Sent To Z
Notes
2006-06-22 00:00:00TO "Z" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-06-18 Cont ID  
Sent By mmclean Date 2006-06-18 Time 19:43 Rev Time 0.00
Received By mmclean Date 2006-06-12 Time 13:45 Sent To  
Notes
2006-06-12 00:00:00TO "Z" BOX

Review Stop Z ZONING
Rev No 2 Status P Date 2006-06-28 Cont ID  
Sent By mmclean Date 2006-06-28 Time 15:46 Rev Time 0.00
Received By mmclean Date 2006-06-28 Time 15:46 Sent To I
Notes
2006-06-28 00:00:00ENGINEERING 06061250 (APPROACH)

Review Stop Z ZONING
Rev No 1 Status F Date 2006-06-18 Cont ID  
Sent By mmclean Date 2006-06-18 Time 19:40 Rev Time 0.00
Received By mmclean Date 2006-06-18 Time 19:40 Sent To I
Notes
2006-06-18 00:00:00DENIED,
 1. MUST SHOW THE PROPOSED WORK ON TWO
 COPY OF SURVEY.
 2. MUST INDICATE THE DRIVEWAY/WALKWAY
 THAT WILL BE REMOVED ON THE TWO COPY OF
 CURRENT SURVEY.
 3. MUST PROVIDE THE DIMENSIO (LENGTH &
 WIDTH) OF THE PROPOSED DRIVEWAY/WALKWAY
 AND PROVIDE THE DIMENSION OF THE
 EXISTING DRIVEWAY/WALKWAY TO REMAIN.
 4. MUST PROVIDE THE SETBACK OF THE
 PROPOSED SLAB (FROM THE SIDE PROPERTY
 LINE)
  
 NOTE: AN APPROACH PERMIT IS
 REQUIRED/GENERATE A PERMIT NUMBER.
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved