Plan Review Details - Permit 06040952
Plan Review Stops For Permit 06040952
Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-05-04 Cont ID  
Sent By adarroug Date 2006-05-04 Time 09:32 Rev Time 0.00
Received By adarroug Date 2006-05-04 Time 09:32 Sent To P
Notes
2006-05-04 00:00:00TO "KSTEVENS" DESK/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-05-01 Cont ID  
Sent By kstevens Date 2006-05-01 Time 18:31 Rev Time 0.00
Received By kstevens Date 2006-04-29 Time 20:02 Sent To  
Notes
2006-04-24 00:00:00TO "P" BOX

Review Stop P PLUMBING
Rev No 3 Status P Date 2006-05-05 Cont ID  
Sent By kstevens Date 2006-05-05 Time 10:40 Rev Time 0.00
Received By kstevens Date 2006-05-05 Time 10:40 Sent To  
Notes
2006-05-05 00:00:00 
  
  
 PASSED/PROVISO
  
  
 SEE COMMENTS 5, 7, 9, 15, 17, 18, 19,
 AND 31 FROM SECOND REVIEW OF BUILDING
 PERMIT APPLICATION FOR ISSUES THAT MAY
 AFFECT THE PIPING IN THE FIRST FLOOR
 SLAB.
 (THIS COMMENT WILL BE ATTACHED TO PLANS
 AS A PROVISO WHEN PERMIT IS ISSUED).
  
  
 SECTION 105.13 THE HOLDER OF A PHASED
 PERMIT FOR THE FOUNDATION OR OTHER PARTS
 OF A BUILDING OR STRUCTURE SHALL PROCEED
 AT THE HOLDER'S OWN RISK WITH THE
 BUILDING OPERATION AND WITHOUT ASSURANCE
 THAT A PERMIT FOR THE ENTIRE STRUCTURE
 WILL BE GRANTED. CORRECTIONS MAY BE
 REQUIRED TO MEET THE REQUIREMENTS OF THE
 TECHNICAL CODES.
 (THIS COMMENT WILL BE ATTACHED TO THE
 PLANS WHEN THE PERMIT IS ISSUED).
  
  
  
  
  
 .
  
  
  
  
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2006-05-04 Cont ID  
Sent By kstevens Date 2006-05-04 Time 18:37 Rev Time 0.00
Received By kstevens Date 2006-05-04 Time 18:36 Sent To  
Notes
2006-05-04 00:00:00DENIED
 REFERENCE: FBC-2004 PLUMBING
  
 FOUNDATION PLUMBING PERMIT
  
 FROM THE PREVIOUS REVIEW: COMMENT
 NUMBERS SHALL REMAIN THE SAME AS FIRST
 REVIEW:
  
 2. SUBMIT A STORM RISER DIAGRAM THAT
 REFLECT THE PIPING SHOWN ON SHT P-10 AND
 ALL RWL RISERS. SHOW ALL PIPE SIZES,
 SLOPE OF PIPE ETC. SECTION 106.1.5.1.3.
 ***RESPONSE NOTED, BUT NO STORM RISER
 DIAGRAM FOR THE BUILDING STORM DRAIN OR
 THE VERTICAL RISERS HAS BEEN SUBMITTED.
  
 3. SHT P-15 GREASE WASTE ISOMETRIC
 DIAGRAM RISER FLOOR SINK REQUIRED AT P/5
 DOWNSTREAM OF HUB DRAIN TO REFLECT THE
 FLOOR PLAN. SECTION 106.1.1.
 ***RESPONSE NOTED, BUT THE RISER DIAGRAM
 HAS NOT BEEN CHANGED AS REQUESTED. THE
 HUB DRAIN UPSTREAM HAS BEEN CHANGED TO A
 FUNNEL FLOOR DRAIN WHICH IS NOT
 APPROVED, AND THERE IS A HORIZONTAL DRY
 VENT WHICH IS NOT APPROVED. SECTIONS
 802.3, 802.3.2, 905.3, & 905.4.
  
 4. SEE COMMENTS 5, 7, 9, 15, 17, 18, 19,
 AND 31 FROM SECOND REVIEW OF BUILDING
 PERMIT APPLICATION FOR ISSUES THAT MAY
 AFFECT THE PIPING IN THE FIRST FLOOR
 SLAB.
 (THIS COMMENT WILL BE ATTACHED TO PLANS
 AS A PROVISO WHEN PERMIT IS ISSUED).
  
 5. SECTION 105.13 THE HOLDER OF A PHASED
 PERMIT FOR THE FOUNDATION OR OTHER PARTS
 OF A BUILDING OR STRUCTURE SHALL PROCEED
 AT THE HOLDER'S OWN RISK WITH THE
 BUILDING OPERATION AND WITHOUT ASSURANCE
 THAT A PERMIT FOR THE ENTIRE STRUCTURE
 WILL BE GRANTED. CORRECTIONS MAY BE
 REQUIRED TO MEET THE REQUIREMENTS OF THE
 TECHNICAL CODES.
 (THIS COMMENT WILL BE ATTACHED TO THE
 PLANS WHEN THE PERMIT IS ISSUED).
  
 **************NEW COMMENT***************
  
 1B. PLEASE SEE ATTACHED SHEET CONCERNING
 THE DESIGN PROFESSIONAL AND FS
 553..80(2)(B).
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2006-05-01 Cont ID  
Sent By kstevens Date 2006-05-01 Time 18:31 Rev Time 0.00
Received By kstevens Date 2006-05-01 Time 18:31 Sent To  
Notes
2006-05-01 00:00:00DENIED
 REFERENCE: FBC-2004 PLUMBING
  
 FOUNDATION PLUMBING PERMIT
  
 1. SHT P-1 1" DRAIN FROM METAL PAN ABOVE
 ELECTRICAL ROOM STILL SHOWN. METAL PAN
 HAS BEEN REMOVED. PLEASE CLARIFY.
 SECTION 106.1.1.
  
 2. SUBMIT A STORM RISER DIAGRAM THAT
 REFLECT THE PIPING SHOWN ON SHT P-10 AND
 ALL RWL RISERS. SHOW ALL PIPE SIZES,
 SLOPE OF PIPE ETC. SECTION 106.1.5.1.3.
  
 3. SHT P-15 GREASE WASTE ISOMETRIC
 DIAGRAM RISER FLOOR SINK REQUIRED AT P/5
 DOWNSTREAM OF HUB DRAIN TO REFLECT THE
 FLOOR PLAN. SECTION 106.1.1.
  
 4. SEE COMMENTS 5, 7, 9, 15, 17, 18, 19,
 AND 31 FROM SECOND REVIEW OF BUILDING
 PERMIT APPLICATION FOR ISSUES THAT MAY
 AFFECT THE PIPING IN THE FIRST FLOOR
 SLAB.
  
 5. SECTION 105.13 THE HOLDER OF A PHASED
 PERMIT FOR THE FOUNDATION OR OTHER PARTS
 OF A BUILDING OR STRUCTURE SHALL PROCEED
 AT THE HOLDER'S OWN RISK WITH THE
 BUILDING OPERATION AND WITHOUT ASSURANCE
 THAT A PERMIT FOR THE ENTIRE STRUCTURE
 WILL BE GRANTED. CORRECTIONS MAY BE
 REQUIRED TO MEET THE REQUIREMENTS OF THE
 TECHNICAL CODES.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved