Plan Review Details - Permit 06040857
Plan Review Stops For Permit 06040857
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2006-05-11 Cont ID  
Sent By alange Date 2006-05-11 Time 08:04 Rev Time 0.50
Received By alange Date 2006-05-11 Time 08:04 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2006-05-04 Cont ID  
Sent By btrobaug Date 2006-05-04 Time 17:47 Rev Time 0.50
Received By btrobaug Date 2006-05-04 Time 17:46 Sent To M
Notes
2006-05-04 00:00:00THE VALUE ON THE APPLICATION MUST
 INCLUDE THE TOTAL COST OF LABOR AND
 MATERIAL FOR THE GENERATOR , EQUIPMENT
 (TRANSFER SWITCHES, PANELS ETC.)AND PAD
 PER 108.3 FBC AS AMMENDED.
  
 PLEASE SUBMIT A SITE PLAN AND LOCATE ALL
 THE SERVICE AND GENERATOR GEAR ON SAME
 SO THAT COMPLIANCE WITH
 230.72(GROUPING), 225.31-39 FOR THE
 DISCONNECTING MEANS REQUIREMENTS AND
 250.32 FOR GROUNDING CAN BE REVIEWED.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718
 [email protected]
 FAX/:561/659-8026

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2006-05-05 Cont ID  
Sent By mperson Date 2006-05-05 Time 13:57 Rev Time 0.15
Received By mperson Date 2006-05-05 Time 13:56 Sent To B
Notes
2006-05-05 00:00:00NOTE: GAS PERMIT REQUIRED. GAS CONTRAC-
 TOR TO SUBMIT PLANS WITH PERMIT APPLICA-
 TION. ALL GAS INSPECTIONS TO BE COMPLETE
 BEFORE FINAL GEN/RES INSPECTION.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2006-05-02 Cont ID  
Sent By adarroug Date 2006-05-02 Time 09:28 Rev Time 0.00
Received By adarroug Date 2006-05-02 Time 09:28 Sent To E
Notes
2006-05-02 00:00:00TO "GEN-RES" "E"

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2006-05-11 Cont ID  
Sent By alange Date 2006-05-11 Time 08:04 Rev Time 0.00
Received By alange Date 2006-04-21 Time 15:59 Sent To  
Notes
2006-04-21 00:00:00TO "Z" BOX

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2006-05-05 Cont ID  
Sent By tgordon Date 2006-05-05 Time 09:07 Rev Time 0.15
Received By tgordon Date 2006-05-05 Time 09:07 Sent To P
Notes
2006-05-05 00:00:00*** DENIED ***
 1) PLEASE SEE ZONING NOTES.
  
 2) PLEASE BE ADVISED,GENERATOR EXHUST
 MUST BE TEN FEET AWAY FROM ANY BUILDING
 OPENINGS (WINDOWS, DOORS, ROOF & EAVE
 VENTS), AND TEN FEET AWAY FROM ADJECENT
 BUILDING OPENS. PER 2004 FBC/M 401.5.1 .
  
 MECHANICAL PLAN REVIEW BY;
 TOM GORDON (561) 805-6729.

Review Stop P PLUMBING
Rev No 1 Status N Date 2006-05-05 Cont ID  
Sent By mperson Date 2006-05-05 Time 13:56 Rev Time 0.00
Received By mperson Date 2006-05-05 Time 13:56 Sent To G
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2006-04-29 Cont ID  
Sent By mmclean Date 2006-04-29 Time 14:05 Rev Time 0.00
Received By mmclean Date 2006-04-29 Time 14:05 Sent To I
Notes
2006-04-29 00:00:00DENIED,
 1. THE GENERATOR IS SHOWN INSIDE THE THE
 STRUCTURE (AS HIGHLIGHTED ON SURVEY)
 2. GENERATOR MUST BE LOCATED BEYOND THE
 25FT FRONT SETBACK.
 3. GENERATOR CAN ONLY ENCROACH 4FT INTO
 A SETBACK.
  
  
 MICHELLE MCLEAN
 ZONING TECHNICIAN
 805-6720


Account Summary | Usage Policy | Privacy Policy