Plan Review Details - Permit 06050814
Plan Review Stops For Permit 06050814
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2006-07-28 Cont ID  
Sent By amorse Date 2006-07-28 Time 12:59 Rev Time 0.00
Received By amorse Date 2006-07-28 Time 12:59 Sent To PC
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2006-07-18 Cont ID  
Sent By amorse Date 2006-07-18 Time 14:39 Rev Time 0.50
Received By amorse Date 2006-07-18 Time 14:39 Sent To PC
Notes
2006-07-18 00:00:00 
  
 DENIED
  
 THE FOLLOWING NOTE WAS NOT ADDRESSED ON
 THE PREVIOUS REVIEW:
  
 1) NOTE#2 PROVIDE DOCUMENTATION OF
 APPROVAL OR EXEMPTION FROM ARMY CORP OF
 ENGINEERS AND FLORIDA DEPT. OF
 ENVIROMENTAL PROTECTION.
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2006-06-23 Cont ID  
Sent By amorse Date 2006-06-23 Time 07:05 Rev Time 0.75
Received By amorse Date 2006-06-23 Time 07:05 Sent To PC
Notes
2006-06-23 00:00:00 
  
 DENIED
  
 1) PROVIDE LETTER OF FROM CONDO ASSN FOR
 WORK IN COMMON AREAS
  
 2) PROVIDE DOCUMENTATION OF APPROVAL OR
 EXEMPTION FROM ARMY CORP OF ENGINEERS
 AND FLORIDA DEPT. OF ENVIROMENTAL
 PROTECTION.
  
 3) PROVIDE SIGNED AND SEALED DRAWINGS
 WITH PILE SIZES AND INSTALLATION. DETAIL
 PLAN AND ELEVATION OF LIFT AND PILES
 WITH CONNECTIONS,ETC.
  
 4) NO ELECTRICAL CONTACTOR ON PERMIT
 APPLICATION. ELECTRICAL PERMIT WILL BE
 REQUIRED INCLUDE ALL SPECIFICATIONS,
 MOTOR LOADS, ETC. WITH APPLICATION
  
 BLDG PLAN REVIEW
 ADRIAN MORSE
 561-805-6716

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2006-07-28 Cont ID  
Sent By adarroug Date 2006-07-28 Time 09:52 Rev Time 0.00
Received By adarroug Date 2006-07-28 Time 09:52 Sent To B
Notes
2006-07-28 00:00:00TO "AMORSE" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2006-07-21 Cont ID  
Sent By adarroug Date 2006-07-21 Time 09:41 Rev Time 0.00
Received By adarroug Date 2006-07-21 Time 09:41 Sent To Z
Notes
2006-07-21 00:00:00TO "Z" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2006-07-18 Cont ID  
Sent By adarroug Date 2006-07-18 Time 11:51 Rev Time 0.00
Received By adarroug Date 2006-07-18 Time 11:51 Sent To B
Notes
2006-07-18 00:00:00TO "AMORSE" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2006-07-08 Cont ID  
Sent By adarroug Date 2006-07-08 Time 17:43 Rev Time 0.00
Received By adarroug Date 2006-07-08 Time 17:43 Sent To Z
Notes
2006-07-08 00:00:00TO "Z" BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-06-07 Cont ID  
Sent By adarroug Date 2006-06-07 Time 18:47 Rev Time 0.00
Received By adarroug Date 2006-06-07 Time 18:47 Sent To B
Notes
2006-06-07 00:00:00TO "MISC' BOX#2

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2006-06-23 Time   Rev Time 0.00
Received By adarroug Date 2006-05-23 Time 11:48 Sent To  
Notes
2006-05-23 00:00:00TO "Z" BOX

Review Stop Z ZONING
Rev No 3 Status P Date 2006-07-23 Cont ID  
Sent By mmclean Date 2006-07-23 Time 16:06 Rev Time 0.00
Received By mmclean Date 2006-07-23 Time 16:06 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2006-07-16 Cont ID  
Sent By mmclean Date 2006-07-16 Time 14:31 Rev Time 0.00
Received By mmclean Date 2006-07-16 Time 14:31 Sent To I
Notes
2006-07-16 00:00:00DENIED, 2ND REQUEST.
 1. PLEASE PROVIDE TWO COPY OF EACH THE
 APPROVAL OR EXEMPTION FROM ARMY CORP OF
 ENGINEERS AND FLORIDA DEPT. OF
 ENVIRONMENTAL PROTECTION.
  
 NOT INCLUDED IN THE PACKAGE.
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720

Review Stop Z ZONING
Rev No 1 Status F Date 2006-06-07 Cont ID  
Sent By mmclean Date 2006-06-07 Time 07:26 Rev Time 0.00
Received By mmclean Date 2006-06-07 Time 07:26 Sent To I
Notes
2006-06-22 00:00:00RECEIVED A FAX COPY OF SURVEY SHOWING
 THE LOCATION OF THE PROPOSED BOATLIFT.
 CONTRACTOR WILL PROVIDE THE DEPARTMENT
 OF ENVIORNMENTAL PROTECTION (DEP) & ARMY
 CORPS OF ENGINEERS (THE CORPS) APPROVAL
 AND THE HOA APPROVAL FOR THE PROPOSED
 WORK.
2006-06-07 00:00:00DENIED,
 1. MUST PROVIDE TWO COPY CURRENT SURVEY
 SHOWING THE EXISTING DOCK AND LOCATION
 OF THE PROPOSED BOATLIFT.
 2. IF A CLASS A WAS APPLIED, NEED TO
 AMEND THE CLASS A FOR A BOATLIFT (SEE
 PLANNER, PLANNING & ZONING DEPT
 822-1435).
 3. MUST PROVIDE THE DEPARTMENT OF
 ENVIORNMENTAL PROTECTION (DEP) & ARMY
 CORPS OF ENGINEERS (THE CORPS) APPROVAL.
 4. MUST BE CONTRUCTRED WITHIN THE MIDDLE
 1/3 OF LOT.
  
 SEC 91-304 (E) DOCKS ZONING & LAND DEVP.
 REGULATIONS.
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720